Loading…
Loading…
7,357 results • Latest
Construction
Development of road from Kebal Para to NEC Para (Ch. 0.00 Km to 1.30 Km) under 12- Takarjala Assembly Constituency.
Development of road from Rajkumar to Sovamani para (Ch 0.00 km to 1.564 km) under 12-Takarjala Assembly constituency.
Development of Road From ADC HQ to Devsingh Thakur Para via Nabasardar Para (Ch 0.00 Kmto 1.50 Km) under 12- Takarjala Assembly constituency.
Development of road from AA Road to Twisikam (Ch 0.00 Km to 0.893 Km) under 12-Takarjala Assembly Constituency.
Development of road from Meghnath sardar para to Khaswrang Chowmuhani (Ch 0.00 Km to 2.10 Km) under 12- Takarjala Assembly Constituency.
Development of road from AA road (Champaknagar) to Khumtia via Bikram Molsom (from Ch 4.00 Km to Ch 8.00 Km) under 12-Takarjala Assembly Constituency (Gr-II)
Development of road from AA road (Champaknagar) to Khumtia via Bikram Molsom (from Ch 0.00 Km to Ch 4.00 Km) under 12-Takarjala Assembly Constituency (Gr-I)
Development of Road From ADC HQ to Samandanda Para (Ch 0.00 Km to 0.550 Km) undre 12- Takarjala Assembly constituency.
Development of road from Binan kobra to Sridam kobra (L039) (Length 3.752 km) under 11 Mandaibazar Assembly Constituency.
sal Ballies post,Bamboo palasiding ,filter media,block pitching and gabian structure.
Drilling and development of 50 x 150 mm dia SBDTW with contractors mini rig construction of IRP shed in all respect at District Jail, Kailashahar within the jurisdiction of DWS Sub-Division, Kailashahar
Construction
Development of road from AA road (Champaknagar) to Khumtia via Bikram Molsom (from Ch 12.00 Km to Ch 14.00 Km) under 12-Takarjala Assembly Constituency (Gr-IV)
Construction
SH Building portion G plus 1 including internal water supply sanitary installation SBDTW and boundary wall during the FY 2025 26
evelopment of Old NEC to Bhatimaidan road at Ch. 0.50 Km under the jurisdiction of Champahour Subdivision, Tulasikhar Block during the year 2026 27 SH Protection of road embankment by wire crest. Group II
Request for Proposal(RFP) for Selection of Agency For Supply Of Manpower under DIT
Development of Agartala-Simna road (near Brahmakunda, Tingaria, Kalagachia, Sidhai) during the year 2026-27/SH- Construction of embankment with earthfilling, Wire crates, brick bats, palasiding with allied works.
Repairing of Sub Seed store at Old Agartala Agri Sub Division.
Development of the road from Bidyabil Bazar to Karangicherra BOP Camp from Ch. 0.75 Km to 1.50 Km L 1.50 Km under Tulasikhar RD Block during the year 2026 27 SH Patch WBM III, Recarpeting, Seal coat, Protection work etc. Gr II
Construction of Retaining wall on Gonda Twisa-Raishyabari road to Bolongbasa-Dalapati road during the year 2026-27 / SH- Retaining wall, Back filling etc.
Development of the road from Bidyabil Bazar to Karangicherra BOP Camp from Ch. 0.00 Km to 0.75 Km L 1.50 Km under Tulasikhar RD Block during the year 2026 27 SH Patch WBM III, Re carpeting, Seal coat, Protection work etc. Gr 1
Replacement of DTW under RWS Scheme 2026-27/SH- Drilling, Development of 3 Nos. DTW with Contractors NORMAL capacity direct rotary drilling rig and other machineries, equipment in/c commissioning of DTW complete under DWS Division Dharmanagar
Development of the road from TK road Diversion to Asharam para Awc L 400 m under PWD RandB Khowai Sub Division during the year 2026 27SH Earthwork, Pothole Repair, patch WBM III, Recarpeting, Road side drain.
Development of Agartala-Simna road (near Rangachara) during the year 2026-27/SH- Construction of embankment with earthfilling, palasiding, salpost driving with allied works.
Construction
Demolishing and removal of existing Hostel Building at Srikantabari H.S. School (Load Bearing wall(250 mm thick) with GCI sheet roofing), East Pilak, South Tripura District. plinth area - 187.50 Sqm
Construction of Boundary Wall and Yard Development for Village Level Farmers Advisory Centre at Sonatala.
Development of the road from PMGSY road to NH 208 L300 Mtr. under Khowai Subdivision during the year 2026 27 SH Earth work, Pothole repair, patch WBM III, Recarpeting. Road side drain.
A3 Size Multifunction Printer (MFP) (Q2)
SH- WBM-III, Carpeting, Drain etc. (Portion from ch. 0.000 Km to ch. 1.280 Km)
Construction of (G1) Integrated Public Health Laboratory(IPHL) unit at Khowai District Hospital under RD Teliamura Division./SH Providing Internal Electrification works thereof(As per PWD SOR Electrification-2021)
Security Manpower Service (Version 2.0) - Office/Commercial/Institutions/Residential; Unarmed Security Guard
Maintenance
Development of road from Nagendra Tripura to Kumar Singh Para (L-032) (Length - 3.11 Km) under Gonda Twisa Sub-Division, PWD(RandB) during the year 2026-27 / SH- Clearing Road land, Surface drains, WBM-3, Re-Carpeting etc.
Development of road from Manipuri Chowmuni to Chachubazar CH.0.00 km to 11.00 km during the year 2026-27/SH- Repairing of pot-holes etc
SH- WBM-III, Repairs of potholes, Re-carpeting etc.
UWS scheme under North Tripura District during the year 2026-27/SH-Urgent maintenance WTP at Dharmanagar and other allied works.
Maintenance
Development of road from Mog para to Gira Chandra Para (L-026) (Length-7.924 Km) under Gonda Twisa Sub-Division PWD(RandB) during the year 2026-27/SH- Clearing Road land, Surface drains, WBM-3, Re-Carpeting etc. (portion from Ch. 4.00 km to 7.924 km)
Development of Old NEC to Bhatimaidan road at Ch. 0.50 Km under the jurisdiction of Champahour Subdivision, Tulasikhar Block during the year 2026 27 SH Protection of road embankment by wire crest. Group I
Urgent Mtc of L I and DTW scheme Pump houses under Jubarajnagar R D Block Water Resource Sub division Dharmanagar during the year 2026 27 SH Repairing of wood work GCI roof walling etc
Providing IE Work in the outdoor areas of the IGM Hospital Agartala Tripura W
SH- WBM-III, Repairs of Pot holes, Carpeting, Re carpeting, Seal Coat, soling, paver block etc.
Development of different road under the Jurisdiction of North Sub-Division, PDW(RnB) during the year 2026-27/SH- Grouting, surface drain, patch soling, drain maintenance etc.
Grouting, PMC, jungle cutting
Development of road from Desh Bandhu Club to Old Vullongbasa para (L-035) (Length - 2.44 km) under Gonda Twisa Sub-Division, PWD(RandB) during the year 2026-27/SH- Surface drains, WBM-3, Tack coat, Re-Carpeting etc.
Development of road from Mog para to Gira Chandra Para (L-026) (Length-7.924 Km) under Gonda Twisa Sub-Division PWD(RandB) during the year 2026-27/SH- Clearing Road land, Surface drains, WBM-3, Re-Carpeting etc. (portion from Ch. 0.00 km to 4.00 km)