193 results • Latest
DESIGN, SUPPLY AND CONSTRUCTION OF PUF SHELTER FOR OFFICE COMPLEX FOR HQ 16 BRTF AND ACCOMMODATION FOR JCO MESS AT HQ 16 BRTF UNDER PROJECT VIJAYAK IN LADAKH (UT)
P AND L OF GSB 15 CM, WMM 10 CM, DBM 5 CM AND BC 4 CM, PRIME, TACK COAT, ROAD MARKING, ROAD STUD FOR REHAB WKS BET KM 37.20 AND KM 46.91 ON ROAD RAMSINGHPUR- KUPLI - DHANDARA - GHARSANA
SS OF C/SAND (DRY) FOR PMT WKS OF CONST/IMPV OF RD HANGU-CHOR II TO NHSL (PS) SPFCN FRM KM 4.00 TO KM 8.50 THROUGH DEPT EXE MODE UNDR 130 RCC/ 764 BRTF (P) SWTK IN THE STATE OF SKM, JOB NO. 307/04
EXECN OF 09 PMW WKS AT HQ DGBR COMPLEX SEEMA SADAK BHAWAN RING ROAD NEW DELHI 110010 UNDER 1353 GE 21 BRTF PROJECT SHIVALIK
CONSTRUCTION OF SEVEN TUNNELS OF 63 M LENGTH EACH AT THREE DIFFERENT LOCATIONS IN UT OF LADAKH ON EPC MODE UNDER PROJECT VIJAYAK
P AND L OF BC 30MM THICK INCLUDING CORRECTION WKS WITH DBM 50MM AND RD MARKING FOR RESURFACING WKS BET KM 97 AND 105.620 ON RD BASAR BAME UNDER 92 RCC/44 TF IN PROJECT BMK IN THE STATE OF ARUNACHAL PRADESH
PROVIDING AND LAYING BITUMINOUS CONCRETE 3.00 CM THICK COMPACTED INCLUDING CORRECTION WORKS APPLYING TACK COAT ROAD MARKING 2.5 MM THICK AS PER MORTH SPECIFICATIONS BETWEEN KM 66.950 TO KM 74.542 ON ROAD GANGTOK-CHUNGTHANG FOR RESURFACING WORKS
SUPPLY AND STACKING OF S/AGGREGATES OF VARIOUS SIZES, SAND FOR ON ASUTAR - SHAHGARH ROAD UNDER 95 RCC / 45 BRTF PROJECT CHETAK IN THE STATE OF RAJASTHAN
SUPPLY AND STACKING OF STONE METAL 45 MM, STONE METAL 40 MM, STONE CHIPS 20 MM, STONE CHIPS 10 MM AND COARSE SAND (DRY) FOR PERMANENT WORKS BETWEEN KM 21.90 (DESIGNED KM 20.860) TO KM 27.00 ON ROAD CHALSA-JALDAKA-BINDU-BARRAGE UNDER 87 RCC/764 BRTF
CONSTRUCTION OF MILAM -DUNG ROAD FROM KM 0.00 TO KM 11.064 (DESIGN CHAINAGE 10.940 KM) FROM NEW TO NHSL SPECIFICATIONS UNDER PROJECT HIRAK IN UTTARAKHAND STATE ON EPC MODE
P AND L OF BC 30MM INCLUDING CORRECTION WKS WITH WMM 100 MM AND DBM 50MM AND RD MARKING FOR RESURFACING WKS BET KM 0 AND KM 11.106 ON RD AKAJAN LIKABALI UNDER 92 RCC/44 BRTF IN PROJ BRAHMANK IN THE STATE OF AP
P AND L OF DBM 50 MM THICK, BC 30MM THICK AND ROAD MARKING FOR BAL SURFACING WKS BET KM 37.9AND KM 47.850 ON RD KAYING TATO UNDER 92 RCC/44 TF IN PROJECT BMK IN THE STATE OF AP.
S AND S OF S/AGGREGATE OF VARIOUS SIZES AND FINE AGGREGATE FOR WBM, WKS ON RD YARLUNG LAMANG FM KM 0 TO KM 17.180 AND FOR DBM AND BC WKS AT HMP SITE AT KM 10.00 ON MENCHUKA TONGKORIA UNDER 1443 BCC SECTOR UNDER 44 BRTF PROJECT BMK IN AP
DESIGN AND CONSTRUCTION OF REGULATOR GATE (SLUICE GATES) ON KASUR NALA WITH CARRIAGE WAY, RCC VEHICULAR BRIDGE 5.95 MTR CARRIAGE WIDTH WITH PARAPET ON BOTH SIDES AT KHALRA DCB UNDER 141 DMC/49 BRTF PROJECT CHETAK IN THE STATE OF PUNJAB
PERIODICAL SERVICES OF CERTAIN BUILDINGS OF HQ DGBR AND OTM COMPLEX AT HQ DGBR SEEMA SADAK BHAWAN RING ROAD DELHI CANTT IN THE AREA OF 1353 GE 21 BRTF UNDER PROJECT SHIVALIK IN NEW DELHI
Design manufacture supply transport unloading stacking of factory made precast RCC box culvert segments 2x2x2m and 2x2x1pt5m delivery at 1020 IESPL near Rishikesh railway stn for constr on Mendi Tsanchokla Rd 72 RCC 36 TF Project Shivalik Uttarakhand
REPAIRING OF GATES AND GEARING/SPINDLE SYSTEM OF REGULATORS AT RD 41 AND RD 74 ON ABLD DCB IN 15 INF DIV UNDER 141 DMC / 49 BRTF/PROJECT CHETAK IN THE STATE OF PUNJAB
P AND L SPREADING AND COMPACTION OF 75 MM THICK WMM EACH IN 02 LAYERS 75 MM DBM AND 40 MM BC INCL CLEANING OF RD SURF APPLYING PC AND TC AND RD MARKING BW KM 0 PT 00 TO KM 5 PT 520 ON GUE Y JN Y2 JN ALL AS PER PART SPECI MORTH SPECI UNDER 108 RCC
CONSULTANCY SERVICE FOR PREPARATION OF DPR FOR CONSTRUCTION OF LEH-CHALUNKA ROAD TO NH DOUBLE LANE SPECIFICATION FROM KM 135.000 (EXISTING CHAINAGE) TO KM 150.00 (EXISTING CHAINAGE) IN UNION TERRITORY OF LADAKH UNDER PROJECT VIJAYAK (2nd Call)
IMPROVEMENT WORKS INCL DESIGN AND DRAWING PROOF CHECKED BY IIT FROM BET KM 103PT600 AND KM 104PT00 ON M S RD UNDER 70 RCC 38 BRTF PROJECT DEEPAK IN HIMACHAL PRADESH
SUPPLY AND STACKING OF VARIOUS MATERIALS FOR PERMANENT WORKS KM 0.00 TO KM 12.160 ON TUALCHENG-PAMCHUNGH ROAD UNDER 74 RCC/24 BRTF UNDER PROJECT PUSHPAK IN MIZORAM STATE (2nd CALL)
CONSTRUCTION/IMPROVEMENT OF LACHUNG-YUMTHANG-ZADONG ROAD (PART OF NH-310A) DESIGN CHAINAGE FROM KM 52.808 TO KM 81.203 (NET LENGTH 28.395 KM) FROM CL-9 TO NHDL WITH PAVED SHOULDER SPECIFICATIONS UNDER PROJECT SWASTIK IN SIKKIM STATE THROUGH EPC MODE
REPAIR MAINTENANCE OF INTERNAL WIRING AND CONNECTED MISCELLANIES WORKS OF HQ DGBR OFFICE AND OTM COMPLEX AT HQ DGBR SEEMA SADAK BHAWAN RING ROAD DELHI CANTT IN THE AREA OF 1353 GE 21 BRTF UNDER PROJECT SHIVALIK IN NEW DELHI
ESSENTIAL REPAIR TO B/R NATURE OF WORKS AT HQ DGBR COMPLEX SEEMA SADAK BHAWAN RING ROAD DELHI CANTT IN THE AREA OF 1353 GE 21 BRTF UNDER PROJECT SHIVALIK IN NEW DELHI
CONSTRUCTION OF OFFICERS MESS AT HQ CE (P) SWASTIK ON GANGTOK CHUNGTHANG ROAD UNDER 129 RCC 764 BRTF (P) SWASTIK IN SIKKIM STATE (JOB NO 303 550)
PROVIDING, LAYING AND COMPACTION OF BM 50 MM THICK LAYER, BC 30 MM THICK LAYER, ROAD MARKING 2.5 MM THICK AND FIXING OF CAT EYES FOR RE-SURFACING WORKS B/W KM 0.00 TO 8.00 ON GALHAR-SANSARI ROAD IN 118 RCC SECTOR UNDER 35BRTF / PROJECT SAMPARK
PROVIDING, LAYING AND COMPACTION OF HMP MIX FOR BM 50 MM THICK LAYER, BC 30 MM THICK LAYER, ROAD MARKING 2.5 MM THICK AND FIXING OF CAT EYES B/W KM 0.00 TO 6.50 ON DUL- GALHAR ROAD IN 118 RCC/35 BRTF/ PROJECT SAMPARK IN JK (UT)
PROVIDING, LAYING, SPREADING AND COMPACTION OF BM 50 MM THICK INCLUDING TACK COAT, BC 30 MM THICK INCLUDING TACK COAT AND ROAD MARKING ON ROAD BASOLI-BANI BETWEEN KM 5.000 TO KM 20.000 UNDER 69 RCC IN 35 BRTF /PROJECT SAMPARK IN JK
RESURF WKS WITH BC 30 MM WITH CORRN WK BM 50 MM THICK, RD MARKING TP PAINT 2.5 MM THICK , FIXNG CAT EYES BET KM 0.00 TO KM 10.40 ON KAPRA-BHALRA-BALOT-CHINTA RD AND BET KM 1.300 TO KM 2.300 ON ARNORA-LINK RD (TOTAL-11.130 KM CL-9) IN 118 RCC/SAMPARK
RE- SURFACING WORKS BETWEEN KM 141.000 TO 149.450 ON BASOLI BANI BHADERWAH ROAD TOTAL - 14.410 KM EQVT CL9 IN 118 RCC SECTOR UNDER 35 BRTF / PROJECT SAMPARK IN J and K
PROVIDING ARCH N STR DESIGN N DRG PROOF CHECKED BY IIT N CONSTR OF TECH INFRA SINGLE LVG ACCN FOR PBOR N ADMIN INFRA INCL SOIL INVEST AT WESTERN BASE WKSP (WBW) OF BRO AT GREF STATION PATHANKOT UNDER 35 BRTF (P) SAMPARK IN PUNJAB
PLSC OF 75MM WMM TWO LAYERS 50 MM DBM AND 40 MM BC INCL PRIME COAT AND TACK COAT AND ROAD MARKING FROM UPPER GRN TO LOWER GRN OF 20 KUMAON INCL SATA BTY AT HYMS SUMDO FROM KM 0PT00 TO KM 3PT00 UNDER 108 RCC
PREP OF SUBGRADE SCRIFYING OF BT AND PLC GSB 200 MM WMM 150 MM DBM 60 MM INCLPRIME COAT AND BC 40 MM THICK INCL TACK COAT ALONGWITH ROAD MARKING BERM FILLING AND SAND BLANKETING 25 MM BET KM 26PT5 TO KM 31 ON MANALI SARCHU ROAD
S/S OF VARIOUS TYPES STONE AGGREGATES, ON ROADS BAMANWALI-LAKHUSAR, JAMSAR-NOORSAR, NURSAR-PUGAL-KHOJEWALA, BIKAMPUR-BAJJU AND MUKAM-CHILLA-NAGAUR UNDER 101 RCC/49 BRTF/PROJECT CHETAK IN THE STATE OF RAJASTHAN
H AND C OF CEMENT, BITUMEN, BITUMEN EMULSION, STEEL, BB COMPONENTS AND MISC STORES FROM 519 SS AND TC TO FORWARD SECTORS UNDER 92 RCC AND 1443 BCC IN AOR OF 44 BRTF UNDER PROJECT BRAHMANK IN ARUNACHAL PRADESH STATE
btwn Km 19.775 to Km 37.000
SUPPLY AND STACKING OF STONE BOULDER, S/METAL 40 MM AND COARSE SAND (DRY) BETWEEN KM 38.00 TO KM 45.00 (NEW LOCATION KM 45.79) ON RISHI-RONGLI-KUPUP ROAD FOR PMT WORKS UNDER 130 RCC/764 BRTF UNDER PROJECT SWASTIK IN THE STATE OF SIKKIM JOBNO 309/289
CONSTRUCTION FOR PROVISION OF MULTIPURPOSE HALL AT HQ 16 BRTF UNDER PROJECT VIJAYAK IN LADAKH (UT)
SUPPLY AND STACKING OF SAND FOR PERMANENT WORKS BETWEEN KM 0.00 TO KM 10.88 -NEW KM 14.00 ON MUNNA CHANDER TUNGRI ROAD IN WEST KAMENG DISTRICT OF ARUNACHAL PRADESH
PERMANENT AND SURFACING WORKS FOR FLOOD DAMAGE RESTORATION WORKS 2025 26 BETWEEN KM 1 PT 770 TO KM 5 PT 700 ON MANALI SARCHU ROAD UNDER 70 RCC 38 BRTF ROAD SECTOR OF PROJECT DEEPAK IN HIMACHAL PRADESH STATE
REHABILITATION OF 45 MTR SPAN MALONIPANI BRIDGE TO BRING BACK SUPERSTRUCTURE TO ITs ORIGINAL POSITION, REPLACEMENT AND FIXING OF ALL BEARINGS AND FOLLOWED BY LOAD TESTING OF BRIDGE AT KM 12.572 ON ANINI-MIPI ROAD UNDER 1446 BCC/752 BRTF/CE(P) UDAYAK
Slope Stabilization / Hill Slope protection measured of approach road to Taram Chu bridge at km 15.800 on Chungthang-Lachen road under 86 RCC/758 BRTF/ Project Swastik in Sikkim State
PDG AND LYG OF HMP READY MIX BC 30 MM TH INCL CLEANING RD SURFACE APPLYING TACK COAT, CORRECTION WKS WITH BM 75 MM FOR RE-SURF WKS ON VARIOUS LOC KM 0.00 TO KM 7.600 (NET LENGTH 7.600 KM) ON N-V-T RD UNDER 74 RCC PROJECT PSK IN MIZORAM STATE
PROVIDING, LAYING, BM 50 MM, BC 30 MM THICK (HMP MIX), APPLYING TACK COAT, ROAD MARKING, ROAD STUD, ROAD DELINEATOR AND BERM FILLING ALL AS PER MORTH SPECIFICATIONS BETWEEN KM 0.000 TO 7.020 ON ROAD KKG-MESHAI OF 116 RCC UNDER 48 BRTF/PROJECT UDAYAK
CONSTRUCTION OF LIVING ACCOMMODATION FOR SUPVRs/JCOs/NCOs/ORs AT HQ CE (P) SWASTIK ON GANGTOK-CHUNGTHANG ROAD UNDER 129 RCC/764 BRTF (P) SWASTIK IN STATE OF SIKKIM UNDER JOB NO. 303/553
CONSTRUCTION OF LOWER GOMPA JANGDA BROKSAR ROAD TO NHSL SPECIFICATION FROM KM 0.00 TO KM 18.270 (DESIGN LENGTH 16.917 KM) (FMN,PMT,SURF) INCLUDING LA/FC AND SHIFTING OF UTILITY IN THE STATE OF ARUNACHAL PRADESH UNDER 125 RCC/763 BRTF PROJECT VARTAK
Constr of New Rd Nelya Dhaula (Pkg/02) to NHSL specifications from Km 12.00 to Km 41.691 with link rd 0.00 to 2.775 (Bhawani Post) (net Length 32.467 Km) in the state of Arunachal Pradesh under 127 RCC/ 42 BRTF Project Vartak (GS ICBR II)
S AND S OF S/ METAL 40 MM, S/CHIPS 13.20 MM/11.2 MM, COARSE SAND AND BRICKS ON ROAD 32 ML RAISINGHNAGAR AND APPROACH ROAD, SARDARPUR-BIKA-DABLA ROAD AND LINK ROAD NH 15 TO SARDARPUR-BIKA UNDER 141DMC/49 BRTF/CHETAK IN THE STATE OF RAJASTHAN
Providing, laying and compaction of Readymade Bituminous mix for BM 50mm, BC 40mm thick and Rd marking with thermoplastic paint for Resurf works bet km 286.110 to km 290.75 on Jammu Srinagar road under 122RCC 32TF Project Beacon in JK 2nd Call
SUPPLY AND STACKING OF S/AGGREGATES OF VARIOUS SIZES, SAND AND BRICKS FOR CONSTRUCTION / IMPROVEMENT OF ROAD RAMPURA-DUDER- PT 201 -EAST CAMP UNDER 101 RCC/ 49 BRTF PROJECT CHETAK IN THE STATE OF RAJASTHAN