Loading…
Loading…
19,666 results • Latest
T07-Chowbata to Shirbedia
Engagement of Security Guards without arm for guarding arrangement round the clock at RWS, Burdwan Sub-Division office complex
PUCCA DRAIN WITH COVER FROM SAMIR MAJI HOUSE TO SUSAMA DAS HOUSE SAN13
CONSTRUCTION OF CONCRETE ROAD AT BAGGORIA FROM SHYAM KSHETRAPAL TOWARDS MOSTAFA MOLLA HOUSE.
CONSTRUCTION OF COVER DRAIN FROM JOGERPUKUR TO KAMARKURI AT ERUAR,FUND OF (15TH CFC)
Emergent Repairing of potholes of Dinhata-Gossanimari Road From 11.50 km to 13.20 km under Dinhata Sub-Division, P.W.D. under Coochbehar Division, P.W.D. in the District of Coochbehar during 2026-27.
Engagement of Security Guards without arm for guarding arrangement round the clock for the office of the Assistant Engineer, Burdwan Sub-Division, PHE. Dte.
Providing Security Services and Guarding for Dhakeswari Cotton Mill Premises site Asansol in the district of Paschim Bardhaman
Repair of Road from Kamalpur to Claret School under GP Gopgantar-II within Memari-I Block
Repair and Maintenance of PCC Pavement at Neharipara, Manikpally in Ward No-2, 11 within Tarakeswar Municipality
Operation and Guarding of Pumping machinery and others at Rampurhat Medical College PWSS HL and LL of Rampurhat - I Block
Guarding arrangement for the Divisional Store campus at Borsul under Burdwan Division, PHE. Dte.
CONSTRUCTION OF COVER DRAIN FROM SHANKHALAL SOREN HOUSE TO BEJA HANSDA HOUSE AT DEBPUR, FUND OF (15TH CFC)
Operation and maintenance of Pump Motor Sets of different Govt. Buildings under the jurisdiction of Burdwan Division, PWD for 1 year. Annual operation and maintenance of Pump Sets at different places (Sl.No.-05 of the NIeB)
SITC of 2 Nos. Stand alone Solar PV Minimast with 9 Meter GI Mini Mast with 80W X 4 nos. LED Luminaries, 6X 120-150 Wp Mono PERC PV module,4 X 54 Ah 12.8 V LITHIUM FERROPHOSPHATE (LiFePO4) battery at Kechanda in the district of Jhargram
Emergent Repairing of potholes of Trimohini VR From 2.50 km to 4.00 km under Dinhata Sub-Division, P.W.D. under Coochbehar Division, P.W.D. in the District of Coochbehar during 2026-27.
Guarding arrangement for the Bunglow campus at Borsul under Burdwan Division, PHE. Dte
Construction of Pce road from h/o Rabi Oraon to H/o Raju Munda (120 mtr) UNDER BANARHAT-I GP WITHIN BANARHAT DEVELOPMENT BLOCK UNDER APAS. (SCHEME ID-APAS/01/015/21/0004)
Guarding arrangement for the office of the Executive Engineer, Burdwan Division, PHE. Dte.
Urgent Repair of Road From Refugee Colony to Ghoshpara with Both side Approach Road at Gosaitala Culvert within Durgapur-Faridpur Block in the District of Paschim Bardhaman , Length 2.850KM
Renovation to the Earmarked Residential Quarters Of Executive Engineer PWD Bankura Division at Kenduadihi Under PWD Bankura Division in the district of Bankura during the year of 2026-2027
Installation of AC Machine at the Medical Officer Room of Gynea OPD of Durgapur SDH.
Restoration of road damaged by various utility services at Dum Dum-Lauhati Road (from 6.500 Kmp to 8.500kmp) under Barasat Highway Division No.- I, In the dist. Of North 24 Parganas.
Supply of 1 No Good condition Motor Cab (popularly known as Luxury taxi) with commercial permit with driver on per day hire as and when necessary and purely on temporary basis for official duty of the SE, NHC, PWRD, Malda for the use of the TA to SE.
Guarding arrangement for the office of the Superintending Engineer
Repairing and restoration of flank portion area with allied works of Sukna Adalpur road from chainage 0.00 km to 1.50 km and 1.60 km to 1.80 km under North Bengal Construction Division, PWD, Siliguri in the district of Darjeeling.
Emergent Rain Damage Repairing of potholes and patch Repairing of Chopra Udrail Road from 1.00 km to 2.00 km and 3.00 km to 5.85 km in Stretches under Uttar Dinajpur Highway Division in the district of Uttar Dinajpur
Operation and Guarding of Pumping machinery and others at Narayanpur WSS HL and LL of Rampurhat - I Block
Operation and maintenance of Pump Motor Sets of different Govt. Buildings under the jurisdiction of Burdwan Division, PWD for 1 year. Annual operation and maintenance of Pump Sets at different places (Sl.No.-04 of the NIeB)
Repair and Maintenance of PCC Pavement at Mandirpara, Raildhar, Sankharipara in Ward No-4,9,14 within Tarakeswar Municipality
MR to canal Sub-Mr-3 Ch.0.00 to 22.00of Mr-3 of Dy-8 of R.B.M.C under K.C. Sub- Division No.- VIII within K.C. Division No.- II Khatra Bankura during Khariff and Rabi Irrigation 2026-27.
Preparation of Detailed Project Report (DPR) and PPT and other necessary field work for the work of Gour-Mahadipur Road (MDR)-Chainage from 1.50 KM to 11.50 KM and 13.00 KM to 14.50 KM-Strengthening and Surfacing work under Malda Division, PWD
Operation and guarding of the electric operated auto /manual controlled pumping machinery at Baruli and Beniabow W/S Scheme of Sonarpur Block under South 24 Pgs Mechanical Division PHE Dte.
Supply of Materials for VB-G RAM G at Plungdung G.P.
Emergent repairing of potholes of Solpara Rasakhowal Road from 7.00 kmp to 11.00 kmp in Stretches under Uttar Dinajpur Highway Division in the district of Uttar Dinajpur
Emergent patch repairing Work of damage portion occurred due to heavy rain of Kharubhaj-Khochabari Bridge Road from 3.120km to 3.188 km under Cooch Behar Division P.W.D during the Year 2026-27.
Emergent Patch Repairing work of Bishnupur Beliaghata Road, from chainage 4.00 km to 5.00 km under Barasat Bridge Sub Divison of Barasat Highway Division I in the district of North 24 Parganas.
CONSTRUCTION OF CC ROAD FROM DIPAK ORAON HOUSE TO SHOP OF PRADIP UNDER BINNAGURI GP WITHIN BANARHAT DEVELOPMENT BLOCK UNDER APAS. (SCHEME ID-APAS/01/014/184/0002)
Urgent Repair of Road From Bordang to Chotkar within Baraboni Block in the District of Paschim Bardhaman, Length 1.375KM
MR to canal DY-6 Ch.65.00 to Ch.80.00 Ch.153.00 to Ch.155.00 and Ch.165.00 to Ch.175.00 of R.B.M.C under K.C. Sub- Division No.- VIII within K.C. Division No.- II Khatra Bankura during Khariff and Rabi Irrigation 2026-27.
Supply of 1 No Good condition Maxi Cab with commercial permit with driver on per day hire as and when necessary and purely on temporary basis for official duty of the office of the Chief Engineer-II, North Zone, P.W. (Roads) Dte, Singatala, Malda
Repair and Maintenance of Bituminous Pavement of Municipal Bus Terminous -I in ward no.-14 within Tarakeswar Municipality
Supply of Materials for VB-G RAM G at Pokhriabong-II G.P.
CONSTRACTION STTING UP SHG RUN CANTIN IN DASPUR-I BLOCK PREMISES BESIDE BANGLA SAHAYATA KENDRA WITH IN DASPUR-I PS
Urgent Restoration of Road surface and Main Drain connection below VIP Road station South side of K.N.I. Avenue (V.I.P. Road) under Baguihati Highway Sub Division under Barasat Highway Division No. - I in the District of North 24 Parganas
Engagement of Security , House Keeping and Caregiving Agency
Mending damages of potholes formed due to excessive rainfall on different locations of CDP Road chainage from 0.00Kmp (Old settlement more) to 1.00Kmp (Jhargram Stadium) under Jhargram Division, PWD in the district of Jhargram.
Repairing of potholes due to monsoon of Eastern Bypass Road from 0.00 km to 3.50 km and 8.30 km to 10.28 km in stretches with allied works under North Bengal Construction Division, PWD, Siliguri in the district of Jalpaiguri
Supply of Materials for VBG RAM G at Rangbhang Gopaldhara G.P
Supply of ready to use potholes repair material for all weather resilience for rapid maintenance using steel slag road Technology for sustainable road maintenance approved by CSIR-CRRI, New Delhi under Malda Division, PWD, Malda.