Loading…
Loading…
7,371 results • Latest
Strengthening of road from Mohanpur NH road to Devendra Chandra Nagar Waste Processing site (CBMTF) (L-2.40 km) during the year 2025-26/ SH Patch soling, WBM-2, WBM-3, BM, Carpeting and seal coat and RCC work etc.
Manual Tong, 2-3/8” to 3-1/2”, 14000 Ft-Lbs to 16000 Ft- Lbs, 2-3/8” to 7”, 35000 Ft-Lbs, 3-1/2” to 17”, 65000 Ft-Lbs with additional spares, 65000 Ft-Lbs, Manual tong 35000 ft-lbs 2 3/8” to 5-1/4"
Strengthening of road from Borker to Belcherra Bazar under Padmabil RD Block SH GSB, WBM, Carpeting, CD and other allied works.
Strengthening of road from Khowai Jeep stand to Assam rifle camp under Khowai RD Block under PWD RandB Khowai Subdivision during the year 2025 26 SH GSB, WBM, BM, BC etc.
SH GSB, WBM 2 and 3, DBM, BC, Retaining wall, CD and protection work etc. Group 2
FDR Restoration of Rangapania river bank at different stretches under Charilam RD Block during the year 2026 27 SH Advance procurement of flood fighting materials for upcomming Kalbaishaki and South East monsoon season under WR Sub Division Bishalg
Strengthening of road from Hatimara to Bhatimaidan from Ch 1.750 Km to 3.500 Km under Tulasikhar RD Block during the year 2025 26. SH WBM 2 and 3, PMC, Seal coat, CD etc. Gr II
FDR during the year2025 2026 Anti erossion work along the bank of Local cherra from House of Ratan Dey to House of Tapan Dey via Amrit Das house near Jamtala Shani Mandir to protect the embankment and land house of adjacent habitants AMC Ward No 10
Procurement of 1st category stone aggregate for use at various worksites of Dukli R D Block under R D Agartala Division of West Tripura District
FDR works at different locations under Kathalia RD Block SH Supplying of PVC wire creats sand bags etc during the year 2026 27 under WR Sub Division Kathalia
Procurement of Specified River sand for mortar concrete and Black sand for trench plinth filling in different areas of Dukli R D Block under R D Agartala Division of West Tripura District
FDR work of sonamura durgapur paddadhapa embarkment under the jurisdiction of water Resource sub division Melaghar during the year 2026 2027 SH supplying of empty gunny bags sand and placing of filled up sands bags placing of Weir crates etc
under Khowai RD Block under PWD RandB Khowai Subdivision during the year 2025 26 SH GSB, WBM, BM, BC etc.
Construction and Decoration of Temporary shed for VIPs and Audience, Food Stall, temporary toilet, laying of carpet and laying of flat brick soling etc. work at Assam Rifles Ground and Raj Bhavan, New Capital complex in connection with celebration of
Improvement of road from NH 108B to Upendra Sarkar house during the year 2025-26/ SH Box Cell, Retaining Wall, GSB, WBM-II, WBM-III, Prime Coat, Tack Coat, Carpeting, Seal Coat, etc. (L-1.052 km)
Utility shifting of DWS Pipeline of water supply schemes/ SH- Dismantling of CI/DI and PVC Pipeline along with necessary fittings,sluice valves, relaying of pipeline and layimg of new pipeline in damaged area etc. complete at L415-PWD Kurma-Burma Til
Construction of CC road with RCC drain and cover slab from Naraura road to Pandab Debnath house via Pradip Bhowmik house under Bishalgarh Municipal Council. W/No - 15
Construction of Cement Concrete road from Jahar Debnath house to Jallal Uddin house at Naraura under Bishalgarh Municipal Council. W/No - 14
Construction of Cement Concrete road with Bamboo palasiding from Naraura road to Lt Kalipada Bhowmik house under Bishalgarh Municipal Council. W/No - 14.
Utility shifting of DWS Pipeline of water supply schemes/ SH- Dismantling of CI/DI and PVC Pipeline along with necessary fittings, sluice valves, relaying of pipeline and, layimg of new pipeline in damaged area etc. complete at L404-NH 208 to TRPC Co
Construction of Cement Concrete road from Digendra Chandra Saha house to Sankar Saha house under Bishalgarh Municipal Council. W/No 4
Construction of CC road with RCC drain from Firoj Miah house to Santu Shil house under Bishalgarh Municipal Council. WNo 04. CH 0.00 M to 100.00 M
Utility shifting of DWS Pipeline of water supply schemes/ SH- Dismantling of CI/DI and PVC Pipeline along with necessary fittings, sluice valves, relaying of pipeline and, layimg of new pipeline in damaged area etc. complete at 1401-Surjyaham Para to
Raising and widening of embankment ,Cement Concrete Block,Flat brick soling, Toe Wall along with other allied works at ch 0.60 km to 1.215km(Group No-I)
DEVELOPMENT OF ROAD FROM T.K. ROAD TO KALYANPUR PWD SUB-DIVISION OFFICE VIA KALYANPUR BAZAR, KALYANPUR HOSPITAL, CDPO OFFICE, KALYANPUR BRIDGE ROAD UNDER KALYANPUR SUB-DIVISION PWD (R and B) DURING THE YEAR 2026-27 ......Gr.I
R/mtc. Of burnt motors and different capacity pumps of different DTW schemes within the jurisdiction of Ambassa Municipal area under DWS Sub-Division Ambassa
Dosing of Chlorine Dioxide solution directly to the delivery pipe line for disinfection of dirnking water at 0.55 MGD SWTP complete under DWS Sub-Division, Ambassa.
Maintenance of different L.I and D.T.W schemes under W.R Sub-Division No I, Kailashahar of Chandipur Block during the year 2026 27 SH Repairing of pump motor, panel board, suction line and delivery line etc and Rewinding of motors.GrI.
Repairing in/c. rewinding of existing VT pump with motor sets, starter main switch electrical panel boards, suction line etc and other works of 0.55 MGD capacity Surface Water Treatment Plant at Kulai under DWS Sub-Division Ambassa(Gr-II).
Remodeling of Ratiabari LI Scheme under W.R.Sub Division,Kumarghat Block during the year 2026 27SH Remodeling of PVC distribution system and other allied works.
Construction of CC Road (approx-70mtr) at Natunnagar, VIP Road from the H/O Naresh Debnath to Subodh Bhowmik with 30mtr drain under Dhigalia GP, AMC ward No-5
Providing Permanent Internal Electrification work for Newly constructed Satellite Dispensary at Abhoynagar, Agartala under RD Agartala Division
Development of road from (i) TK road to Kalyanpur Panchayet Office via Vegetable market (L-0.61Km) portion from ch 0.46 km to ch 0.55 km. (ii) Approach road of Kalyanpur bridge(L-1.20 Km) portion from ch 0.50 km to ch 1.20 km under Kalyanpur Sub-Divi
Construction of Ayushman Arogya mandir (Ayush) in Ramkrishna Shivalaya Ashram Homeopatthic Dispensary at Madhya Bhubanban under RD Agartala Division/SH-Permanent Internal Electrification work thereof
Construction of Bikramnagar Homeopathic Dispensary of Dukli RD Block Area under RD Agartala Division/SH Permanent Internal Electrification work thereof
Construction of 01 (one unit) 100 seated dining cum cafeteria at SCERT under Samagra Shiksha during the F.Y.2025-26
Construction of 01(one unit) 100 seated training hall at SCERT under Samagra Shiksha, during the F.Y.2025 26
Construction of Cement Concrete road from Bhabatosh Das house to Nantu Shil house under Bishalgarh Municipal Council. W/No 02
Construction of CC including retaining wall from Ranjit Sharma house to Ajit Sharma house at Murabari under Bishalgarh Municipal Council. Ward No 02
Construction of RCC drain from Subhash Deb house to Jatindra Saha house under Bishalgarh Municipal Council W/No- 02
Construction of Brick soling road from Nepal Debnath house to Tapas Debnath house under Bishalgarh Municipal Council. Ward No 02
Construction of CC road including Retaining wall from near Sailendra Ch Saha house to Netai Karmakar house at Banbihar under Bishalgarh Municipal Council. W/No 07
Construction of RCC drain from Goutam Bhowmik house to Kamthana road under Bishalgarh Municipal Council W/No- 8
Construction of RCC drain from Tapas Bhadra house to OCN (CH 0.00 M to 105.00 M) under Bishalgarh Municipal Council. Ward No 06
Brick soling of Road formation including RCC drain from near Suman Bhattacharjee house to Laxman Karmakar house at Puranpally under Bishalgarh Municipal Council. W/No 07
FDR/Jurisdiction mtc. of different roads under PWD (RandB),Jatanbari Sub-Division, for the year 2026-27/SH- SH-Land slide clearance, Bats filling,WBM,Patch Re-carpeting, grouting, sand seal coating, Surface drains, Wire crates etc.(Group I)
Mtc. of PWD road from Hrankhal bazar to Krishnahow road (L-4.50 Km) during the year 2026-27/ SH-CD, pucca drain, patch metalling, carpetting etc.
Providing special repair renovation and periodical maintenance of EI works and upkeeping of the existing DG sets at LOK BHAVAN Capital Complex Agartala for the year 2026_27
Cleaning, Sanitation and Disinfection Service - Outcome Based - Healthcare; General Cleaning (Sweeping, Mopping, dusting); Indoor, Outdoor, basement etc