Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.2 LAccepted-AOC NEW JAIL ROAD SABROOM SOUTH TRIPURA | L1 | Accepted-AOC Successful L1 Bidder. | |
| 2 | L2₹14.3 L+₹14,790 (1.04%)Rejected-Finance ARYA COLONY BELONIA DIST SOUTH TRIPURA | SOUTH TRIPURA | TRIPURA | 799125 | L2 | Rejected-Finance L2 | |
| 3 | L3₹14.8 L+₹59,415 (4.19%)Rejected-Finance GIRIDHARI PALLI PO R K PUR GOMATI DISTRICT TRIPURA | UDAIPUR | GOMATI | TRIPURA | L3 | Rejected-Finance L3 | |
| 4 | L4₹15.0 L+₹87,975 (6.21%)Rejected-Finance TOWN SANKAR PALLI PO AMARPUR P S BIRGANJ GOMATI TRIPURA | AMARPUR | GOMATI | TRIPURA | L4 | Rejected-Finance L4 | |
| 5 | L5₹15.6 L+₹1.4 L (9.81%)Rejected-Finance CANARA BANK RAJARBAG UMC UDAIPUR GOMATI TRIPURA PIN 799120 | GOMATI | TRIPURA | 799120 | L5 | Rejected-Finance L5 |
Tender Value
₹25.5 L
EMD Value
₹51,000
Closing Date
12 Oct 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE, Engg. cell, DSE, Agt.
EE, Engg. cell, DSE, Agt.
Renovation and Repair of 17 Nos Toilet Blocks in 17 different Schools under Rupaichari RD Block, Sabroom, South Tripura for the year 2025-26 under Samagra Shiksha Abhiyan Scheme (Phase- i).
2026_DDSE_77511_2
42/SE/ENGG.CELL/DSE/2026-27
Open Tender
Civil Works
Percentage
90 days
Sabroom
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
₹51,000
16 Nov 2026
5 Oct 2026
13 Oct 2026
5 Oct 2026
12 Oct 2026
5 Oct 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually / by
mechanical means including disposal of material
with all lifts and upto 50 m lead etc. complete as per direction of the Engineer- in-charge:- Nominal concrete 1:3:6 or richer mix (i/c equivalent
design mix) | 4.97 | cum | 1,436 | ₹7,141.23 |
| 2 | Dismantling GS sheet roofing including ridges, hips, valleys, gutters wind ties etc. including dismembering and stacking of serviceable materials and unserviceable materials separately with all lifts and upto a lead of 50m etc. complete as per direction of the Engineer- in-charge. | 119 | Sqm | 92.8 | ₹11,043.2 |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. - All kinds of soil | 186.2 | cum | 231.6 | ₹43,124.15 |
| 4 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. -All kinds of soil | 124.13 | cum | 161.3 | ₹20,022.81 |
| 5 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. | 41.65 | cum | 1,177.3 | ₹49,028.66 |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering --1:3:6 (1 Cement : 3 fine sand : 6 graded well burn tbrick aggregate 20 mm nominal size) | 16.86 | cum | 9,938.6 | ₹1,67,554.86 |
| 7 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement- -All work upto plinth level: 1:2:4 ( 1 Cement: 2 fine sand : 4 graded well burnt brick aggregate 20 mm nominal size) | 7.65 | cum | 11,080.4 | ₹84,765.06 |
| 8 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five levelexcluding the cost of centring, shuttering, finishing and reinforcement-1:2:4 ( 1 Cement: 2 fine sand : 4 graded well burnt brick aggregate 20 mm nominal size) | 16.15 | cum | 12,591.1 | ₹2,03,346.26 |
| 9 | Providing corrugated G.S. sheet roofing including
vertical/curved surface fixed with polymer coated J
or L hooks, bolts and nuts 8 mm diameter with
bitumen and G.I. limpet washers or with G.I. limpet
washers filled with white lead and including a coat
of approved steel primer and two coats of approved paint on overlapping of sheets complete (up to any pitch in horizontal/ vertical or curved surfaces) excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required etc. complete as per direction of Engineer-in-charge. 0.63mm thick with zinc coating not less than 275gm/m2 | 68 | Sqm | 1,205.4 | ₹81,967.2 |
| 10 | Providing wood work in frames of false ceiling,
partitions etc. sawn and put up in position : Local Teak Wood | 0.85 | Cum | 98,813.4 | ₹83,991.39 |
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_78898.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.36 MB
DNIeT.pdf
Tender Documents • 4.48 MB
BOQ_78898.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .