Loading…
Loading…
8,859 results • Latest
Construction of DoubleDecker structures for a length of 6.521 Km excluding JP Nagar 4th Ph station from Ch-0.330 Km to Ch.6.326 Km and 4 Nos of Elevated Double Decker Metro Stations JP Nagar 5th Ph,JP Nagar,Kadirenahalli and Kamakya Jn. of BMRCL Ph3.
Construction of Double Decker structures for a length of 5.408 Km from Ch.6.326 Km to Ch.11.734 Km and 4 Nos of DoubleDecker Metro Stations, Hoskerehalli, Dwaraka Nagar, Mysore Road and Nagarbhavi Circle of BMRCL, Ph3.
Construction of Maski Bypass Starts at existing Km 144.220 and ends at existing Km 151.760 and Sindhanur Bypass Starts at existing Km 168.370 and ends at existing Km 180.800 on NH 150A in the State of Karnataka
Desks and Bench/Chair set for Classroom/Training Area (Q2), Office Chair (V3) (Q2), Steel Shelving Cabinets (Adjustable Type) confirming to IS 3312 (V3) (Q2), Executive Table (V3) (Q2), Modular Table/Meeting Table/Centre Table (V2) (Q2)
Design and Construction of Residential Buildings Towers Townships trunk infrastructure within C1 and C2
FLEET BASE BUILDINGS WATERFRONT WORKS(FBW) - CONSTRUCTION OF FLEET BASE BUILDINGS AND INFRASTRUCTURE, EQUIPMENT SUPPLY, INSTALLATION, COMMISSIONING, OPERATION AND MAINTENANCE OF WATERFRONT FACILITIES AT NAVAL BASE, KARWAR, KARNATAKA
DOCKYARD WORKS - CONSTRUCTION OF DOCKYARD BUILDINGS AND INFRASTRUCTURE, EQUIPMENT SUPPLY, INSTALLATION, COMMISSIONING, OPERATION AND MAINTENANCE OF FACILITIES AT NAVAL BASE, KARWAR, KARNATAKA
FLEET BASE BUILDINGS LANDSIDE WORKS (FBL) - CONSTRUCTION OF FLEET BASE BUILDINGS AND INFRASTRUCTURE, EQUIPMENT SUPPLY, INSTALLATION, COMMISSIONING, OPERATION AND MAINTENANCE OF LANDSIDE FACILITIES AT NAVAL BASE, KARWAR, KARNATAKA