Loading…
Loading…
8,731 results • Latest
Construction of Compound Wall and Installation of Gates for Entrance and Exit Openings at Kota Sub Market Yard of APMC Udupi, Approved under 2025-26 Annual Action Plan.
Providing Manpower of various categories to work in the APMC Siddapur 2026-27
APRON FEEDER SPROCKET SEGMENT FOR APRON FEEDER
Procurement of Track Suit Set T Shirt and Lower for Dasara Sports CM cup-2026.
Maintenance for Road Furnitures 2026-27 in Channarayapatna Taluk. Turuvekere (NH-150A) to Lakya Crosss (NH-173) Conncting Road (SH-267)
Maintenance for Road Furnitures 2026-27 in Channarayapatna Taluk. Mandya-Hadagali Road (SH-47)
Maintenance for Road Furnitures 2026-27 in Channarayapatna Taluk. Hirisave-Chattahalli Road (SH-8)
Tender For Stall NO-03 General Store East Side Old Complex At Raichur Central Bus Stand
Combined package of 1. WORK A-Balance portion of Providing additional1x8MVA, 66/11 kV Transformer at 220/66/11 kV Muguluvalli substation inChikkamagaluru Taluk, Chikkamagaluru District- Work Code-CE1047 2.WORK B- Providing SAS Panel for 11kV bus coupler & SAS integration for11kV switchgear and other left out works of additional 8MVA, 66/11KVTransformer-2 at 220/66/11KV Muguluvalli Receiving station inChikkamagaluru Taluk, Chikkamagaluru District
Supply of Disabled Aids & Appliance For DDWO Kodagu District
Work involving the repainting and installation of zinc sheet roofing for 12 small shops at the Hosadurga main market complex.
Supply of Electric Scooter with Retrofitted DESIGNED FOR Persons with Disabilities to Kodagu District
AS PER RFQ DETAILS
Construction of cc road from channadasar tota ambedkar circle to sadashiv mata in Siddapur Village of Raibag Taluka Belagavi dist
Construction of cc road from Khemalapur main road to chinchali road in Khemalapur Village of Raibag Taluka Belagavi dist
Annual Maintenence of Srirangapattana to Sri Male Mahadeshwara Hills Road (SH-79) From Ch 59.59 to 85.60km in Kollegal Taluk For the year 2026-27
Construction of Compound wall around the Nayaka student Federation hostel in Gokak City of Gokak Taluka
Procurement of 250mm & 450mm butterfly valves for YTPS
construction of c c road from kallolli road to shri laxmidevi temple road at tukkanatti village in mudalagi taluka
Construction of building for community cultural activities near shree basaveshwar devasthaana at hallur village in mudalagi taluka
Comprehensive AMC, Preventive and Breakdown maintenance of 5 Ton to 30 Ton EOT Cranes provided for lifting of Motors Pumps,Fans of Unit-1to8-RTPS
Construction of Library Room at K.P.S Govt Kannada Higher Primary School Nilaji Tq Raibag Dist Belagavi
Construction of Workshop/Laboratory cum Classroom at Govt Kannada Higher Primary and Upgraded RMSA Secondary School Bastawad Tq Raibag Dist Belagavi
Repair work Weighbridge Ramp and Laying concrete at SWM Site Kendatti CMC Kolar.
RUBBER PAD FOR PRIMARY SUSPENTION FOR FIAT IR BOGIE TO DRG NO 1901097 VER.08R1 READ WITH T.S. 17.531 100 03, T.S.17 617 100 02, MDTS-148 REV."01"& MDTS-122 REV."03"
Shifting of High Mast Light & Construction of High Mast Platform Opposite to New KSRTC Bus Stand, Repair Work of High Mast Light in DCC Bank, Jayanagara 7th cross, Palsandra Layout 3rd Cross Park & Kuruburpete Nandhini Parlour in Kolar Cmc Limits.
Maintenance of 1st year plantation-COASTAL SHELTER BELT PLANTATION Thannirbhavi, Bengare Behind Karavali Police Station Mangalore Range-6.5 ha
Drilling of borwell in wno.1 Tamaka, Wno.26 Keelukote & Wn27 Karanjikatte CMC Kolar limit.
Maintenance of 1st year plantation (ANR) Annaru of Charmady vilalge Sy No 197 Charmady Kanapady RF Belthangady Range 15 ha
Maintenance of 1st year plantation NTFP Ajjibakimar of Kodyamale RF
Package No.3 Supply of Man power WNo.1 to 35 & Pump house for Water supply Operator (8 Nos), Assistant Water supply operator (8 Nos), Electrician (2 Nos) & Lab Technician (1 No) on outsource basis CMC Kolar
Maintenance of 1st year plantation ANR Nekkilar of Veerakamba RF
Maintenance of one year plantation ANR Kordanda of Belthangady vilalge Sy No 120 Belthangady RF
TENDER FOR PROVIDING OUTSOURCE SERVICES TO OFFICE
Advance work for Raising of Plantation (2027 rains) -ANR-Model-II (including raising PB seedlings) in Soppinnosalli F.Sy. No. 11, 15.00 Ha. Of Kumta Range during 2026-27
Tender For Stall NO-06 General Store East Side Old Complex At Raichur Central Bus Stand
Providing Mess to Narihalla 1st Year OBC & General Girls Hostel Students and Navali-2nd Year OBC & General Girls Hostel Students at Vijayanagara Sri Krishnadevaraya University, Jnana Sagara Campus, Ballari
FIRE RETARDANT UPHOLSTERY FOR LHB DESIGN AC CHAIR CAR SHATABDI COACH AND LHB DOUBLE DECKER COACH CONFIRMING TO RCF SPEC.NO-MDTS-44386-REV- NIL ISSUED BY RCF dt 20-02-2023 OR latest TO COMPLYING-EN 45545-2 or latest specification FIRE CHARACTERISTICS, COLOUR AND PATTERN SHOULD MATCH WITH AUNDE JACQUARD MOQUETTE AMPURIAS QUALITY AND CIRCUTTE VERDE OF M/S AUNDE SPAIN. NOTE- SAMPLE TO BE APPROVED BY CONSIGNEE AGAINST COLOUR SHADE AND PATTERN REF.ONLY BEFORE BULK SUPPLY.
PROCUREMENT OF DESKTOP COMPUTERS
Providing Mess to Hagari( 1st Year SC-ST Boys) Hostel Students , Bhadra (2nd Year SC-ST Boys) Hostel Students, Vedavati (1st Year SC-ST Girls) Hostel Students and Tunga (2nd Year SC-ST Girls) Hostel Students at Vijayanagara Sri Krishnadevaraya University, Jnana Sagara Campus, Ballari
Package No.2 Supply of Man power WNo.19 to 35 & Pump house for Water supply Valvemen (18 Nos) on outsource basis CMC Kolar
Advance work for Raising of Plantation (2027 rains) -ANR-Model-II (including raising PB seedlings) inSandalli Mattalli F.Sy. No. 17, 43,25 Ha. Of Katgal Range during 2026-27
Package No.1 Supply of Man power WNo.1 to 18 & Pump house for Water supply Valvemen (17 Nos) & Senior Valvemen (2 Nos) on outsource basis CMC Kolar
Advance work for Raising of Plantation (2027 rains) -ANR-Model-II (including raising PB seedlings) in Kolimanjguni F.Sy. No. 481, 70-20 Ha. of Hiregutti Range during 2026-27
Advance work for Raising of Compensatory Plantation (2027 rains) -AR-Model-Misc. plantation (including raising PB seedlings) in Bangane F.Sy. No. -33, 13.00 Ha. of Kumta Range during 2026-27