Loading…
Loading…
79,880 results • Latest
Construction of School room in Kataraki village of Badami taluk.
Construction of bridge at ch166.30km on kumuta kadamadagi state highway road (sh 48) in honnali taluk Davanagere district
Maintenance of Dodderi - Obenahalli Road via Reddihalli, Gopanahalli, Chikkenahalli, Yalagatta, Konigarahalli, Gosikere Kaval, Gosikere, Chikkachelluru from km 1.20 to 1.60, Km 1.90 to 2.60, Km 3.28 to 16.865, Km 16.95 to 16.975 and Km 17.045 to 36.13 in Chalakere taluk
Proposed Construction of Central Meat Market at Chitradurga City
A) Maintenance of Hirehalli to Gundluru Road via Rudramanahalli, Obannahalli, Kondlahalli, Netranahalli (SH 218) from Km 0.00 to 8.57 in Challakere taluk, B)Maintenance of Banavinakallu to Kallahalli Road (SH-226) from Km 40.43 to 41.20 in Challakere Taluk. c)Maintenance of Malpe with Molakalmur via Udupi, Hebri, Agumbe, Begar, Koppa, Narasimharajapura, Sulageri, Bhadravathi, Chennagiri, Shanthisagar, Davanagere, Jagalur, Mustur and B.G.Kere (SH-65) from Km 265.83 to 279.77 in Challakere taluk
Supply of 100A portable 220V DC boost cum float charger suitable for 400AH and 150AH Plante type battery banks for LT/HT switchgears as per detailed technical specification including Engineer visiting charges for erection, testing and commissioning
Maintenance of Sanikere to Shiddlaiahnakote Road via Kaparahalli, Jadekunte, Hulikunte, Belagere, Narayanapura, Gorlathu, Kalamarahalli from km 0.00 to 3.60, Km 3.98 to 4.60 and Km 4.90 to 29.04 in Challakere taluk
Annual Maintenance of Holalkere(SH-47) to Hanumali Connecting Road via Avalihatti, Malenahalli, Nulenuru, Rangapura from Km 0.00 to 1.45, Km 5.00 to 6.09, Km 6.41 to 8.40, Km 8.50 to 8.60, km 9.03 to 9.29, Km 11.41 to 12.00 and km 13.00 to 15.11in Holalkere Taluk
Slope correction for the pavement in between JNT-06 and JNT-07 at BTPS.
Annual maintenance of Byalappanamatha Sashiwala road from Ch 0.00 km to 22.50 km in selected reaches in Chikkanayakanahalli Taluk for the year 2026-27(0.16 km. Overlap.)