Loading…
Loading…
5,022 results • Latest
PROCUREMENT OF SPARES FOR IL-78 AIRCRAFT
Consultancy for Development of Design of Civil Structures for Bharat High Speed Rail Programme for 350 Kmph Design Speed
8 Lane Dwarka Expressway from Shiv Murti to RUB Delhi (Chainage from Km 0.600 to Km 5.300) in the state of Delhi (Package I / NH 248BB) 2nd Call Works to be carried out at risk and cost of EPC Contractor
DEVELOPING, OPERATING AND MAINTAINING OF WAYSIDE AMENITIES IN ODISHA ON 6 LANE GREENFIELD RAIPUR -VISAKHAPATNAM ECONOMICS CORRIDOR (PACKAGE OD-1 -OD-3) ON LEASE BASIS (4 DBOT SITES)Raipur-Vizag/RV1/Pkg OD3/220PLUS420/LHS/OD
DEVELOPING, OPERATING AND MAINTAINING OF WAYSIDE AMENITIES IN ODISHA ON 6 LANE GREENFIELD RAIPUR -VISAKHAPATNAM ECONOMICS CORRIDOR (PACKAGE OD-1 - OD-3) ON LEASE BASIS (4 DBOT SITES)Raipur-Vizag/RV1/Pkg OD1/137plus550/LHS/OD
DEVELOPING, OPERATING AND MAINTAINING OF WAYSIDE AMENITIES IN ODISHA ON 6 LANE GREENFIELD RAIPUR -VISAKHAPATNAM ECONOMICS CORRIDOR (PACKAGE OD-1 -OD-3) ON LEASE BASIS (4 DBOT SITES)Raipur-Vizag/RV1/Pkg OD3/220PLUS420/RHS/OD
DEVELOPING, OPERATING AND MAINTAINING OF WAYSIDE AMENITIES IN ODISHA ON 6 LANE GREENFIELD RAIPUR -VISAKHAPATNAM ECONOMICS CORRIDOR (PACKAGE OD-1 - OD-3) ON LEASE BASIS (4 DBOT SITES)Raipur-Vizag/RV1/Pkg OD1/137PLUS550/RHS/OD
Development of a Link Connector Corridor connecting the NH-31 and Varanasi Ring Road along the River Varuna for Decongestion of Varanasi City PKG2 from Km11.744-km19.420 (TL 14.720Km including Loop Ramp) in the State of Uttar Pradesh on HAM
Design and Construction of seven elevated stations, Foot Over Bridge, Architectural , Finishing, Plumbing and Ground Restoration including Multi-Model Integration works etc. for Lajpat Nagar to Saket-G Block corridor of Delhi MRTS Phase-IV project.
SPECIAL REPAIR TO CERTAIN OFFICES SINGLE STOREY BLDG AND CERTAIN TOILETS AT AFCAO (CAMERO COMPLEX) UNDER GE (AF) SUBROTO PARK, DELHI CANTT-10