Loading…
Loading…
8,860 results • Latest
Construction of drain and covering slab in dasarakoppalu from lakshmi narayan house to chandrashekar house in hassan cc limits
Resurvey of Kamaruru MF Reserved Forest, with its boundary length measuring approximately 9.10 Km in Anavatti Range, Sagara Division, during 2026-27.
Desilting of storm water drian from district court behind to chethan house in hassan cc limits
Improvements to ayacut road under Dy23 of VC canal from Gejalagere village to Gejalagere-Honagallymata Via(Vodaradoddi) to (SyNo54/3,54/1toSyNo54)beside railway track, road under catchment area of Dy2 of VC canal from Betahally village via Devegowdas land to Ellurammas new temple, road under catchment area of Dy14A of VC canal from Halluvadi village Chikkalingegowdas land to K Madegowdas land and road of VC canal catchment area of pick up nala 2 from Alakere village to Bandihalla under KRS project (SC Category)
Resurvey of Talaguppa RF Reserved Forest, with its boundary length measuring approximately 7.30 Km in Anavatti Range, Sagara Division, during 2026-27.
TMC/BTK/MF/2026-27/1
Resurvey of Kamalapura MF Reserved Forest, with its boundary length measuring approximately 6.60 Km in Soraba Range, Sagara Division, during 2026-27.
Improvements to atchkat roads at Jakkahalli coming under Taraka atchkut, at Hoskote coming under Harangi right branch canal and at Kattepura coming under Distributory -21 atchkut of Harangi project (ST Category)
Desilting of storm water drain in channapatna fromchetha house to vivekananda circle park in hassan cc limits
Resurvey of Haridravathi Block Reserved Forest, with its boundary length measuring approximately 23.07 Km in Hosanagara Range, Sagara Division, during 2026-27.