SUPPLY AND STACKING OF DIFFERENT SIZE AGGREGATES AND STONE DUST SAND AT KM 106 HMP SITE ON BALIPARA CHARDUAR TAWANG ROAD FOR RESURFACING WORK 2026-27 ON RD BCT BET KM 90.200 TO KM 116.235 AND ON RD BOMDILLA BYPASS BET KM 0.0 TO KM 2.80 UNDER 91 RCC
P L C OF 75 MM TK DBM FOR CORCTON WK AND 40 MM TK BC SURF APPLY TC AND RD MRKNG FM KM 78 PT 200 TO KM 206 PT 231 ON M S RD AND KM 0 PT 00 TO KM 0 PT 300 ON ARNP ROAD AND KM 0 PT 000 TO KM 14 PT 200 ON ARSP 38 TF RD SCTR OF PJT DPK IN HP
PLS and C of 75 Mm each in Two Layer WMM 75 Mm DBM and 40 MM BC Incl Cleaning of Rd Surf and applying PC and TC and road Marking wks for Surf Works Bet Km 0 Pt 000 to Km 22 Pt 500 on SMD Rd under 108 RCC 759 BRTF Rd Sector of Project Deepak in HP
Prep of Subgrade Scarifying of Bt Surf PLC of GSB 200Mm WMM 150Mm DBM 60Mm Incl PC and BC 40Mm Incl TC as per MoRTH Spec with Rd Marking Earthwork in Embankment and Sand Blanketing 25Mm Bet Km 13 to Km 25 pt 400 on MS Rd Udr 70 RCC Sector of PJT DPK
P L AND COMPACTION OF 75 MM TK DBM FOR CORRECTION WORK AND 40 MM THICK BC FOR RE SURF INCLUDING CLEANING OF RD SURFACE APPLY PC TC AND RD MARKING FM KM 435 PT 000 TO KM 455 PT 220 ON PK RD UNDER 108 RCC 759 BRTF RD SECTOR OF PJTT DPK IN HP
PLC of WMM 100 mm WMM 150 mm DBM 60 mm and BC 40 mm thick inclu cleaning of road surface and applying prime and tack coat alongwith road marking as per MORTH spec bet km 80 to km 86 on SKTT Rd under 94 RCC 38 BRTF of Project Deepak in HP
Consultancy Service for carrying out Feasibility Study and Preparation of DPR for Constr of Rd New to NHSL on C K Rd fm Km 0 To 30 comma R D G B Rd fm Km 0 to 64 comma K D S Rd fm Km 0 to 23 and N T N Rd fm Km 0 to 9 under 68 RCC 759 TF PJT Dpk HP
SS of stone aggregate 40 mm comma 20 mm comma 10 mm and coarse river sand for constr of Pmt work bet km 0 pt 00 to km 22 pt 500 0 pt 00 considered at Sumdo on Sumdo Murmi Dogri Rd under 108 RCC 759 BRTF of project Deepak in HP State
Impvt Wks Incl Investigation Design and Drawing Proof Check by IIT fm Km 125 pt 05 to 125 pt 250 and Km 131 pt 950 to Km 132 pt 110 along S K T T Rd under 94 RCC 38 BRTF Rd Sector of Project Deepak in HP State
Design and Constr of RCC R Walls incl proof check of Design and Drgs Surf wks for FDR bet km 1 pt 770 to km 5 pt 700 and Surf wk between km 49 pt 800 and km 222.000 on Manali Sarchu Rd under 70 RCC comma 94 RCC 38 BRTF of Project Deepak in HP state
Design and Constr of 35 M Span PSC Maj Pmt Br with open foundation over Thangeni Nallah incl proof check and SSI report at km 72 pt 550 on SKTT Rd under 94 RCC 38 BRTF Rd of Project Deepak in HP State
DESIGN A CONSTRUCTION OF 500.00 MTR (50 M X 10 NOS) PSC BOX GIRDER BETAR BRIDGE OVER BETAR NALLAH AT KM 0.000 INCLUDING APPROACHES WORKS AND LA FC ON ROAD POONCH RAWALKOTE (FROM BETAR NALLAH TO PRCP) UNDER 79 RCC 31 BRTF PROJECT SAMPARK IN JK UT EPC
PL and C of 60 mm DBM and 40 mm BC for surfacing Wks incl cleaning of Rd surface apply PC and TC and Rd marking on various stretches bet km 13 pt 000 to km 36 pt 720 on KC Rd under 68 RCC 759 TF of Project Deepak in HP state
S and S of Stone Agg 40 20 10 mm and Coarse Sand for Protection Wall bet Km 348 to Km 363 on HT Rd and S Chips 11 pt 2 6 pt 70 mm and Coarse Sand for Resurf Wk on PP Rd at Km 389 pt 500 and Coarse Sand for Pmt and Surf Wks bet Km 0 to 41 on KC Rd
S and S of Stone AGG 40 mm and 20 mm and 10 mm and coarse sand for CONST of PMT Works BW km 0 PT 00 TO KM 12 PT 325 on GUE Y JN Y2 Rd under 108 RCC 759 BRTF of Project Deepak in HP state
PL and C of 75 mm DBM for correction work and 30 mm BC for resurf wks incl cleaning of Rd surface applying PC and TC and Rd marking on various stretches bet km 0 pt 00 to km 41 pt 000 on KC Rd under 68 RCC 759 TF of project Deepak in HP state
RE-TENDER SS OF STONE AGG 40 MM 20 MM 10 MM AND COARSE SAND FOR FDR WORKS BW KM 1 770 TO KM 5 700 AND FOR CONSTR OF ADDL PMT WK BW KM 31 PT 00 TO KM 185 PT ON M-S RD UNDER 70 RCC 38 BRTF PROJECT DEEPAK IN HP STATE
P L Spreading and Compaction of WMM 100 Mm in 01 Layer WMM 75 Mm Each in 02 Layers DBM 60 Mm and BC 30 Mm and apply PC and TC and Rd Marking as per MoRTH Specn bet Km 0 to Km 2 pt 8 on HQ 136 I Inf Bde Gp to FSC Pooh Ex 2136 Fd Hosp Project Dpk
IMPROVEMENT WORKS INCLUDING INVESTIGATION DESIGN AND DRAWING PROOF CHECKED BY IIT AT KM 419 Pt 500 NEAR TINKU NALLAH ON POWARI POOH ROAD UNDER 108 RCC 759 BRTF SECTOR OF PROJECT DEEPAK IN HIMACHAL PRADESH STATE
RETENDER S S OF STONE AGG 40 MM 20 MM 10 MM AND COARSE SAND FOR CONSTR OF RCC ABUTMENTS AT HOME BANK AND FAR BANK OF FIVE REPLACEMENT BR SITES BET KM 381 040 TO KM 483 130 UNDER 68 RCC 108 RCC ON HT RD UNDER 759 BRTF SECTOR OF PROJECT DPK IN HP
SS OF STONE AGGREGATES 40 MM AND 20 MM AND 10 MM AND COARSE SAND FOR PMT WORKS AND 26 MM AND 13.2 MM AND 6.7MM AND COARSE SAND FOR SURF WORKS FOR CONST OF 05 NOS MCBC OF 19PT80 MTR SPAN EACH BET KM 177PT00 TO KM 178PT150 ON MS ROAD UNDER 70 RCC
PL AND C OF 75 MM THICK DBM INCLUDING PRIME COAT FOR CORRECTION WK AND 40 MM THICK BC INCL CLEANING OF RD SURFACE APPLY TACK COAT AND RD MARKING ALL AS PER PARTICULAR SPEC KM 30 PT 645 TO KM 40 AND KM 86 TO KM 96 ON SKTT RD UNDER 94 RCC 38 BRTF
P L AND COMPACTION OF 75 MM THICK DBM FOR CORRECTION WK INCL TACK COAT AND 40 MM THICK BC INCLTACK COAT AND CLEAN OF RD SURF RD MARK ALL AS PER PART SPECI FROM BW KM 0 PT 400 TO KM 197PT405 ON MS RD UNDER 70 RCC 38 BRTF RD SECTOR OF PROJECT DPK
DESIGN AND CONSTR OF MI ROOM BUILDING INCL SOIL INVESTIGATION AND PROOF CHECK OF DESIGN AND DRAWING AT HQ 38 BRTF UNDER 70 RCC 38 BRTF OF PROJECT DEEPAK IN THE STATE OF HP
SURFACING WKS FOR GSB150 MM, WMM100 MM DBM60 MM, PRIME, TACK COAT BY BITUMEN EMULSION, BC40MM THK BY TACK COAT AND PROV, FIXING OF RD STUD100X100 MM, RD MARKING WITH THERMOPLASTICPAINT 2.5 MM THK BTW KM0.00-KM10.00 ON TIDANG-BIDANG-JOLINGKONG RD
SURFACING FOR WMM150MM WMM100MM DBM50MM BC30MM PRIME COAT WITH BITUMEN EMULSION TACK COAT WITH BITUMEN VG-10 PROV SAND BLANKETING OF 25 MM THK LAYING ILCB SIZE 200X100X80 BTWN KM133.078-149.150 ON RD KALIMANDIR-LIPULEKH IN AoR OF HIRAK IN UTTARAKHAND
RENOVATION OF 10 NOS TOILET BLOCKS IN ORS LIVING ACCN IN OTM COMPLEX OF HQ DGBR NEW DELHI10 IN THE AREA OF 1353GE 21 BRTF UNDER PROJECT SHIVALIK IN NEW DELHI
DESIGN AND CONSTRUCTION OF 400.00 M MAJOR PMT BRIDGE OVER TDR NALLAH AT KM 5.60 ON ROAD POONCH RAWALKOTE ALONGWITH ITS APPROACHES INCLUDING LA FC SHIFTING OF UTILITIES UNDER 79 RCC 31 BRTF UNDER PROJECT SAMPARK IN J K (UT)
DESIGN A CONSTRCTN OF 300 M S MAJOR PSC BALANCED CANTILEVER BR AT KM 105.0 (TAWI BR) ALONG WITH ITS APPROACHES, COLLECTION OF HYDRAULIC DATA, SSI, PROOF CHECKING, FORMULATION OF TENTATIVE BR SCHEME ON D-U RD (P) SPK IN JK (UT) EPC (3rd Call)
PL WMM 75mm thk (2 layer), 75mm thk DBM and 40mm thk BC incl cleaning of rd surf, applying prime coat over WMM surf with bitumen emulsion and applying tack coat for BC with bitumen emulsion btwn Km 49.5 and Km 67.4 on Likaru-Mig La-Fukche road
AND FIXING OF CAT EYES BTWN KM 33.262 TO KM 48.760 AND KM 49.500 TO KM 55.900 ON ROAD LEH-LOMA FOR RESURFACING WKS 2026-27
PL and compaction of 75mm thk (double layer) WMM, 75mm thk DBM and 40mm thk BC, applying prime coat over WMM surf and applying tack coat for BC and road marking with thermoplastic paint for surf wks btwn Km 21.68 to Km 29.954 on rd Tangste to Kela So
DESIGN AND CONSTRUCTION OF 65 MTR SPAN MAJOR PMT BRIDGE WITH STEEL SUPERSTRUCTURE THROUGH TYPE OPEN FOUNDATION AT KM 2.10 ON TIDANG-BIDANG ROAD UNDER 67 RCC/765 BRTF/CE (P) HIRAK IN UTTARAKHAND STATE ON EPC MODE
PL BC30 MM THK INCL CORRN WRK WITH DBM50MM THK ND APPLY TC FOR RESURF ON EXIST SURF BERM FILNG THERMOPLASTIC PNT FOR RD MARKING FIXINGOF CATEYES ND DELINEATORS BET KM 8.00 TO KM 16.882 ON RD SASER-BRANGSA-MURGO FOR RESURF WKS UDR 113RCC/50TF/HMK
PL BC30 MM THK INCL CORRN WRK WITH DBM50MM THK ND APPLY TC FOR RESURF ON EXIST SURF BERM FILNG THERMOPLASTIC PNT FOR RD MARKING FIXINGOF CATEYES ND DELINEATORS BET KM 0.00 TO KM 21.375 ON RD DUNGTI-HENA-PP FOR RESURF WKS UNDER 112RCC/755TF PROJ HMK
SPECIAL REPAIR OF PORTA CABIN AT PCDA 3rd FLOOR OF HQ DGBR OFFICE COMPEX SEEMA SADAK BHAWAN RING ROAD DELHI CANTT NEW DELHI10
PROVIDING LAYING SPREADING COMPACTION OF 30 MM THICK BITUMINOUS CONCRETE BETWEEN KM 62.769 TO KM 69.663 ON ROAD PITHORAGARH-TAWAGHAT (PART-I) AND BETWEEN KM 33.000 TO KM 65.507 ON ROAD JAULJIBI-MUNSIYARI FOR RESURFACING WORKS UNDER PROJECT HIRAK
PROV AND LAYING OF 30 MM THK BC LAYER ON RD BTWN KM42.00-KM62.00 AT DIFF STRETCHES ON RD PITHORAGARH-TAWAGHAT AND TACK COAT WITH BT EMULSION ON SURFACE FOR RESURF WKS INCL CORRECTION WORK WITH LAYING OF 30 MM THK BC AND TACK COAT WITH BT EMULSION
ON ROAD UPSHI-SARCHU FOR RESURF WKS 2026-27
Widening and impvt of rd infra btwn Km 344 to Km 443 of NH-03 (Taking Manali as 0) excldg Km 361 to Km 372 and Km 403 to Km 414 in the length of 77 Km for transportation of heavy equipment and machinery of PGCIL transmission system at Pang
DESIGN AND CONSTRUCTION OF 40 MTR SPAN STEEL SUPERSTRUCTURE MAJOR PMT BRIDGE OVER KHET NALLAH AT KM 7.30 ON TAWAGHAT-SOBLA ROAD ON DEPARTMENTALLY CONSTRUCTED SUBSTRUCTURE IN, PROJECT HIRAK IN UTTARAKHAND STATE
SS OF CRUSD S/AGG OF V/SIZ AND C/SND AT KM 10.20 (HMP SITE) ON T GEN AREA PT 4685 RD FOR RESURF WKS FY 26 27 ON T GEN AREA PT 4685 RD KM 3.20 TO 10.50 AND CNT RD KM 0.00 TO 11.647 FOR BC 40 MM (INCLD CORRN WKS DBM 50 MM) UNDR 129 RCC/764TF/(P)SWTK/
PROVIDING AND LAYING OF GSB 15 CM AND 10 CM THICK COMPACTED, WMM 100 MM THICK, WMM 75 MM THICK IN 2 LAYERS, DBM 60 MM THICK AND BC 30 MM THICK ALL COMPACTED WITH HMP AND WMM MIX, LAYING WITH PAVER FINISHER AND ROLLING TO SPECIFIED COMPACTED THICKNES
SUPPLY AND STACKING OF COARSE SAND FOR SAND BLANKETING, CRUSHED STONE AGGREGATES OF VARIOUS SIZES AND STONE DUST/SAND FOR CRUSHED STONE BASE LAYER BETWEEN KM 0.00 TO KM 7.500 ON ROAD KATAO Y JUNCTION MUKTI SPUR AREA TEMPLE SMUGGLER GAP AND STONE CHI
SUPPLY AND STACKING OF COARSE SAND FOR SAND BLANKETING BETWEEN KM 25.50 TO KM 35.10 ON DOMBANG PIMPLA ROAD AND STONE AGGREGATES OF VARIOUS SIZES AND STONE DUST AT KM 9.00 ON L Z K ROAD (HMP SITE) FOR DBM AND BC WORKS FROM KM 25.50 TO KM 35.10 ON DOMB
SUPPLY AND STACKING OF COARSE SAND FOR SAND BLANKETING, CRUSHED STONE AGGREGATES OF VARIOUS SIZES AND STONE DUST FOR CSB LAYER BETWEEN KM 0.00 TO KM 8.500 ON DOMBANG PIMPLA ROAD AND STONE AGGREGATES OF VARIOUS SIZES AND STONE DUST/SAND AT KM 9.00 ON
MAINTENANCE WORK FROM KM 68.300 TO KM 87.00 GWALDAM BAIJANTH ON NH109K UNDER SPECIAL REPAIR 2025 26
SUPPLY AND STACKING OF DIFFERENT SIZE AGGREGATES AND SAND AT HMP LOCATION AT KM 153 ON BALIPARA CHARDUAR TAWANG ROAD UNDER 97 RCC
DESIGN AND CONSTRUCTION OF 50 MTR SPAN MAJOR PERMANENT BRIDGE WITH STEEL SUPER STRUCTURE (THROUGH TYPE) WITH OPEN FOUNDATION, FOOT PATH AND SERVICE DUCT AT KM 138.025 ON ROAD KALIMANDIR-LIPULEKH PASS IN THE AoR OF CE (P) HIRAK IN UTTARAKHAND STATE
PROVIDING, LAYING, BM 50 MM, BC 40 MM THICK (HMP MIX), APPLYING TACK COAT, ROAD MARKING, ROAD STUD AND BERM FILLING ALL AS PER MORTH SPECIFICATIONS BETWEEN KM 0.000 TO 7.530 ON DINJAN PANITOLA ROAD OF 1444 BCC UNDER 48 BRTF/PROJECT UDAYAK IN ASSAM