Loading…
Loading…
4,052 results • Latest
Request for Proposal for Operation and Maintenance of Shree Sheetla Mata Devi 150 seats Medical College and 883 bedded Teaching Hospital at sector-102, Gurugram on PPP mode
JP/B862-000-YF-MR-2010/553 - SPECIAL FLOW INSTRUMENTS FOR PDH PP PLANT WITH ETHANE AND PROPANE HANDLING FACILITIES PROJECT AT DAHEJ, GUJARAT
Relining of various Rubber lined Chemical Storage / Measuring Tanks installed in Chemical Division at 2 x 600 MW, RGTPP, Khedar, Hisar.
Special estimate for augmentation of 132 kV S/Stn. Jakhal from 1x20/25MVA, 132/33kV plus (1x16/20 plus 1x10/16) MVA, 132/11kV T/Fs to 2x20/25MVA, 132/33kV plus (1x16/20 plus 1x10/16) MVA, 132/11kV T/Fs for the year 2025-26.
Special estimate for strengthening the 132kV Uklana by provision of 132KV bay control equipment at 132kV S/C Uklana-Dablain line bay at 132 kV substation Uklana for the year 2025-26
Special estimate to create 132kv bay for feeding additional 20/25mva 132kv T/F at 132kv S/Stn. Beer by HVPNL in Ist half of 2024-25
S/E for aug of 132 kV s/Stn Bhattu Kalan from 1x20/25 MVA, 132/33kV plus (1x10/16 plus 1x16/20) MVA, 132/11kV T/Fs To 2x20/25 MVA, 132/33kV plus (1x10/16 plus 1x16/20) MVA, 132/11kV TFs
Petroleum Hydrocarbon Solvent. Specification: - Low Aromatic Grade Solvent 145/205 to IS: 1745/2018 (Third Revision) (Reaffirmed 2023) with additional requirements of ICF/MD/Spec.-045, Issue Status-02, Rev.-03 dated 14.06.2007(with amend. 1 dt.22.04.2008) with RDSO amendment no. 1A (Rev. 1.0) as an additional requirement.
SG/B957-000-YC-MR-1340/184 SELF ACTUATED PRESSURE CONTROL VALVES FOR BINA PETCHEM AND REFINERY EXPANSION PROJECT (BPREP)