Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H-1₹3.6 CrAccepted-AOC 115 116 GANESH NAGAR HOSHANGABAD ROAD BHOPAL M P 462026 IN | BHOPAL | BHOPAL | MADHYA PRADESH | 462026 | ₹3.6 Cr | H-1 | Accepted-AOC Rates are reasonable and lower side |
| 2 | H-2₹4.1 Cr+₹45.6 L (12.5%)Rejected-Finance LION TOWER PLOT NO 97 ELEGANT ESTATE BAIRAGARH CHICHLI KOLAR ROAD BHOPAL M P | BHOPAL | MADHYA PRADESH | ₹4.1 Cr+₹45.6 L (12.5%) | H-2 | Rejected-Finance Rates quoted are higher side |
| 3 | H-3₹4.4 Cr+₹73.1 L (20.1%)Rejected-Finance | ₹4.4 Cr+₹73.1 L (20.1%) | H-3 | Rejected-Finance Rates quoted are higher side |
| 4 | H-4₹4.2 Cr+₹51.9 L (14.3%)Rejected-Finance F 33 3 OKHLA INDUSTRIAL AREA PHASE 2 DELHI 110020 | SOUTH | DELHI | 110020 | ₹4.2 Cr+₹51.9 L (14.3%) | H-4 | Rejected-Finance Rates quoted are higher side |
| 5 | H-5₹4.5 Cr+₹85.1 L (23.4%)Rejected-Finance | ₹4.5 Cr+₹85.1 L (23.4%) | H-5 | Rejected-Finance Rates quoted are higher side |
| Sl No | Description | Qty | Unit | Ayoleeza Consultants Pvt Ltd L6 | Almondz Global Infra Consultant Limited L3 | Lion Engineering Consultants Private Limited L2 | M/s Manglam Infra and Engineering Limited L1 | Indian Technocrat Limited L4 | Holtec Consulting Private Limited L5 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00CONSULTANCY SERVICE FOR ENGAGEMENT OF CONSULTANT FOR CARRYING OUT FEASIBILITY STUDY AND PREPARATION OF DPR UNDER 68 RCC / 759 BRTF UNDER PROJECT DEEPAK IN HIMACHAL PRADESH | |||||||||
| 1.01 | FOR CONSTRUCTION OF ROAD NEW TO NHSL ON CHARANG-KHIMOKUL FROM KM 0.00 TO KM 30.000 (NET LENGTH 30.000 KM) | 30 | KM | 3,57,145 ₹1,07,14,350 | 3,30,000 ₹99,00,000 | 3,25,000 ₹97,50,000 | 2,88,777 ₹86,63,310 Lowest | 3,48,100 ₹1,04,43,000 | 4,00,000 ₹1,20,00,000 |
| 1.02 | FOR CONSTRUCTION OF ROAD NEW TO NHSL ON KOTA-DOGRI-SHIMDONG FROM KM 0.00 TO KM 23.000 (NET LENGTH 23.000 KM) | 23 | KM | 3,57,145 ₹82,14,335 | 3,30,000 ₹75,90,000 | 3,25,000 ₹74,75,000 | 2,88,777 ₹66,41,871 Lowest | 3,59,900 ₹82,77,700 | 4,00,000 ₹92,00,000 |
| 1.03 | FOR CONSTRUCTION OF ROAD NEW TO NHSL ON NITHAL-TACH-NAKDUM FROM KM 0.00 TO KM 9.000 (NET LENGTH 9.000 KM) | 9 | KM | 3,57,145 ₹32,14,305 | 3,30,000 ₹29,70,000 | 3,25,000 ₹29,25,000 | 2,88,777 ₹25,98,993 Lowest | 3,83,500 ₹34,51,500 | 5,00,000 ₹45,00,000 |
| 1.04 | FOR CONSTRUCTION OF ROAD NEW TO NHSL ON RISHI-DOGRI-GANTHAM-BALAM FROM KM 0.00 TO KM 64.000 (NET LENGTH 64.000 KM) | 64 | KM | 3,57,141 ₹2,28,57,024 | 3,30,000 ₹2,11,20,000 | 3,25,000 ₹2,08,00,000 | 2,88,777 ₹1,84,81,728 Lowest | 3,36,300 ₹2,15,23,200 | 3,00,000 ₹1,92,00,000 |
Tender Value
₹5.1 Cr
EMD Value
₹5.8 L
Closing Date
17 Mar 2025, 4:00 pmClosed
CHIEF ENGINEER PROJECT DEEPAK
HQ CE PROJECT DEEPAK, CHAKKAR BARRIER, HARI NAGAR, SHIMLA
Consultancy Service for carrying out Feasibility Study and Preparation of DPR for Constr of Rd New to NHSL on C K Rd fm Km 0 To 30 comma R D G B Rd fm Km 0 to 64 comma K D S Rd fm Km 0 to 23 and N T N Rd fm Km 0 to 9 under 68 RCC 759 TF PJT Dpk HP
2025_BRO_692855_1
CE (P) DPK-10/2024-25
Open Tender
Civil Works
Item Wise
450 days
C-K Rd R-D-G-B Rd K-D-S Rd N-T-N Rd
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹5.8 L
Yes
SHIMLA
29 Apr 2026
11 Jan 2025
18 Mar 2025
11 Jan 2025
17 Mar 2025
11 Feb 2025
11 Jan 2025 - 20 Jan 2025
16 Jan 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1CONSULTANCY SERVICE FOR ENGAGEMENT OF CONSULTANT FOR CARRYING OUT FEASIBILITY STUDY AND PREPARATION OF DPR UNDER 68 RCC / 759 BRTF UNDER PROJECT DEEPAK IN HIMACHAL PRADESH | |||||
| 1.01 | FOR CONSTRUCTION OF ROAD NEW TO NHSL ON CHARANG-KHIMOKUL FROM KM 0.00 TO KM 30.000 (NET LENGTH 30.000 KM) | - | KM | - | - |
| 1.02 | FOR CONSTRUCTION OF ROAD NEW TO NHSL ON KOTA-DOGRI-SHIMDONG FROM KM 0.00 TO KM 23.000 (NET LENGTH 23.000 KM) | - | KM | - | - |
| 1.03 | FOR CONSTRUCTION OF ROAD NEW TO NHSL ON NITHAL-TACH-NAKDUM FROM KM 0.00 TO KM 9.000 (NET LENGTH 9.000 KM) | - | KM | - | - |
| 1.04 | FOR CONSTRUCTION OF ROAD NEW TO NHSL ON RISHI-DOGRI-GANTHAM-BALAM FROM KM 0.00 TO KM 64.000 (NET LENGTH 64.000 KM) | - | KM | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.27 MB
Integritypact.pdf
Tender Documents • 0.38 MB
RFP.pdf
Tender Documents • 5.68 MB
BOQ_775669.xls
BOQ • 0.30 MB
OTHERDETAILS.pdf
Additional Documents • 0.10 MB
Tenderdocument.pdf
Tender Documents • 5.68 MB
Tenderdocument_2.pdf
Tender Documents • 0.38 MB
Tenderdocument_3.pdf
Tender Documents • 0.10 MB
BOQ.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .