Loading…
Loading…
8,761 results • Latest
INVITING A TENDER FOR PROVIDING A CAR (SWIFT DEZIRE/ETIOS/EQUIVALENT) FOR DAY TODAY MARKETING ACTIVITIES ON RUNNING KILOMETER BASIS FOR CHIKMAGALUR DISTRICT FOR A PERIOD OF 02 YEARS
Sr. DEN/North/SBC sec : Baiyappanahalli - Dharmavaram sec : Proposed RUB No. 308/A at Railway km 84/900-85/000 between Viduraswattha (VWA) - Devarapalle (DPE) stations, RCC Box size 2x7.50mx5.15m by box pushing method (Two packet system). Maintenance period is 4 years
Construction of weir near Jack well of Channabasaweshwara LIS across Tungabhadra River near Valaballary village in Sindhanur Taluka, Raichur District.
Survey, Investigation, Design, Supply, Erection, Testing and Commissioning of Lift Scheme comprising of Construction of Bridge cum Barrage(BCB), Intake Structure, Pumping Machineries, 11/0.443Kv Electrical Substation, Transmission Line, Terminal Bay, Rising Main, Delivery Chamber, for Supplementing Water to the suffering atchkat of tail End portion of Sub Distributary 54/3R of Distributary-54 under TLBC by Lifting water from Sindhanur Halla near Mullur Village in Sindhanur Taluk, Raichur District including supply of spares parts and tools, O&M for five years after successful commissioning of the work for Sindhanur LIS Cum BCB works on Turnkey Basis.
Survey,Investigation,Design,Supply,Erection,Testing & Commissioning of Lift Scheme For Supplementing Water to the Suffering Atchkat in D-36 from ch 842 to ch 1280 (TEWC),Under TLBC by Lifting Water From Tungabhadra River Near Salagunda in Sindhanur TQ,Raichur Dist On Turnkey Basis,PHASE I WORK Comprising of Construction of Intake Structure,Jackwell cum Pumphouse, Pumping Machineries, 33/6.6kV Electrical Substation,33kV Transmission Line,110/33kV Transformer Bay with 33kV Terminal Bay Rising Main(2.74Km) Including Supply of Spare Parts & Tools, O & M for Five Years After Successful Commissioning of the Work Under Salagunda LIS Phase-I works on turnkey basis