Loading…
Loading…
44,429 results • Latest
MTPS 1 TM Stage II Unit III IV Load testing of 2 ton capacity EOT crane movable 1 ton chain block trolleys and 1 TON Capacity Electrical Hoists in pumps Compressor and LP Bypass valves area for the year 2026 2027
Providing of New Recharge Structure at Various places Of Ward No3 Naraiyur Pathai (2Nos),Ward No04 Naraiyur Santhu OOral Kuttai Street Ward No05 Kummarakuppam Colony 2NosWard No07 Thottakar streetWad No09 VThottWard No11 Cuddalore
Providing Pipe line in MGR Nagar OHT to Pazhathottam in Vazhur Agaram panchayat Vandavasi Block Thiruvannamalai Dist - VP(GF) 2026 - 2027
Supply Installation Testing and Commissioning of Architectural Illumination of Army Tank Monument at Traffic Island War Memorial in Kamarajar Salai in Div 60 Zone V
NCTPS I SE M II Circle AHP Dn Renewal of corroded and damaged supporting steel structural for ash water header line for Unit II BAH during unit is in service
Construction of Mini CSC for Public place (new Desing -1) at PUPS in Irumbedu Panchayat SBM(G) 2026 2027 Vandavasi Block
Construction of Mini CSC Type-7 at PUPS Velacheri in Melkodungalore Panchayat SBM(G) - 2026 2027 Vandavasi Block
Errection of liquid based Chlorinator in Valapandal Road OHT Kalavai Town Panchayat
MTPS I TM Unit III Air Compressor System Cleaning painting renewal of Manhole door gaskets and Overhauling of Safety valves of Receiver Tanks of 1 and 2 of Instrument Air System service air system and overhauling of Refrigerant Dryer etc
Restoration Cement Concrete Road in Kalavai Town Panchayat
Providing puf panel surrounded with g.i sheet for providing temporary class room at cps - Vardharajapuram in division 85, unit 19, zone 7
Providing of Water Supply Arrangement for Hire Basis at Nallangulam in Thiruthani Municipality for Adikirthigai festival 2026.
MTPS I TM Unit III Cleaning and Hydraulic Testing of Lub oil Coolers and Working oil coolers Dismantling cleaning and assembling of Suction Strainers of BFPs and CEPs Renewal of BFP leak off line and suction discharge flange Gaskets Inspection etc
Manpower supply
MTPS I TM Unit III Overhauling of TLOCBPs H2CBPs Hydrazine Dozing Pumps Phosphate Dozing Pumps and Heater drip Pumps during AOH of 2026 27
MTPS I TM Unit III Overhauling of OLCTC System Pump LHS and RHS Inspection and cleaning of Condenser CW box steam side Hot well and OLCTC System Ball collecting screen Overhauling of 200 mm condenser air release cum vacuum breaking valve etc
Construction of Storm Water Drain at Ward No.2 Makkan Street in Kalavai Town Panchayat.
Construction of Storm Water Drain at Meenachi Nagar 4th Street and Cross Street in Podhaturpet Town Panchayat in Podhaturpet Town Panchayat
MTPS I TM Unit III Overhauling and Flange gasket renewing of valves in Heater Drain Pegging Steam to Deaerator Condenser air Auxiliary steam and Drain Water lines and gasket renewing of valves in Unit III during AOH 2026-27
MTPS I TM Unit III Renewal of piston seals and piston rod packings in HP LP Bypass valves and its spray valves actuators including servicing of oil filters during the AOH of 2026 27
MTPS I TM Unit III Carrying out Bullet cleaning by specially designed Phosphor Bronze Bullet shot of LHS and RHS of condenser tubes in condenser during AOH of 2026 27
BM Division - 600 MW - Unit II - Renewal of eroded and damaged guide vane and duct support tie rods at APH-A B pass flue gas inlet duct 37 mtr elevation and damaged scanner air pipe line 23 mtr elevation during AOH period of 2026-27
NCTPS II MI Circle BM -600MW UnitII Boiler Rectification of defective tubes in interpass area and second pass area of RH rear, Extended side Water wall, LTSH, ECO, back pass screen tubes, etc., during AOH of 2026-27
MTPS I TM UNIT III Complete Overhauling of HP Bypass and LP Bypass Spray Valves and Oil Supply Unit during AOH 2026 2027
BM Division - Unit II 600MW Boiler - Providing cup lock metallic scaffolding arrangements inside the Boiler furnace from 11 Mtr S-panel area) to 54 Mtr EL (Elephant door - 9th floor level and Cleaning of Boiler I pass heating surface tubes
BM Division Unit-II Boiler Annual Overhauling of Water Wall Soot Blowers and Long retractable soot blower during 2026-27
NCTPSII MI Circle BM UnitII 600 MW Overhauling of Coal oil burner assemblies and burner tilting mechanism in corner2 during the year
BM 600MW Unit II Boiler Rectification of defective steam supply line tubes and its drain line tubes of Water Wall Soot Blowers WWSB and Long Retractable Soot Blowers LRSB with new tube during AOH period of 2026-27
NCTPS II M I circle BM Division Unit II Removal and Relaying of Insulation in Boiler pressure parts, burner, valves, Pent house, Air preheater ducts during the AOH period
NCTPS II MI Circle BM UnitII 600 MW Overhauling of Coal oil burner assemblies and burner tilting mechanism in corner1 during the year 2026-27
BM Division - Unit II - 600MW Boiler - Supply and Installation of Air sealants in Dock house damaged area to avoid heavy hot ash leakage and air ingression into the Boiler during Annual overhaul 2026-27
NCTPS-II - M-I Circle CAD -NCTPS-II - M-I Circle - CAD - Dismantling of CWP motor, Inspection, Removal of coolers, cleaning of coolers, on-site balancing of fan blades, and checking of motor shaft float reassembling commissioning in CWPH during AOH
Providing New Borewell,New Motor With Accssories near Nursery at Varadarajapuram in Varadarajapuram Panchayat.
Providing the New Bore well with Motor accessories and New Pipe line at Perumalmalai adivaram in Sorathur Panchayat.
Providing the New Bore well with Motor accessories and New Pipe line at Perumalmalai adivaram in Kunnupatti Panchayat.
Providing Minipower pump at Arasakuttai Iyyanarappan koilnearinOmipper panchayat,Providing Minipower pump at Arasakuttai Iyyanarappan koilnearinOmipper panchayat
Providing New Bore well and New Motor Accessories for Manthoppu Paguthi in Omipper panchayat , Providing Main pipe line for Mariyamman koil street at Omipper panchayat
Tiruvannamalai City Municipal Corporation Supply and Fixing of Saftey Grill over the UGD Well at Gandhinagar Lifting Station in Tiruvannamalai City Municipal Corporation.
Appointment of consultant for Preparation of Detailed Project Report and Bid Documents for providing water supply for Kanyakumari Kundrathur and Tiruchendur Municipalities from PDGF under GoTN funding
Providing Stainless Steel Door arrangements and FRP Doors for New Building and Providing Polycarbonate Roof Sheet arrangements for New Building at PHC Anna Nesavalar Colony in ward No.1.
Motor servecing ,Replacement of pannel board and extension of EB cable to Kalainjer Nagar Pumping Station in Ward no 12 Zone 1
Dismantling and Re-construction of RCC Culverts at PN Road 2nd Cross Street in ward No.21.
Re-Construction of Existing Damaged Drain at M.N.S Nagar and Saran Theatre Road in ward No.27.
Boiler Maintenance Division Unit II Boiler Annual overhaul of Gates Dampers of Primary air, Secondary air and Flue gas ducts during 2026 -2027
Program External Post Procurement Review Auditor for Tamil Nadu Climate Resilient Urban Development Program (TNCRUDP)
Supply and Delivery of Girt pump at Manikandapuram Pumping Station in ward no 28
Supply and Delivery of Girt pump at thirumullaivoyal Colony Pumping Stationin ward no 9
Re-Construction of Existing Damaged Drain at Periya School Main Street and Cross Street in ward No.27.
NCTPS II MI Circle - BM Dn.- Unit-II - ESP A,B,C, D Passes Inspection of rectification of eroded,Punctured ESP EERM Floor casing plates and field internals in ESP during the Annual overhaul 2026-27
Construction of 5 Nos of Traffic Island in Ward no 7,8,25,32