Loading…
Loading…
8,860 results • Latest
Resurvey of Neralamane RF Block I & II Reserved Forest, with its boundary length measuring approximately 31.70 Km in Hosanagara Range, Sagara Division, during 2026-27.
Construction of Additioanal Safety Barricade for Existing Elephant Display / Feeding area at Dubare Elephant Camp in Kushalnagar Range
Resurvey of Ramachandrapura RF APAJI 42 Reserved Forest, with its boundary length measuring approximately 7.23 Km in Nagara Range, Sagara Division, during 2026-27.
Construction of box culvert and approach road
Resurvey of Ramachandrapura RF APAJI 51 Reserved Forest, with its boundary length measuring approximately 11.65 Km in Nagara Range, Sagara Division, during 2026-27.
Resurvey of Hirebandady Bit I & II Proposed Reserved Forests Notified U/s 4 of KFA-1963 with its boundary length measuring approximately 25.00 Km in Puttur Range, Mangalore Division, during 2026-27, in order to provide technical support to the FSO & the DCF during the process of settlement and preparation of Settlement Map to be signed jointly by the both and also for preparation of Tie-line Map and Draft Notification proposed U/s 17 of KFA 1963.
Construction of 4 Class Room to Govt Hrps at Saigaon, Construction of 3 Class Room to Govt Hrps at Walsang, Construction of 1 Class Room to Govt Hrps at Nittur (B), Construction of 02 Class rooms to Govt.MPS at Lakhangaon, Construction of 02 Class rooms to Govt. HPS at Kesar jawalga village in Bhalki Taluka. Bidar Dist. (UNDER 4202)
Resurvey of Kodiyadibeliyuru Block Bit I & II Proposed Reserved Forests Notified U/s 4 of KFA-1963 with its boundary length measuring approximately 09.00 Km in Puttur Range, Mangalore Division, during 2026-27, in order to provide technical support to the FSO & the DCF during the process of settlement and preparation of Settlement Map to be signed jointly by the both and also for preparation of Tie-line Map and Draft Notification proposed U/s 17 of KFA 1963.
Resurvey of Yadehalli Block-I Proposed Reserved Forests Notified U/s 4 of KFA-1963 with its boundary length measuring approximately 15.00 Km in Anandapura Range, Sagara Division, during 2026-27, in order to provide technical support to the FSO & the DCF during the process of settlement and preparation of Settlement Map to be signed jointly by the both and also for preparation of Tie-line Map and Draft Notification proposed U/s 17 of KFA 1963.
Resurvey of Talaguppa RF Reserved Forest, with its boundary length measuring approximately 7.00 Km in Sagara Range, Sagara Division, during 2026-27.