Loading…
Loading…
8,859 results • Latest
Redevelopment of Berth No. 9 for Handling Liquid Bulk Cargo through Public-Private Partnership on Design, Build, Finance, Operate and Transfer basis
Gruop A- DHDT Unit_Electrical Drive Package, Gruop A- DHDT Unit _ Mandatory Spares _List as per MR, Gruop A- DHDT Unit_ Site Training, Gruop A- DHDT Unit _ Site Supervision of Erection or Installation, Testing and commissioning, Group -B-CHT Unit _ Electrical Drive Package, Group -B-CHT Unit _ Mandatory Spares _List as per MR, Group -B-CHT Unit _ Site Training, Group -B-CHT Unit _ Site Supervision of Erection or Installation, Group-C-DCU Unit _ Electrical Drive Package, Group-C-DCU Unit _ Mandatory Spares_List as per MR, Group-C-DCU Unit _ Site Training, Group-C-DCU Unit _ Site Supervision of Erection_ Installation
CABLE TIES 200X 4.7 MM, CABLE TIES 220X 4.9 MM, CABLE TIES 150X 7.5 MM, CABLE TIES 360X 7.9 MM, CABLE TIES 250X 4.7 MM, CABLE TIES 150X 4.5 MM, CABLE TIES 300X 7.6 MM, CABLE TIES 100X 3.5 MM, OIL JOINT 1 8 1600MM X 1372MM X 3.2MM, OIL JOINT 1 64 GASKET OIL PROOF JOINING 62X42X1 64
C Arm Fluoroscope X - Ray Machine (V2) (Q2) (3 (3 ))
Digital Storage Oscilloscope (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Consultancy Services for Preparation of feasibility study detailed project report survey and preparation of land plan for widening to two lane with paved shoulder on NH 169A from Km. 30.75 to Km. 51.60 Agumbe Ghat in the State of Karnataka
Request for Proposal (RFP) for Concessioning of Berth No. 13 for Handling Liquid Bulk/LPG/Chemicals/POL Products on Captive Basis at New Mangalore Port
Widening Re-Construction to Four Lane from Km 0.000 to Km 15.870 Near Miriyan Telangana Karnataka Border Chincholi Section of NH 167N in Kalaburagi District in the State of Karnataka on HAM under Annual Plan 2023 24
Construction of Bypass to the Holenarasipura Town from Km 87.280 near Chikknahalli to Km 97.580 Near Hullahalli on NH 373 in the State of Karnataka on EPC mode under NH O Annual Plan 2023 24
Construction of DoubleDecker structures of approx. 6.652 Km from Ch.11.734 Km to Ch.16.746 Km in C1 and from Ch.4.620 Km to Ch.6.260 Km in C2 and Stations.Vinayaka Layout,PapareddyPalya,BDA Complex Nagarbhavi in C1 at Sunkadakatte in C2 of BMRCL,Ph3.