Loading…
Loading…
5,077 results • Latest
Dev of 4/6L of AC Kanpur Kabrai GF highway start 0.000 (Kanpur Ring road) to 117.700 near Kabrai Sec1 and Overlay/Strengthen other road safety and improvement works on exist Kanpur Kabrai sec from 7.430 to 130.100 of NH34 in UP Sec2 on DBFOT pattern
Portable Electric Indoor Air Purifier? (Q2) (3 (3 ))
Supply of 2000 MW Energy Storage Capacity (For 8 Hours discharge with maximum 5 Hours continuous discharge) from Pumped Storage Power Projects
Construction of new 4-lane Access Controlled Coastal Highway from Rameshwar to Konark (km.0 to km. 79.400) on Hybrid Annuity Mode in the State of Odisha (Package-I).
Construction of new 2-lane with paved shoulder coastal Highway from Konark to Paradeep (Km.79.400 to Km. 160.180) on Hybrid Annuity Mode in the state of Odisha (Package-II).
CS for IE for Const. of 4L EC including approaches from Old Pune Naka to Boramani Naka on NH65 in Solapur City on HAM in the State of Maharashtra
Independent Engineer Services for 4-lane Highway of Armoor-Jagtial-Mancherial Section of NH-63 from Armoor (design km.29.100) to Jagtial (design km.92.700) (total length 63.600 km) under NH(O) on Hybrid Annuity Mode in the state of Telangana
IE Services for 4Laning of Jagtial-Karimnagar Section of NH-563 from Jagtial Bypass Start at Design Ch.0.000 (Ex.chainage 90-500 on NH-63) to Design Ch.58.866 km (Ch.170.400 km) at Karimnagar Bypass End (58.866 km) to be executed on BOT mode NH O
Independent Engineer Services for 4-lane Highway of Armoor-Jagtial-Mancherial Section of NH-63 from Jagtial (design km.92.700) to Mancherial (design km.160.995) (total length 68.295 km) under NH(O) on Hybrid Annuity Mode in the state of Telangana
PROCUREMENT OF 200 MW FIRM & DISPATCHABLE RENEWABLE ENERGY (FDRE) WITH ENERGY STORAGE SYSTEM WITH GREENSHOE OPTION OF CONTRACTING ADDITIONAL 200 MW