Loading…
Loading…
5,077 results • Latest
2024-25 MKD-Thodu cleaning in various wards MULAVUKAD GP
Reconductoring work LT ABC and LT standardisation under Moozhikkakadavu Transformer for Electrical Section Annamanada under ESD Koratty
The work includes dismantling of LT 1 PH, 3 PH OH lines and stringing with 3 PH LT ABC. Also the work includes insertion of poles Providing coil earth renewal of poles and renewal Providing LT Stay
1) LEVOSALBUTAMOL 0.63 MGRESPULE 2.5 ML, 2) LEVOSALBUTAMOL 1 MG PER 5 ML SYRUP 100 ML, 3) LEVOSALBUTAMOL 100 MCG ROTACAPS, 4) LEVOSALBUTAMOL 1.25+IPRATROPIUM 500MCG RESPULES, 5) EVO SALBUTAMOL 50 MCG + IPRATROPIUM BROMIDE 20 MCG CFC FREE INHALER, 6) LEVO SALBUTAMOL 50 MCG CFC FREE INHALER & 7) LEVO SALBUTAMOL 100 MCG + IPRATROPIUM BROMIDE 40 MCG ROTACAPS
1) TOLTERODINE TARTRATE 4 MG EXTENDED RELEASE CAP, 2) TAMSULOSIN 0.4 MG WITH DUTASTERIDE 0.5 MG TAB, 3) TAMSULOSIN 0.4 MG CAP/TAB/T & 4) TOLTERODINE TARTRATE 2 MG EXTENDED RELEASE CAP
PROVIDING GENERATOR FACILITY IN KOODARANHI GRAMAPANCHAYAT OFFICE