| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.6 CrAccepted-AOC ZONGREN HOUSE NEAR TASHILING SECRETARIAT BHANU PATH GANGTOK EAST SIKKIM SIKKIM | GANGTOK | EAST SIKKIM | SIKKIM | 737101 | ₹11.6 Cr | L1 | Accepted-AOC Accepted being L1 |
| 2 | L2₹22.1 Cr+₹10.5 Cr (90.7%)Rejected-Finance | ₹22.1 Cr+₹10.5 Cr (90.7%) | L2 | Rejected-Finance Rejected being L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Technically non responsive |
| 4 | Rejected-Technical E SECTOR PO PS ITANAGAR DISTT PAPUMPARE ARUNACHAL PRADESH 791111 | ITANAGAR | PAPUMPARE | ARUNACHAL PRADESH | 791111 | - | - | Rejected-Technical Technically non responsive |
| 5 | Rejected-Technical LOWER SICHEY NEAR FOREST CHECK POST GANGTOK 737101 EAST SIKKIM | GANGTOK | EAST SIKKIM | SIKKIM | 737101 | - | - | Rejected-Technical Technically non responsive |
| Sl No | Description | Qty | Unit | ORGANIC SIKKIM H2 | Epicon constructions private limited H1 |
|---|---|---|---|---|---|
| 1.00 | Preparation of sub-grade in SMB as per MORT&H specifications all as specified | 42,363.8 | Sqm | 45 ₹19,06,371 Lowest | 160 ₹67,78,208 |
| 2.00 | Scarifying of existing BT surface all as specified | 4,980 | Sqm | 50 ₹2,49,000 Lowest | 80 ₹3,98,400 |
| 3.00 | Providing and laying of GSB 15 cm thick (compacted) as per MORT&H specifications all as specified | 9,986.14 | Sqm | 200 ₹19,97,228 Lowest | 840 ₹83,88,357.6 |
| 4.00 | Providing and laying of GSB 10 cm thick (compacted ) as per MORT&H specifications all as specified | 83,539.6 | Sqm | 150 ₹1,25,30,940 Lowest | 560 ₹4,67,82,176 |
| 5.00 | Providing and laying of Wet Mix Macadam 100 mm thick compacted as per MORT&H specifications all as specified. | 35,441.18 | Sqm | 350 ₹1,24,04,413 Lowest | 560 ₹1,98,47,060.8 |
| 6.00 | Providing and laying of Wet Mix Macadam 75 mm thick compacted in two layers as per MORT&H specifications all as specified. | 70,882.26 | Sqm | 300 ₹2,12,64,678 Lowest | 420 ₹2,97,70,549.2 |
| 7.00 | Providing and applying Prime Coat as per MoRT&H specifications all as specified | 35,441.18 | Sqm | 50 ₹17,72,059 Lowest | 60 ₹21,26,470.8 |
| 8.00 | Providing and laying of Dense Bituminous Macadam 60 mm thick compacted with HMP using crushed aggregates of specified grading, premixed with bituminous binder VG 10 @ 4.5 % (min) by weight of total mix all as specified. | 34,118.6 | Sqm | 850 ₹2,90,00,810 Lowest | 1,600 ₹5,45,89,760 |
| 9.00 | Providing and applying tack coat as per MoRT&H specifications all as specified | 75,972.88 | Sqm | 50 ₹37,98,644 | 30 ₹22,79,186.4 Lowest |
| 10.00 | Providing and laying Bituminous Concrete layer 30 mm thick Compacted with HMP using crushed aggregates of specified grading, mixed with bituminous binder VG-10 Grade @ 5.4% (min) by weight of total mix all as specified | 34,118.6 | Sqm | 900 ₹3,07,06,740 Lowest | 1,400 ₹4,77,66,040 |
Tender Value
₹10.2 Cr
EMD Value
₹8.3 L
Closing Date
27 Jan 2026, 12:00 pmClosed
Chief Engineer Project Swastik
HQ Chief Engineer Project Swastik, C/o 99 APO, Gangtok , PIN 737101
PROVIDING AND LAYING OF GSB 15 CM AND 10 CM THICK COMPACTED, WMM 100 MM THICK, WMM 75 MM THICK IN 2 LAYERS, DBM 60 MM THICK AND BC 30 MM THICK ALL COMPACTED WITH HMP AND WMM MIX, LAYING WITH PAVER FINISHER AND ROLLING TO SPECIFIED COMPACTED THICKNES
2025_BRO_746489_1
80608
Open Tender
Civil Works - Roads
Item Rate
365 days
BTW KM 45.79 TO KM 55.44 ON RRK ROAD
As per tender documents
8 documents required · 8 mandatory
₹0
₹8.3 L
Yes
O/O Chief Engineer Project Swastik C/o 99 APO Pin
6 Apr 2026
29 Dec 2025
2 Feb 2026
29 Dec 2025
27 Jan 2026
6 Jan 2026
30 Dec 2025 - 3 Jan 2026
5 Jan 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Preparation of sub-grade in SMB as per MORT&H specifications all as specified | 42,363.8 | Sqm | 100 | ₹42,36,380 |
| 2 | Scarifying of existing BT surface all as specified | 4,980 | Sqm | 100 | ₹4,98,000 |
| 3 | Providing and laying of GSB 15 cm thick (compacted) as per MORT&H specifications all as specified | 9,986.14 | Sqm | 100 | ₹9,98,614 |
| 4 | Providing and laying of GSB 10 cm thick (compacted ) as per MORT&H specifications all as specified | 83,539.6 | Sqm | 100 | ₹83,53,960 |
| 5 | Providing and laying of Wet Mix Macadam 100 mm thick compacted as per MORT&H specifications all as specified. | 35,441.18 | Sqm | 100 | ₹35,44,118 |
| 6 | Providing and laying of Wet Mix Macadam 75 mm thick compacted in two layers as per MORT&H specifications all as specified. | 70,882.26 | Sqm | 100 | ₹70,88,226 |
| 7 | Providing and applying Prime Coat as per MoRT&H specifications all as specified | 35,441.18 | Sqm | 100 | ₹35,44,118 |
| 8 | Providing and laying of Dense Bituminous Macadam 60 mm thick compacted with HMP using crushed aggregates of specified grading, premixed with bituminous binder VG 10 @ 4.5 % (min) by weight of total mix all as specified. | 34,118.6 | Sqm | 100 | ₹34,11,860 |
| 9 | Providing and applying tack coat as per MoRT&H specifications all as specified | 75,972.88 | Sqm | 100 | ₹75,97,288 |
| 10 | Providing and laying Bituminous Concrete layer 30 mm thick Compacted with HMP using crushed aggregates of specified grading, mixed with bituminous binder VG-10 Grade @ 5.4% (min) by weight of total mix all as specified | 34,118.6 | Sqm | 100 | ₹34,11,860 |
stage.html
html • 0.05 MB
technical_835896.pdf
techsummary_835896.pdf
finance_835896.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
BOQ_835896.xls
BOQ • 0.35 MB
tender.pdf
Tender Documents • 1.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .