Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.9 CrAdmitted-Finance | ₹26.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹31.3 CrAdmitted-Finance | ₹31.3 Cr | L2 | Admitted-Finance |
| 3 | L3₹32.4 CrAdmitted-Finance | ₹32.4 Cr | L3 | Admitted-Finance |
| 4 | L4₹37.3 CrAdmitted-Finance | ₹37.3 Cr | L4 | Admitted-Finance |
| 5 | Rejected-Technical | - | - | Rejected-Technical Technically Non Responsive. Site visit certificate issued by OC 69 RCC as per Clause 2.5 of RFP not found enclosed. |
| Sl No | Description | Qty | Unit | TRB Infratech Pvt Ltd L4 | A.K. ENGINEERS & CONTRACTORS PVT. LTD. L1 | V.K Gupta & Associates L2 | Ms Poddar Infratech Private Limited L3 |
|---|---|---|---|---|---|---|---|
| 1.00“DESIGN AND CONSTRUCTION OF 300.00 MTR (75+150+75) SPAN MAJOR PSC BALANCED CANTILEVER BRIDGE AT KM 105.00 (TAWI BRIDGE) ALONG WITH ITS APPROACHES, COLLECTION OF HYDRAULIC DATA, SUB SOIL INVESTIGATION, PROOF CHECKING, FORMULATION OF TENTATIVE BR SCHEME ON DHAR UDHAMPUR ROAD UNDER 69 RCC/35 BRTF PROJECT SAMPARK IN J&K (UT) THROUGH EPC MODE (3RD CALL)" | |||||||
| 1.01 | “DESIGN AND CONSTRUCTION OF 300.00 MTR (75+150+75) SPAN MAJOR PSC BALANCED CANTILEVER BRIDGE AT KM 105.00 (TAWI BRIDGE) ALONG WITH ITS APPROACHES, COLLECTION OF HYDRAULIC DATA, SUB SOIL INVESTIGATION, PROOF CHECKING, FORMULATION OF TENTATIVE BR SCHEME ON DHAR UDHAMPUR ROAD UNDER 69 RCC/35 BRTF PROJECT SAMPARK IN J&K (UT) THROUGH EPC MODE (3RD CALL)" | 1 | Lumpsum | 37,25,65,025 ₹37.3 Cr | 26,95,00,000 ₹26.9 Cr | 31,27,00,000 ₹31.3 Cr | 32,40,00,000 ₹32.4 Cr |
Tender Value
₹46.4 Cr
EMD Value
₹46.4 L
Closing Date
2 Apr 2026, 12:00 pmClosed
Chief Engineer Project Sampark
HQ Chief Engineer Project Sampark Kunjwani Chowk Jammu
DESIGN A CONSTRCTN OF 300 M S MAJOR PSC BALANCED CANTILEVER BR AT KM 105.0 (TAWI BR) ALONG WITH ITS APPROACHES, COLLECTION OF HYDRAULIC DATA, SSI, PROOF CHECKING, FORMULATION OF TENTATIVE BR SCHEME ON D-U RD (P) SPK IN JK (UT) EPC (3rd Call)
2026_BRO_755892_1
CE (P) SPK/EPC/12/2025-26
Open Tender
Civil Works
900 days
At Km 105.00 Tawi Br D-U Rd
As per Tender Doc
5 documents required · 5 mandatory
₹11,800
Chief Engineer Project Sampark
₹46.4 L
HQ Chief Engineer Project Sampark Kunjwani Chowk J
24 Apr 2026
11 Mar 2026
4 Apr 2026
11 Mar 2026
2 Apr 2026
17 Mar 2026
12 Mar 2026 - 15 Mar 2026
16 Mar 2026
“DESIGN AND CONSTRUCTION OF 300.00 MTR (75+150+75) SPAN MAJOR PSC BALANCED CANTILEVER BRIDGE AT KM 105.00 (TAWI BRIDGE) ALONG WITH ITS APPROACHES, COLLECTION OF HYDRAULIC DATA, SUB SOIL INVESTIGATION, PROOF CHECKING, FORMULATION OF TENTATIVE BR SCHEME ON DHAR UDHAMPUR ROAD UNDER 69 RCC/35 BRTF PROJECT SAMPARK IN J&K (UT) THROUGH EPC MODE (3RD CALL)"
“DESIGN AND CONSTRUCTION OF 300.00 MTR (75+150+75) SPAN MAJOR PSC BALANCED CANTILEVER BRIDGE AT KM 105.00 (TAWI BRIDGE) ALONG WITH ITS APPROACHES, COLLECTION OF HYDRAULIC DATA, SUB SOIL INVESTIGATION, PROOF CHECKING, FORMULATION OF TENTATIVE BR SCHEME ON DHAR UDHAMPUR ROAD UNDER 69 RCC/35 BRTF PROJECT SAMPARK IN J&K (UT) THROUGH EPC MODE (3RD CALL)"
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
DCA.pdf
Tender Documents • 1.33 MB
RFP.pdf
Tender Documents • 1.58 MB
NIT.pdf
Tender Documents • 0.40 MB
BOQ_846672.xls
BOQ • 0.31 MB
Schedules.pdf
Tender Documents • 5.30 MB
Download all tender documents and submit your bid