Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹51.0 CrAdmitted-Finance BATHINDA | BATHINDA | PUNJAB | 151001 | ₹51.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹54.3 Cr+₹3.3 Cr (6.53%)Admitted-Finance REGD OFFICE 3 1742 NEAR EVERY DHARAM KANDA SIRSA ROAD MANSA 151505 PUNJAB | MANSA | MANSA | PUNJAB | 151505 | ₹54.3 Cr+₹3.3 Cr (6.53%) | L2 | Admitted-Finance |
| 3 | L3₹54.8 Cr+₹3.8 Cr (7.41%)Admitted-Finance 1704 SECTOR 21 PANCHKULA | ₹54.8 Cr+₹3.8 Cr (7.41%) | L3 | Admitted-Finance |
| 4 | L4₹58.3 Cr+₹7.3 Cr (14.4%)Admitted-Finance | ₹58.3 Cr+₹7.3 Cr (14.4%) | L4 | Admitted-Finance |
| 5 | L5₹64.5 Cr+₹13.5 Cr (26.4%)Admitted-Finance | ₹64.5 Cr+₹13.5 Cr (26.4%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | N H Constructions PvtLtd L3 | SKA INFRA PROJECT PRIVATE LIMITED L2 | MSC INFRA GLOBAL PRIVATE LIMITED L5 | TMAP PROJECTS LLP L4 | GURBACHAN SINGH CONSTRUCTIONS PRIVATE LIMITED L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00SURFACING WORKS ON MENDI-TSANGCHOKLA ROAD BETWEEN KM 0.000 TO KM 18.540 (Altd 4201-5400 mtr) | ||||||||
| 1.01 | Preparation of sub-grade in SMB by excavating upto 20 cm avg depth, dressing excavated earth to required camber or super elevation and consolidating with power roller incl watering & disposal of surplus earth within a lead of 30 mtr as specified in MoRT&H Specification on Road & Bridge works (Fifth Revision), Particular Specifications and as directed by the Engineer-in-Charge/OC Contract. | 1,36,036.89 | Sqm | 200 ₹2,72,07,378 | 100 ₹1,36,03,689 | 10 ₹13,60,368.9 Lowest | 210 ₹2,85,67,746.9 | 156 ₹2,12,21,754.84 |
| 1.02 | GSB (Ist Layer) 10 Cm Thick (compacted) with stone aggregate conforming to grading No 1 as per table 400-1 of MoRT&H specifications for roads and bridges works including supply of material spreading in layers watering and compaction as specified in Particular Specifications and as directed by the Engineer-in-Charge/OC Contract. | 13,603.69 | Cum | 5,500 ₹7,48,20,295 | 9,500 ₹12,92,35,055 | 3,200 ₹4,35,31,808 Lowest | 7,200 ₹9,79,46,568 | 7,275 ₹9,89,66,844.75 |
| 1.03 | GSB (IInd Layer) 10 Cm Thick (compacted) with stone aggregate conforming to grading No 1 as per table 400-1 of MoRT&H specifications for roads and bridges works including supply of material spreading in layers watering and compaction. | 13,603.69 | Cum | 5,500 ₹7,48,20,295 | 9,500 ₹12,92,35,055 | 3,200 ₹4,35,31,808 Lowest | 7,200 ₹9,79,46,568 | 7,275 ₹9,89,66,844.75 |
| 1.04 | WMM (Ist Layer): Providing, laying and compacting Wet Mix Macadam in 75 mm compacted layer with clean crushed graded aggregates conforming to MoRT&H Clause 406, Table 400-12 and Table 400-13, premixed with water at OMC in approved WMM plant with controlled addition of water and forced/positive mixing, transported, laid to required line, level, grade and camber, compacted with approved vibratory roller to specified density, tested and accepted before laying subsequent layer, complete as per Particular Specifications and directions of Engineer-in-Charge / OC Contract. Unit: Sqm at 75 mm compacted accepted thickness. | 6,158.75 | Cum | 9,000 ₹5,54,28,750 | 7,000 ₹4,31,11,250 | 3,500 ₹2,15,55,625 Lowest | 7,500 ₹4,61,90,625 | 7,350 ₹4,52,66,812.5 |
| 1.05 | WMM (IInd Layer): Providing, laying and compacting Wet Mix Macadam in 75 mm compacted layer with clean crushed graded aggregates conforming to MoRT&H Clause 406, Table 400-12 and Table 400-13, premixed with water at OMC in approved WMM plant with controlled addition of water and forced/positive mixing, transported, laid to required line, level, grade and camber, compacted with approved vibratory roller to specified density, tested and accepted before laying subsequent layer, complete as per Particular Specifications and directions of Engineer-in-Charge / OC Contract. Unit: Sqm at 75 mm compacted accepted thickness. | 8,614.05 | Cum | 9,000 ₹7,75,26,450 | 7,000 ₹6,02,98,350 | 3,500 ₹3,01,49,175 Lowest | 7,500 ₹6,46,05,375 | 7,350 ₹6,33,13,267.5 |
| 1.06 | Providing, laying and compacting Dense Bituminous Macadam, DBM Grading 1, 75 mm compacted thickness, conforming to MoRT&H Clause 505 and Tables 500-8, 500-9 and 500-10, using approved viscosity grade paving bitumen selected as per MoRT&H Table 500-1 and approved Job Mix Formula; minimum binder content 4.0 percent by mass of total mix for DBM Grading 1, subject to aggregate specific gravity correction and approved JMF; including approved filler, anti-stripping agent if required, HMP mixing, covered/insulated transportation, laying by sensor paver, compaction, testing, traffic control and all incidental operations complete. Unit: Sqm at 75 mm compacted accepted thickness. | 5,725.47 | Cum | 24,000 ₹13,74,11,280 | 16,000 ₹9,16,07,520 Lowest | 54,000 ₹30,91,75,380 | 20,000 ₹11,45,09,400 | 18,000 ₹10,30,58,460 |
| 1.07 | Providing, laying and compacting Bituminous Concrete, BC Grading 2, 40 mm compacted thickness, conforming to MoRT&H Clause 507, Table 500-16 and Table 500-17, over prepared and accepted bituminous bound surface after application of tack coat, using approved viscosity grade paving bitumen selected as per MoRT&H Table 500-1 and approved Job Mix Formula; minimum binder content 5.4 percent by mass of total mix for BC Grading 2, subject to aggregate specific gravity correction and approved JMF; including approved mineral filler, anti-stripping agent if required, HMP mixing, covered/insulated transportation, laying by sensor paver, compaction, testing, traffic control and all incidental operations complete. Unit: Sqm at 40 mm compacted accepted thickness. | 3,053.58 | Cum | 27,000 ₹8,24,46,660 | 18,000 ₹5,49,64,440 Lowest | 59,000 ₹18,01,61,220 | 22,000 ₹6,71,78,760 | 21,000 ₹6,41,25,180 |
| 1.08 | Providing and applying tack coat with RS-1 grade cationic bitumen emulsion conforming to IS:8887 or approved low-viscosity VG-10 paving bitumen, as directed, by self-propelled or towed bitumen pressure distributor on clean prepared primed granular / bituminous surface at 2.5 kg per 10 sqm or at the applicable rate under MoRT&H Table 500-5 as approved after spraying trial, with no dilution or heating of RS-1 emulsion at site, allowing curing until volatiles evaporate before laying subsequent bituminous course, complete as per MoRT&H Clause 503. | 1,51,647.85 | Sqm | 40 ₹60,65,914 | 40 ₹60,65,914 | 30 ₹45,49,435.5 | 150 ₹2,27,47,177.5 | 25 ₹37,91,196.25 Lowest |
| 1.09 | Providing and applying prime coat with SS-1 grade cationic bitumen emulsion conforming to IS:8887 on prepared WMM/granular base surface, after cleaning with mechanical broom and high-pressure air jet, by self-propelled or towed bitumen pressure distributor at 7.5 kg per 10 sqm or as approved by Engineer-in-Charge after spraying trial, without heating or dilution of SS-1 emulsion at site, allowing curing for not less than 24 hours or as directed, and protecting the primed surface from traffic except construction traffic required for next course, complete as per MoRT&H Clause 502. | 76,339.55 | Sqm | 80 ₹61,07,164 | 60 ₹45,80,373 | 40 ₹30,53,582 Lowest | 368 ₹2,80,92,954.4 | 55 ₹41,98,675.25 |
Tender Value
₹65.0 Cr
EMD Value
₹15 L
Closing Date
15 Jul 2026, 6:00 pmClosed
Chief Engineer Project Shivalik
HQ CE (P) Shivalik Lal Tappad, Majrigrant Haridwar Dehradun road 248140
EXEC OF SURF WK CONSISTS PREP OF SUBGRADE P AND L OF 100 MM GSB 02 LAYER 75 MM WMM 02 LAYER 75 MM DBM 40 MM BC INCL PRIME COAT TACK COAT ROAD MARKING AND BERM FILLING BET KM 0 TO KM 18pt54 ON ROAD MENDI TSANGCHOKLA IN 72RCC 36TF SHIVALIK UTTARAKHAND
2026_BRO_771162_1
NIT-02-2026-27
Open Tender
Civil Works - Roads
Item Rate
365 days
KM 0 TO KM 18pt54 ON ROAD MENDI TSANGCHOKLA
As per tender conditions
8 documents required · 8 mandatory
₹0
₹15 L
HQ CE (P) Shivalik Lal Tappad, Majrigrant Haridwar
15 Sept 2026
10 Jun 2026
22 Jul 2026
11 Jun 2026
15 Jul 2026
24 Jun 2026
12 Jun 2026 - 22 Jun 2026
18 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1SURFACING WORKS ON MENDI-TSANGCHOKLA ROAD BETWEEN KM 0.000 TO KM 18.540 (Altd 4201-5400 mtr) | |||||
| 1.01 | Preparation of sub-grade in SMB by excavating upto 20 cm avg depth, dressing excavated earth to required camber or super elevation and consolidating with power roller incl watering & disposal of surplus earth within a lead of 30 mtr as specified in MoRT&H Specification on Road & Bridge works (Fifth Revision), Particular Specifications and as directed by the Engineer-in-Charge/OC Contract. | 1,36,036.89 | Sqm | - | - |
| 1.02 | GSB (Ist Layer) 10 Cm Thick (compacted) with stone aggregate conforming to grading No 1 as per table 400-1 of MoRT&H specifications for roads and bridges works including supply of material spreading in layers watering and compaction as specified in Particular Specifications and as directed by the Engineer-in-Charge/OC Contract. | 13,603.69 | Cum | - | - |
| 1.03 | GSB (IInd Layer) 10 Cm Thick (compacted) with stone aggregate conforming to grading No 1 as per table 400-1 of MoRT&H specifications for roads and bridges works including supply of material spreading in layers watering and compaction. | 13,603.69 | Cum | - | - |
| 1.04 | WMM (Ist Layer): Providing, laying and compacting Wet Mix Macadam in 75 mm compacted layer with clean crushed graded aggregates conforming to MoRT&H Clause 406, Table 400-12 and Table 400-13, premixed with water at OMC in approved WMM plant with controlled addition of water and forced/positive mixing, transported, laid to required line, level, grade and camber, compacted with approved vibratory roller to specified density, tested and accepted before laying subsequent layer, complete as per Particular Specifications and directions of Engineer-in-Charge / OC Contract. Unit: Sqm at 75 mm compacted accepted thickness. | 6,158.75 | Cum | - | - |
| 1.05 | WMM (IInd Layer): Providing, laying and compacting Wet Mix Macadam in 75 mm compacted layer with clean crushed graded aggregates conforming to MoRT&H Clause 406, Table 400-12 and Table 400-13, premixed with water at OMC in approved WMM plant with controlled addition of water and forced/positive mixing, transported, laid to required line, level, grade and camber, compacted with approved vibratory roller to specified density, tested and accepted before laying subsequent layer, complete as per Particular Specifications and directions of Engineer-in-Charge / OC Contract. Unit: Sqm at 75 mm compacted accepted thickness. | 8,614.05 | Cum | - | - |
| 1.06 | Providing, laying and compacting Dense Bituminous Macadam, DBM Grading 1, 75 mm compacted thickness, conforming to MoRT&H Clause 505 and Tables 500-8, 500-9 and 500-10, using approved viscosity grade paving bitumen selected as per MoRT&H Table 500-1 and approved Job Mix Formula; minimum binder content 4.0 percent by mass of total mix for DBM Grading 1, subject to aggregate specific gravity correction and approved JMF; including approved filler, anti-stripping agent if required, HMP mixing, covered/insulated transportation, laying by sensor paver, compaction, testing, traffic control and all incidental operations complete. Unit: Sqm at 75 mm compacted accepted thickness. | 5,725.47 | Cum | - | - |
| 1.07 | Providing, laying and compacting Bituminous Concrete, BC Grading 2, 40 mm compacted thickness, conforming to MoRT&H Clause 507, Table 500-16 and Table 500-17, over prepared and accepted bituminous bound surface after application of tack coat, using approved viscosity grade paving bitumen selected as per MoRT&H Table 500-1 and approved Job Mix Formula; minimum binder content 5.4 percent by mass of total mix for BC Grading 2, subject to aggregate specific gravity correction and approved JMF; including approved mineral filler, anti-stripping agent if required, HMP mixing, covered/insulated transportation, laying by sensor paver, compaction, testing, traffic control and all incidental operations complete. Unit: Sqm at 40 mm compacted accepted thickness. | 3,053.58 | Cum | - | - |
| 1.08 | Providing and applying tack coat with RS-1 grade cationic bitumen emulsion conforming to IS:8887 or approved low-viscosity VG-10 paving bitumen, as directed, by self-propelled or towed bitumen pressure distributor on clean prepared primed granular / bituminous surface at 2.5 kg per 10 sqm or at the applicable rate under MoRT&H Table 500-5 as approved after spraying trial, with no dilution or heating of RS-1 emulsion at site, allowing curing until volatiles evaporate before laying subsequent bituminous course, complete as per MoRT&H Clause 503. | 1,51,647.85 | Sqm | 1 | ₹1,51,647.85 |
| 1.09 | Providing and applying prime coat with SS-1 grade cationic bitumen emulsion conforming to IS:8887 on prepared WMM/granular base surface, after cleaning with mechanical broom and high-pressure air jet, by self-propelled or towed bitumen pressure distributor at 7.5 kg per 10 sqm or as approved by Engineer-in-Charge after spraying trial, without heating or dilution of SS-1 emulsion at site, allowing curing for not less than 24 hours or as directed, and protecting the primed surface from traffic except construction traffic required for next course, complete as per MoRT&H Clause 502. | 76,339.55 | Sqm | 2 | ₹1,52,679.1 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.26 MB
Tender.pdf
Tender Documents • 0.86 MB
IPact.pdf
Additional Documents • 0.12 MB
TCAL.pdf
Additional Documents • 0.10 MB
BOQ_863588.xls
BOQ • 0.35 MB
DateCorrNIT2.pdf
PDF • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .