Loading…
Loading…
2,529 results • Latest
High End Laptop-Notebook (Q2)
LIGHTNING CONDUCTOR
Goods Transport Services - Per MT - Food Grains, Appointment of Road Transport Contractor for transportation of foodgrains & allied material etc from RH Khongsang to FCI FSD Tamenglong via weighbridge on regular basis for a period of 02 years; As per..
Misc MT Store
Cleaning and Protection work for Stilling basin area/Plunge Pool area of Downstream of Ithai Barrage, Loktak Power Station.
Mirus Linear Cutter
Mirus Linear Cutter
Mirus Linear Cutter
Repair/maint of OR Toilet block at COB T Minou of 36 AR (Manipur).
Entry and Mid Level Laptop - Notebook (Q2), A4 and Legal Size Multifunction Printer (MFP) (Q2), All in One PC (V2) (Q2) (3 (3 ))
Term contract for Repair/maint of Type-II Md Accn Block No. 15, 16 of Bn HQ of 33 AR.
TC for Non Residential Accn at Bn HQ Keithelmanbi of 33 AR
Term contract for repair/maint of COB Komlakhong
Periodical Services of Resdl Bldg for HQ 27 Sector Assam Rifles
Periodical Services of Non Resdl Bldg for HQ 27 Sector Assam Rifles
Cleaning of Septic Tank and Sewage Line for HQ 27 Sector Assam Rifles
Repair and Maint of Bldg No.T 20, T 21, T 61 and T 62 for HQ 27 Sector Assam Rifles
Repair and Maint of Bldg No.T 04 and T 05 for HQ 27 Sector Assam Rifles
Repair and maint of Drainage for HQ 27 Sector Assam Rifles
Cleaning of Water Tank for HQ 27 Sector Assam Rifles
Replacement of rusted CGI Sheet for HQ 27 Sector Assam Rifles
Repair and Maint of ORs Toilet Block for HQ 27 Sector Assam Rifles
Repair and Maint of Kote and SM Office for HQ 27 Sector Assam Rifles
Supply and Installation of Prefab Shelter for storage of size (18.30M x 7.620M)
Repair and Maint of Mandir for HQ 27 Sector Assam Rifles
Repair and Maint of JCO Club and JCO Dining Room for HQ 27 Sector Assam Rifles
Interactive Panels with CPU (Q2), Multimedia Projector (MMP) (Q2) (3 (3 ))
Line Interactive UPS with AVR (V2) (Q2) (3 (3 ))
Cleaning of phumdies and grasses at locations where AWLR is installed of Loktak Power Station.
Supply and Installation of 40 Men living Prefab Shelter Double Storey
SUPPLY AND INSTALLATION OF PUF SHELTER TOILET BLOCK (SIZE 8.01 M X 6.10M X 4.10M HEIGHT)
Shed with hardstanding
All in One PCs 14th Gen i5 14100 Processor, 16 GB RAM, 1TB SSD with preinstalled Window 11 Pro
Supply and Installation of OJL Prefab Shelter of Size (13.05M x 7.620M)
Design, Supply, Installation, Testing, Commissioning and Maintenance of UPS Power Backup for 500 Systems, NOC Room Setup and CCTV Surveillance System.
Renovation of 2nd & 3rd floor for Regional Office of CRCS at Mutha Chambers-2, Senapati Bapat Road, Pune
All in One PC (V2) (Q2) (3 (3 ))
Water dispenser with 20 ltr botel, Pedestal fan highly versatile stand, Emergency light, Induction Cooking Top, SS Magazine Display Stand
Digital Vernier Caliper, Digital Micrometer screw gage, Plastic beaker of slit contain, Weighing machine 0 to 50 kgs, Measuring tap 5 mtr, Measuring tap 3 mtr, Measuring tap 30 mtr, Steel Scale 12 inch, Slump Cone test apparatus, Enamel four tray, Ultrasonic thickness gauge machine