Loading…
Loading…
4,346 results • Latest
1) Upgradation of KMI- Provision of ramps, New Booking office and renovation of existing booking office into waiting room and CI Office, Raising of PF 1& 2 upto 84cm. (This work primarily involves civil work associated with i) Construction of 2.20m wide ramp for PF no. 1 & 2(1:12) at KMI, near New Booking office KMI and towards Durg end.ii) Construction of Divyang parking near New Booking office KMI, iii)Construction of Electrical room of size 16x8m , iv) Conversion of existing booking office and concourse into waiting room with separate toilet facilities for male, female & divyangjan passengers and provision of camp office for sectional CI v) Construction of booking counter of size 16x8m with 16x8m concourse and divyang parking, vi) Raising of platform from medium level to high level platform at KMI station platform no.1 &2 (surfacing and raising work.)2) Replacement of existing old and damaged misting system at Platform no.1, 2 & 3 of Durg station.
Supply, Commissioning & testing of wheel set trolley (Towing Equipment) to RDSO TC No. ELRS /TC /0090 Rev 0 along with accessories,
Manufacture & supply of COMPOSITE GROOVED RUBBER SOLE PLATE(CGRSP) FOR 60 KG. UIC RAIL WITH 6.2 MM THICKNESS DRG: RDSO/T-6618
Set of Cable Boggie Cleat of Hitachi motor 15250A with fasteners.
Electrical(G) portion of work for:-(1) Construction of RUB at Km. 725/25-27 in lieu of LC No. 369 between BSP-DPH section in Howrah-Mumbai main line (2) Construction of RUB near LC no. 375(OTGAN) in between BYL-DGS section (Km. 739/3-5) on Howrah-Mumbai main line (3) Construction of RUB by box pushing method in lieu of LC no. 376 at Km. 741/26 between NPI-DGS section on NGP-HWH main line. (4) Provision of RUB in lieu of LC no.389 at Km.774/13-15 between BYT- HN station. (5) Construction of RUB on Km. 785/23-25 in lieu of LC No. 394(Khapari Gate) in between HN-TLD section in Howrah-Mumbai main line (6) Construction of RUB on Km. 807/7-9 in lieu of LC No. 406, between SLH-MDH section in Howrah- Mumbai main line (7) Construction of RUB at Km 874/2-3 in lieu of manned LC no. DD-8 between MXA-RSA section of Raipur Division. (8) Construction of RUB at Km 889/7-8 in lieu of manned level crossing no. DD-19 at RSA Yard of Raipur Division. (9) Construction of RUB at Km 947/1-2 in lieu of manned LC no. DD-59 at KYS yard of raipur Division.
D/G EOT Crane upto 100T for 2X660 MW Super Critical TPP, HTPS, Korba West
SPHERIBLOC FOR WAG-9H specn: RDSO/2007/EL/SPEC/0051 (REV.4).
NON AUTHORIZATION MECHANICAL / ELECTRICAL MATERIAL
Supply, delivery and stacking of 1,00,000 Cum 50mm gauge machine crushed track ballast as per Railway's specification at Saragbundia (SRBA) depot from outside Railway land and loading into Railway wagons under the jurisdiction of ADEN/Champa of Bilaspur Division.
Underground Railway Signaling Cable unscreened PVC insulated, PVC inner sheathed,armoured and PVC outer jacket with high conductivity annealed copper conductor size 6 Core x 1.5 sq.mm confirming to Specification No. IRS-S-63/2014 [Rev.4.0] with latest amendments.
PROCUREMENT OF KSB MIL MAKE PNEUMATIC ACTUATOR and SPARES FOR NTPC VSTPS
Drilling of 22 nos NX size upward vertical borehole in proposed depillaring panel 16LS,10LS,-16R and -9R from seam C to seam A 18 nos and seam C to seam B Bottom 04 nos at Kurja UG Mine of Hasdeo Area for six month time period.
Washing Machine - Domestic Purpose (Q2) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years Of Experience Yes | Complete
Custom Bid for Services - Routine and miscellaneous Mechanical jobs in Converter mechanical group, lubrication of Converter Shop, SMS-2 Similar Category Operation And Maintenance Of Other Machines And Plants
Monthly Basis Cab & Taxi Hiring Services - MUV; 3000 Km x 364 hours; Outstation
M1149200858 FUEL: LIQUID: HIGH SPEED DIESEL, MISCELLANEOUS CHARGES
RF CALCIUM SILICATE BLO 0 5% THCK 25MM, RF CALCIUM SILICATE BLO 0 5% THCK 50MM
Customized AMC/CMC for Pre-owned Products - AMC; CCTV; Annual Maintenance Contract (AMC); Residential; Yes
Monthly Basis Cab & Taxi Hiring Services - MUV; 1400 Km x 364 hours; Outstation 24*7
Custom Bid for Services - BIENNIAL JOB CONTRACT FOR ASSISTANCE IN OPERATION AND HOUSE KEEPING OF ASH HANDLING SYSTEM, NSPCL BHILAI PP-3 Similar Category Operation and Maintenance Power House/Power Plant
Manpower Outsourcing Services - Minimum wage - Unskilled; Not Required; Others
Handling, Transport and Other Mining Services - Percentage quote based - Cleaning of spillage of coal, Malma below and both side of belt conveyor in Masan Combined Seam at Shiwani UG Mine Under Bhatgaon Area
Custom Bid for Services - CALIBRATION OF MULTIGAS DETECTOR Similar Category Repair and Overhauling Service Repair, Maintenance and Installation of Plant Systems/Equipments Calibration Services
Monthly Basis Cab and Taxi Hiring Service - Without Fuel - Premium SUV; AS PER
Seasoned Hard Wood Sleeper Size 1200 mm length 100mm width and 100 mm thickness for underground Cog
Portland - Pozzolana Cement (Fly Ash Based) for Bulk Buying as per IS 1489 (Part 1) (Q2) (3 (3 ))
Paper-based Printing Services - Printing without Material; Book/Booklet; Offset
Wooden Shelf/Case/Rack/Credenza/Modular Storage (V2) (Q2), Modular Table/Meeting Table/Centre Table (V2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Construction of a toilet building at Pre Matric ST Boys Hostel Aamadula under the DA-JGUA Block-Dondi Distt-Balod
Construction of a toilet building at Pre Matric ST Boys Hostel Banjari under the DA-JGUA Block-Dondilohara Distt-Balod
Construction of a toilet building at Pre Matric ST Boys Hostel Bhimkanhar under the DA-JGUA Block-Dondilohara Distt-Balod
Construction of a toilet building at Pre Matric ST Boys Hostel Gheena under the DA-JGUA Block-Dondilohara Distt-Balod
Construction of a toilet building at Adivasi Balak Ashram Badbhum under the DA-JGUA Block-Gurur Distt-Balod
Construction of a toilet building at Adivasi Balak Ashram Bagdai under the DA-JGUA Block-Gurur Distt-Balod
Construction of a toilet building at Adivasi Balak Ashram Hitapathar under the DA-JGUA Block-Dondilohara Distt-Balod
Construction of a toilet building at Pre Matric ST Boys Hostel Bharritola under the DA-JGUA Block-Dondi Distt-Balod
Construction of a toilet building at Pre Matric ST Boys Hostel Bhawarmara under the DA-JGUA Block-Dondilohara Distt-Balod
B.T. PATCH WORK OF SH, MDR & VILLAGE ROAD UNDER SUB DIVISION SARAIPALI
B.T. PATCH REPAIR ON VARIOUS S.H., M.D.R., O.D.R. AND VILLAGE ROADS UNDER P.W.D. (B/R) SUB DIVISION PITHORA
WMM & B.T. PATCH REPAIR WORK OF VARIOUS SH, MDR & VILLAGE ROAD UNDER SUB DN. NO. 2 MAHASAMUND (C.G.)
शहीद बिग्रेडियर उस्मान वार्ड 63 अंतर्गत साहू पारा टिकरापारा में आंगनबाड़ी केन्द्र निर्माण कार्य।
B.T. PATCH REPAIR OF M.D.R., O.D.R. & VILLAGE ROAD UNDER P.W.D. (B/R) SUB DIVISION NO.-1 MAHASAMUND
Construction of new settlement post at DRM office complex at Raipur. (This work primarily includes a G+1 Building of size 85 X 50 Feet)
Construction of New Loop Line at Risama at Raipur Division. (This work primarily involves Earthwork for formation, Laying of track approx 1300 Track mtrs and other associated works.)