Loading…
Loading…
1,31,186 results • Latest
CIVIL WORK- a) Extension of Pipe line with Tank from Solar Pump to Udaynath Murmu house at Pandapata b) 3 Nos of Solar light at Pindrageria shop Chawk and Kadamtal c) Const of New Toilet at Primary Primary School
MAINTENANCE OF F.W. SUPPLY BY REPAIRING OF DAMAGED, OBSTRUCTED 100 MM. AND 150 MM. DIA. F.W. S/MAINS ALONG WITH OTHER ANCILLARY WORKS NEAR 22/18 C.N. ROY RD, 3/15 SAPGACHI 2ND LN, 135D/1 P.G. RD. ETC. AND ITS SURROUNDING AREAS IN WD. NO. 66.
Installation of SOLAR LIGHT INFRONT OF AMIT ROY HOUSE AT DHARENDA DAG-436 UNDER BAIDYAPUR GP
Connection (FHTC) In Connection With Jal Jeevan Mission at The Village Of Kasba Bahadurpur (Code-314488) In The Command Area Of Kasba Bahadurpur Ground Water Supply Scheme (Part-B)
KASMUDDIN HOUSE TO AKBAR ALI HOUSE PEVER BLOCK
Repairing of Community Toilet at Chhatapathar Video Hall, Ward no-39, Booth no-204, Borough VI, Under AMC
Repair of AWC at Serpur AWC (19345060615) of Kusumpur GP under Contai III Dev Block
Installation of SOLAR LIGHT BESIDE LUBIN MURMU HOUSE AT BELDANGA DAG-157 UNDER BAIDYAPUR GP
a) Const of CC road Pitch road to Solar Submersible at Pindrageria Kadamtala b) Repair of Pandapata primary School Kitchen room and Toilet c) Repair of Pandapata ICDS d) SWM PWM work and Maintenance at Pindrageria booth area
Construction of CC road from Nirmal Nagar colony Samir dey house to Rabi Das house at Matigara II GP Matigara Block.
RESTORATION OF 900 MM DIA F.W.R/ MAINS NEAR 8, EKDALIA ROAD UNDER WATER SUPPLY DEPTT(WEST).
Repair of AWC at Kancheswar AWC (19345060309) of Kumirda GP under Contai III Dev Block
Supply Installation of required Spare Parts, repairing, Service, AMC for One Year, Testing, Legal Metrology Stamping, Adjusting and Calibration of Fully Electronic Weigh Bridge of capacity 60 MT at Maynaguri, Dhupguri, Matiali, Nagrakat Mal, etc
Installation of SOLAR LIGHT BESIDE HABIL HANSDA HOUSE AT BELDANGA DAG-86 UNDER BAIDYAPUR GP
Repair of AWC at Rania Dakshin SC Para AWC (19345060314) of Kumirda GP under Contai III Dev Block
a) Extension of Pipe line from Pandit Murmu to Sahebram Murmu house with Tank at Pindrageria b) Extension of Pipe line from Pirulal Hansda house to Mangal Murmu house with Tank at Pindrageria Paschim Para c) Repair of Chhoto Tarki ICDS
Installation of SOLAR LIGHT AT KALIPUKUR HAT KHOLA DAG-648 UNDER BAIDYAPUR GP
CONSTRUCTION OF CC ROAD FROM MAJIRUDDIN HOUSE TO MD AFUR HOUSE
SOLAR LIGHT
Allied Work In Connection With Providing Functional House Hold Tap Connection For Bagduar PWSS Under Jal Swapna Programme at Banshihari Block in the District of Dakshin Dinajpur under Balurghat Division P.H.Engineering Dte.
Repair of AWC at Panichiary Dakshin AWC (19345060304) of Kumirda GP under Contai III Dev Block
ROAD REPAIRING AT KUNDU PUKUR PASCHIM PAR FROM SK FIROZ HOUSE TO MUNNA GHOSH HOUSE(APAS/01/260/148/0002)
Installation of SOLAR LIGHT BESIDE EAST DHARENDA BIREN ROY HOUSE DAG-787 UNDER BAIDYAPUR GP
Construction of CC road from Rabindrapally Sani Mandir to Raju Bhagat house at Matigara ii GP Matigara Block.
ROAD REPAIRING AT SARBAMANGALA PARA FROM AVISHEK MARRIGE HALL TO GITA CHATTERJEE HOUSE APAS/01/260/148/0001
Installation of SOLAR LIGHT AT DAKSHIN DHARENDA MAJHI THAN DAG-03 UNDER BAIDYAPUR GP
Installation of SOLAR LIGHT AT UTTAR DHARENDA RADHA GOBINDA MANDIR DAG-627 UNDER BAIDYAPUR GP
INSTALLATION OF 40 NOs LEDSTREET LIGHT AT RAMMUDIPARA FROM BIMAL MISTRIHOUSE TO SIRISHTALA(APAS/01/260/282/0010) SUPPLY INSTALLATION,FITTINGS
Installation of SOLAR LIGHT INFRONT OF DHARENDA ROBEAT MURMU HOUSE DAG-338,UNDER BAIDYAPUR GP
INSTALLATION OF 40 NOs LEDSTREET LIGHT AT RAMMUDIPARA FROM SHAMBUHALDER HOUSE TO RAMMUDISMRITISANGHA(APAS/01/260/282/0009)
SUPPLY AND DELIVERY OF LED STREET LIGHT FITTINGS FOR MAINTENANCE OF STREET LIGHTING SYSTEM IN WD-28 UNDER BR-IV.
Installation of SOLAR LIGHT AT DHARENDA GAMBHIRA MANDIR DAG-509, JL-74 UNDER BAIDYAPUR GP
INSTALLATION OF 40 NOs LEDSTREET LIGHT AT RAMMUDIPARA FROM BARO THAKURMANDIR TO ANIL DASHOUSE(APAS/01/260/282/0008)
Repair of AWC at Dakshin Kancheswar AWC (19345060305) of Kumirda GP under Contai III Dev Block
Installation of SOLAR LIGHT AT PASCHIM PARA SISHU SANGHA CLUB DAG-352, JL-74 UNDER BAIDYAPUR GP
INSTALLATION OF 30 NOs LEDSTREET LIGHT AT RAMMUDIPARA FROM DVC BANDH TON.HROAD(APAS/01/260/282/0007)
SUPPLY AND DELIVERY OF LED STREET LIGHT FITTINGS FOR MAINTENANCE OF STREET LIGHTING SYSTEM IN WD-38 UNDER BR-IV.
Installation of SOLAR LIGHT AT PASCHIM PARA RADHA GOBINDA MANDIR DAG-444,JL-74 UNDER BAIDYAPUR GP
Relaying of pipeline due to Road widening and consrtuction of drain by NH authority for NUNAIL PWSS Under Jal Swapna Programme at Balurghat Block in the District of Dakshin Dinajpur under Balurghat Division P.H.Engineering Dte.
ANNUAL COMPREHENSIVE MAINTENANCE OF 02 NOS ELEVATORS WITH AUTO DOOR (GPLUS3) AT BOROUGH XV OFFICE COMPLEX, GRU
INSTALLATION OF LEDSTREET LIGHT FROMKAMALAKANTA KALIBARITO GANGULY PARABISWAJIT DHARHOUSE(APAS/01/260/88/0012)
Repair of AWC at Kumirda B.R Ambedkar AWC (19345060229) of Kumirda GP under Contai III Dev Block
Installation of Solar light beside Mungli Mandal House dag-534 under Baidyapur GP
Repairing with the following items of Vehicle Reg. no. WB 37B 4037 (Dumper Placer) under Borough no. V, Asansol Municipal Corporation.
INSTALLATION OF LEDSTREET LIGHT FROM C.D.SBUILDING TO MUNNAKHANDWALALHOUSE(APAS/01/260/88/0011)
Repair of AWC at Kumirda DK AWC (19345060228) of Kumirda GP under Contai III Dev Block
Installation of Solar light beside of Sadek Sarkar House dag-709 under Baidyapur GP
Repairing with the following items of Vehicle Reg. no. WB 37D 4025 (Six Wheeler Auto Tipper) under Borough no. V, Asansol Municipal Corporation.
Repair of AWC at Harigechhia AWC (19345060225) of Kumirda GP under Contai III Dev Block
Installation of Solar light beside of nipen mandal House dag-710 under Baidyapur GP