Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.6 LAccepted-AOC KAROOKKIL HOUSE NARIKKUNI P O KOZHIKODE | KOZHIKODE | KOZHIKODE | KERALA | ₹6.6 L | L1 | Accepted-AOC 1st Lowest |
| 2 | L2₹6.7 L+₹11,155.28 (1.69%)Rejected-AOC NELLOTTUPOYIL HOUSE PARAPPAMPOYIL P O THAMARASSERY | THAMARASSERY | KOZHIKODE | KERALA | ₹6.7 L+₹11,155.28 (1.69%) | L2 | Rejected-AOC 2nd Lowest |
| 3 | L3₹6.8 L+₹21,398.49 (3.24%)Rejected-AOC | ₹6.8 L+₹21,398.49 (3.24%) | L3 | Rejected-AOC 3rd Lowest |
Tender Value
₹7.0 L
EMD Value
₹17,600
Closing Date
13 Jul 2026, 5:00 pmClosed
ASSISTANT EXECUTIVE ENGINEER
Office of Assistant Executive Engineer, Electrical sub Division, Thamarassery, Pin 673573
The work includes dismantling of LT 1 PH, 3 PH OH lines and stringing with 3 PH LT ABC. Also the work includes insertion of poles Providing coil earth renewal of poles and renewal Providing LT Stay
2026_KSEB_858439_1
19/AEE-ESD/TMSY/2026-27/dtd 29/06/2026
Open Tender
Electrical Works
Percentage
Koduvally
Minimum 1 Year Experience in similar kind of work execution
5 documents required · 5 mandatory
₹1,770
₹17,600
28 Jul 2026
2 Jul 2026
16 Jul 2026
2 Jul 2026
13 Jul 2026
2 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing Stay for LT poles including digging & back filling pit in ordinary soil. | 20 | No | 938.82 | ₹18,776.4 |
| 2 | Additional rate for excavation of one Pit for LT Pole/LT Stay in Laterite. | 14 | No | 217.45 | ₹3,044.3 |
| 3 | Additional rate for excavation of one Pit for LT Pole/LT Stay in Hard Laterite. | 12 | No | 434.91 | ₹5,218.92 |
| 4 | Providing Fly stay for LT pole using LT PSC pole including digging and back filling pit in ordinary soil. | 2 | No | 3,062.14 | ₹6,124.28 |
| 5 | Renewal of existing damaged/old LT stay with new stay in place including excavation of stay pit, erection of new stay, backfilling pit and refitting of all items and conveyance of all materials. | 20 | No | 1,191.82 | ₹23,836.4 |
| 6 | Renewal of existing damaged/broken old LT stay in existing stay rod. | 8 | No | 434.91 | ₹3,479.28 |
| 7 | Dismantling (without damage) one km LT three phase 4 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly. | 4 | km | 14,129.32 | ₹56,517.28 |
| 8 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges. | 14 | Trip | 3,142.26 | ₹43,991.64 |
| 9 | Labour charges for loading LT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). | 53 | No | 478.82 | ₹25,377.46 |
| 10 | Stringing of 1.1 kV Aerial bunched cable of size 3 x 70
+ 1 x 16+1x 50 sqmm with bare/insulated Messenger through existing poles | 4,500 | m | 40.52 | ₹1,82,340 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1451226.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.63 MB
Specifications.pdf
Other Document • 2.40 MB
BOQ_1451226.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .