Loading…
Loading…
2,020 results • Latest
SITC Of Grid Connected Solar PV Power Plant Including All Associated Electrical, Civil and Mechanical Works on Ground or Suitable Location at Ayudh Vihar, Indraprasth Lane No-3, SGRR Nehrugram
Consultancy Services of Authoritys Engineer for supervision of Rehabilitation and up-gradation to 2-lane configuration of Kangarchina to Almora Road from km 161.600 to Km 196.670 of NH-309A in the State of Uttarakhand (Package-V).
Consultancy Services for Authoritys Engineer for supervision of Rehabilitation and up-gradation to 2lane configuration of NH309A from km 73.66 Udiyari bend to km 103.25 Kanda Existing Chainage 80 to Km 110 of NH-309A in the State of Uttarakhand Pkg-1
Request for Technical and Commercial Proposal (RFP) for Design of RIC Assy and IPC Assy and supply of Sample cards
EXEC OF SURF WK CONSISTS PREP OF SUBGRADE P AND L OF 100 MM GSB 02 LAYER 75 MM WMM 02 LAYER 75 MM DBM 40 MM BC INCL PRIME COAT TACK COAT ROAD MARKING AND BERM FILLING BET KM 0 TO KM 18pt54 ON ROAD MENDI TSANGCHOKLA IN 72RCC 36TF SHIVALIK UTTARAKHAND
Supply of water through tankers in Dehradun Cantt