Loading…
Loading…
8,720 results • Latest
REPAIR TO ROOFING, FALSE CEILING, WALL PANELLING, JOINERY, ROLLING SHUTTER AND ALLIED WORK SERVICES AT MCMM UNDER GE (EAST) JABLPUR
Construction of an RCC drain in Wards 5 and7, stretching from the Main Road Daga Tiraha to the area in front of the former MLA house
PCC ROAD RAJPATI KE GHAR SE MUKUNDLAL BAIGA KE GHAR TAK WARD 11
HOSE CLIP WORM DRIVE A70 MAKE/BRAND AS KLIPCO OR KLIPWEL OR JOLLY OR SIMILAR TO IS 4762/2002
PAINT ENAMEL SYNTHETIC LIGHT GREY EXTERIOR FINISHING TO ISC 631 TO IS 2932/93. PACKING IN 20 LTRS.NEW NON RETURNABLE 20 LTRS M.S. DRUMS TO IS 2552/89 GRADE B-II. The date of supply of the material should be within 60 days from the date of manufacture. Spec:
BALL JOINT TRACTION LEVER To FIAT.
Supply and Installation of Heater control panel
Total Supply Price Including GST For Complete Group A1 As Per Sl. No. 01.00 Of MR, Total Site Works Charges Including GST For Complete Group A1 As Per Sl. No. 02.00 Of MR, Total Transportation Charges including GST For Group A1 As Per S. No. 03.00 Of MR
Riot Control Helmet with accessories (MHA) (Q3), Poly Carbonate Shield (MHA) (V2) (Q2), Polycarbonate Lathi (MHA) (Q3) (3 (3 ))