Loading…
Loading…
5,227 results • Latest
Providing Security Guard and Sweeping and Cleaning Assistant at Directorate of Higher Education, Tripura and subordinate offices under Department of Higher Education, Tripura
Development of different roads required prior to durga puja during the year 2026-27/SH- Clearing Jungle, brick soling, earth filling, brick bats bamboo palasiding, patch repairing, surface drain, placing of gunny bag etc. Gr-II
Renovation of overhead steel tank and RCC tank at Kankaria Tilla Kunjaban township area under DWS Sub Division III Kunjaban Agartala
CONSTRUCTION OF PASSENGER WAITING SHED AT JEEP TAXI STAND , UNDER WARD NUMBER 15, KMC KHOWAI, DURING THE YEAR 2026 27
Const. of RCC foot bridge Near the house of Bidhan Debnath at shibnagar G.P under Nalchar R.D Block (PWD SoR 2023).
Excavation of Earth by Mechanical device, Supply and filling of earth with compaction by mechanical device at different area under the jurisdiction of RD Jirania Division
Development of roads from Ashwini market to Kashinagar Road via Ward No_1 under I_C Nagar GP via Dilu Roy house (Khamarhati road) (L_1point30 km)_Project Code No_P_373 (III)
Construction of RCC Box culvert (Double cell) near the land of Naradmani Noatia at Uttar Taibandal VC under Mohanbhog R.D Block.(PWD SoR 2023).(3rd call)
SH_Soling, WBM_3, carpeting seal coat with other allied works
Shifting of Electrical Utility for newly proposed PMGSY - III Scheme from (i) Chowmuhani Bazar to Juricherra(5.4Km), (ii) MDF Road at Kanchanbari to Demdum(5.8Km) , (iii) Jagannathpur to Telia Via Jagannathpur H.S. School(6.59Km) under ED - Kumar
Development of road from Kamalasagar Main Road at Madhupur Bazar to Shiv Mandir inside of Madhupur Bazar (L_0point10 Km)_SH_Patch soling, RCC drain, protection wall and paver block and other allied works
Carriage of PDS commodities from State Food Godown to FPShops (Door-Step-Delivery)for the period from August 2026 to March 2028
Road development work for different roads within the jurisdiction of 18_Surjamaninagar A/C under Dukli Sub_Division, PWD (RnB)_SH_Patch WBM, grouting, Carpeting and other allied works (Project Code_P_365)
Shifting and Reconstruction of pump house, installation of pump motor and other allied works
Development of road from NH08 (Gakulnagar) to Rabindranath Thakur College, Bishalgarh (L_0point62 Km)_SH_Patch WBM, patch soling, pot holes repair, carpeting, paver block and other allied works (Project Code_P_369)
Construction of RCC Box culvert (Single cell) near Sankar Deb house at Mohanbhog G.P under Mohanbhog R.D Block. (PWD SoR 2023)(2nd call)
Strengthening Improvement of riding quality for Old Alignment of NH208A at Gokul Nagar to Damdum via Joyganti under CRIF Scheme Length 210 Km
e-Tender for Annual Maintenance Contract (AMC) for Desktop Computer, Mono Laser Printer, Multifunction Printer, High Speed Scanner, U.P.S, Laptop, Colour Printer and Internet Connectivity of Directorate of Health Services, Govt. of Tripura, Agartala
Periodical repairs of road from Bypass to Sandhi Sangha via Kathaltali and Ranirkhar market under Dukli Sub_Division, PWD (RnB) during the year 2026_27_SH_Grouting, Patch Re_carpeting and other allied works
Construction of boundary wall with Gate at Abhoynagar TK under West Tripura District
FDR work of various roads under PWD RandB PadmabilSubdivision under Padmabil R. D. Block 24 Ramchandraghat constituency during the year FY 2026 27 SH Stripping of execss soil surface drains excavation in cutting brick soling single bamboo palasi
Improvement of Road from Champahour P.H.C to Champahour Idankur P.W.D road via Bharat Sardar Para under Tulashikhar R.D Block during the year 2025 26 Length 1.265 KM. SH GSB, WBM 2and3, PMC, Seal Coat, CD, Protection Work etc
Pacca drain construction
Improvement of road from Paschim Rajnagar High School To Utlabari Old NEC road under Tulasikhar RD Block L 2.65 km SH GSB, WBM II,WBM III, Drainage and Protection work. Group II From Ch.1.325 to Ch.2.65 km.
Const. of RCC foot bridge over Longtharai Cherra River at North Longtharai VC of Chawmanu RD Block under RD Manu Div.
Special repair renovation and periodical maintenance of E I at the State Guest House Capital Complex Agartala for the year 2026_27
Providing IE Work in the existing Post Operative Ward of Obstetrics Gynaecology Department for remodeling into a 20 bedded Obstetrics Gynaecology ICU at AGMC GBP Hospital
Constn. of RCC foot bridge on the connecting road from North Longtharai VC to Krishnarai RP over Majracherra Cherra N/LongtharaiVC of Chawmanu RD Block under RD Manu Div.
Transportation of PDS commodities from FCI / State depots (dispatching points) to different State Food Godowns and vice-versa for the period from September, 2026 to April, 2028.
Construction of RCC foot bridge at Arjunmani Karbari Para over Makarcherra River under Makarcherra VC of Chawmanu RD Block under RD Manu Division
Construction of CC Road at Tulashikhar Bazar-Purba Rajnagar PWD Road to Janardhan Para under Tulashikhar RD Block as per PWD SoR-2023 L-1500Mtr.
Construction of RCC Foot Bridge from Rabicharan Chow Para to Sumanta Para over Simulcherra at Rajnagar VC under Tulashikhar RD Block as per PWD SoR-2023
Construction of 2(Two) units Additional Classroom at Tapsa Para SB School, Amarpur Block, Gomati District for the year 2025-26 under Samagra Shiksha at Elementary Level
Construction of 2(Two) units Additional Classroom at Duarikanai English Med. JB School, Ampinagar Block, Gomati District for the year 2025-26 under Samagra Shiksha at Elementary Level
Construction of RCC Foot Bridge from Rabicharan Chow Para to Sumanta Para over Simulcherra at Rajnagar VC under Tulashikhar RD Block as per PWD SoR-2023
Providing Permanent Internal Electrification for newly constructed Single Storied Prisoner Women cell at Khowai Sub-Jail as per PWD SoR-I/Elect-2021
Construction of RCC Foot Bridge over Khowai river at Uttar Chebri GP under RD Khowai Division during the FY 2026-27 as per PWD SoR-2023
SH WBM 3, Carpeting, Seal Coat etc portion from Ch 2.000km to Ch 3.000km.
Development of Road from KCPJalabassa Road to Dharmatilla from CH.0.00KM to CH.0.60 KM Total Length0.60 KM under Damcherra Sub Division, PWD R and B during the year 2026 2027 SH Toe wall WBM III, Grouting, Carpeting, Seal coating, Pucca Drain, Surfac
Development of road from Netajinagar to Ahalyapur at Ch 1.00 Km to Ch 2.00 Km, under Jampui Hill Sub Division, PWD R and B during the F.Y. 2026 27 SH WBM,Tack coat, re carpeting, seal coating, Pucca and Kacha drain etc.
Development of Satnala Bazar internal road Group-II under Dasda Sub Division (RnB) during the financial year 2026 27 SH GSB , Paver Block etc.
SH WBM 3, Carpeting, Seal Coat etc portion from Ch 2.00km to Ch 3.00km.
SH WBM 3, Carpeting, Seal Coat etc portion from Ch 0.00km to Ch 1.00km.
SH WBM 3, Carpeting, Seal Coat etc portion from Ch 1.00km to Ch 2.00km.
Development of road from Netajinagar to Ahalyapur at Ch 0.00 Km to Ch 1.00 Km, under Jampui Hill Sub Division, PWD R and B during the F.Y. 2026 27 SH WBM,Tack coat, re carpeting, seal coating, Pucca and Kacha drain etc.
Development of road from Joyshree to Dhananjoy Para at Ch 2.40 Km to Ch 3.56 Km, under Jampui Hill Sub Division, PWD R and B during the F.Y. 2026 27 SH WBM,Tack coat, re carpeting, seal coating, Pucca and Kacha drain etc.
Development of Road from Thumsarai Hmunpui Road to Natun Para from CH.0.00 KM to CH.1.10 KM Total Length 1.10 KM under Damcherra Sub Division, PWD R and B during the year 2026 2027 SH WBM III, Grouting, Carpeting, Seal coating, Surface Drain, Pucca d
Development of infrastructure facilities of Rural Market at Sindukpathar, Damdama and Vivekananda Pally under Satchand Agri Sub Division, South Tripura SH Providing Internal Electrification thereof
Mtc. Of road Sailut to Bamboo Bari under Kanchanpur Division PWD RnB during the F.Y. 2025-2026/SH-- Jungle Clearing Roadway Cutting Construction of Embankment etc.
Development of Anandabazar market road Group II under Dasda Sub Division (RnB) during the financial year 2026 27 SH GSB, Paver Block etc..