Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹37.5 CrAccepted-AOC 366 GIANI ZAIL SINGH NAGAR ROPAR PB 140001 | ROPAR | ROPAR | PUNJAB | 140001 | ₹37.5 Cr | L-1 | Accepted-AOC Rates quoted are reasonable |
| 2 | L-2₹39.2 CrRejected-Finance | ₹39.2 Cr | L-2 | Rejected-Finance Rates quoted are higher side |
| 3 | Rejected-Technical | - | - | Rejected-Technical as per TBOO |
| Sl No | Description | Qty | Unit | GARG & GARG CO L1 | LSR INFRACON PVT LTD L2 |
|---|---|---|---|---|---|
| 1.00MANALI-SARCHU ROAD Altitude Between (Below 2100 Mtr) | |||||
| 1.01 | Providing, laying and compaction of DBM 75 mm thick (compacted) including tack coat with minimum 4.5% Bitumen (VG-10) content to total mix conforming to MORT&H specifications for Road and Bridge works (Fifth revision) and as specified in particular specification. | 1,162.58 | Sqm | 1,215 ₹14.1 L | 1,250 ₹14.5 L |
| 1.02 | Providing, laying and compaction of BC 40 mm thick (Compacted) including tack coat over finished Bituminous surface with minimum 5.4% Bitumen (VG-10) content to total weight of mix conforming to MORT&H specifications for Road and Bridge works (Fifth revision) and as specified in particular specification. | 18,384 | Sqm | 894 ₹1.6 Cr | 925 ₹1.7 Cr |
| 1.03 | Providing and laying of Road marking with thermoplastic paint 2.5 mm thick conforming to MORT&H specifications for Road and Bridge works (Fifth revision) and as specified in particular specification and as directed by Engineer in Charge. | 469.3 | Sqm | 555 ₹2.6 L | 491 ₹2.3 L |
| 1.04 | Earthwork in embankment up to 1.5 mtr height in hill road (Berm Filling) | 912 | Cum | 1,100 ₹10.0 L | 950 ₹8.7 L |
| 2.00ALTITUDE BET (2101-2400) MTR | |||||
| 2.01 | Providing, laying and compaction of DBM 75 mm thick (compacted) including tack coat with minimum 4.5% Bitumen (VG-10) content to total mix conforming to MORT&H specifications for Road and Bridge works (Fifth revision) and as specified in particular specification. | 1,853.27 | Sqm | 1,215 ₹22.5 L | 1,255 ₹23.3 L |
| 2.02 | Providing, laying and compaction of BC 40 mm thick (Compacted) including tack coat over finished Bituminous surface with minimum 5.4% Bitumen (VG-10) content to total weight of mix conforming to MORT&H specifications for Road and Bridge works (Fifth revision) and as specified in particular specification. | 29,170.5 | Sqm | 894 ₹2.6 Cr | 930 ₹2.7 Cr |
| 2.03 | Providing and laying of Road marking with thermoplastic paint 2.5 mm thick conforming to MORT&H specifications for Road and Bridge works (Fifth revision) and as specified in particular specification and as directed by Engineer in Charge. | 771.65 | Sqm | 555 ₹4.3 L | 529 ₹4.1 L |
| 2.04 | Earthwork in embankment up to 1.5 mtr height in hill road (Berm Filling) | 1,499.52 | Cum | 1,100 ₹16.5 L | 1,000 ₹15.0 L |
Tender Value
₹33.8 Cr
EMD Value
₹15 L
Closing Date
10 Feb 2026, 4:00 pmClosed
CHIEF ENGINEER PROJECT DEEPAK
HQ CE PROJECT DEEPAK, HARI Nager, CHAKKER BARRIER, SHIMLA HP
P L AND COMPACTION OF 75 MM THICK DBM FOR CORRECTION WK INCL TACK COAT AND 40 MM THICK BC INCLTACK COAT AND CLEAN OF RD SURF RD MARK ALL AS PER PART SPECI FROM BW KM 0 PT 400 TO KM 197PT405 ON MS RD UNDER 70 RCC 38 BRTF RD SECTOR OF PROJECT DPK
2026_BRO_747703_1
CE (P) DPK-18 of 2025-26
Open Tender
Civil Works
180 days
Manali Sarchu Road
As per tender document
9 documents required · 9 mandatory
₹0
₹15 L
Yes
SHIMLA
27 Apr 2026
9 Jan 2026
11 Feb 2026
9 Jan 2026
10 Feb 2026
23 Jan 2026
9 Jan 2026 - 20 Jan 2026
13 Jan 2026
MANALI-SARCHU ROAD Altitude Between (Below 2100 Mtr)
Providing, laying and compaction of DBM 75 mm thick (compacted) including tack coat with minimum 4.5% Bitumen (VG-10) content to total mix conforming to MORT&H specifications for Road and Bridge works (Fifth revision) and as specified in particular specification.
Providing, laying and compaction of BC 40 mm thick (Compacted) including tack coat over finished Bituminous surface with minimum 5.4% Bitumen (VG-10) content to total weight of mix conforming to MORT&H specifications for Road and Bridge works (Fifth revision) and as specified in particular specification.
Providing and laying of Road marking with thermoplastic paint 2.5 mm thick conforming to MORT&H specifications for Road and Bridge works (Fifth revision) and as specified in particular specification and as directed by Engineer in Charge.
Earthwork in embankment up to 1.5 mtr height in hill road (Berm Filling)
ALTITUDE BET (2101-2400) MTR
Providing, laying and compaction of DBM 75 mm thick (compacted) including tack coat with minimum 4.5% Bitumen (VG-10) content to total mix conforming to MORT&H specifications for Road and Bridge works (Fifth revision) and as specified in particular specification.
Providing, laying and compaction of BC 40 mm thick (Compacted) including tack coat over finished Bituminous surface with minimum 5.4% Bitumen (VG-10) content to total weight of mix conforming to MORT&H specifications for Road and Bridge works (Fifth revision) and as specified in particular specification.
Providing and laying of Road marking with thermoplastic paint 2.5 mm thick conforming to MORT&H specifications for Road and Bridge works (Fifth revision) and as specified in particular specification and as directed by Engineer in Charge.
Earthwork in embankment up to 1.5 mtr height in hill road (Berm Filling)
ALTITUDE ( 3001-3300) MTR
Providing, laying and compaction of DBM 75 mm thick (compacted) including tack coat with minimum 4.5% Bitumen (VG-10) content to total mix conforming to MORT&H specifications for Road and Bridge works (Fifth revision) and as specified in particular specification.
Providing, laying and compaction of BC 40 mm thick (Compacted) including tack coat over finished Bituminous surface with minimum 5.4% Bitumen (VG-10) content to total weight of mix conforming to MORT&H specifications for Road and Bridge works (Fifth revision) and as specified in particular specification.
Providing and laying of Road marking with thermoplastic paint 2.5 mm thick conforming to MORT&H specifications for Road and Bridge works (Fifth revision) and as specified in particular specification and as directed by Engineer in Charge.
Earthwork in embankment up to 1.5 mtr height in hill road (Berm Filling)
Altitude ( 3301-3600) Mtr
Providing, laying and compaction of DBM 75 mm thick (compacted) including tack coat with minimum 4.5% Bitumen (VG-10) content to total mix conforming to MORT&H specifications for Road and Bridge works (Fifth revision) and as specified in particular specification.
Providing, laying and compaction of BC 40 mm thick (Compacted) including tack coat over finished Bituminous surface with minimum 5.4% Bitumen (VG-10) content to total weight of mix conforming to MORT&H specifications for Road and Bridge works (Fifth revision) and as specified in particular specification.
Providing and laying of Road marking with thermoplastic paint 2.5 mm thick conforming to MORT&H specifications for Road and Bridge works (Fifth revision) and as specified in particular specification and as directed by Engineer in Charge.
Earthwork in embankment up to 1.5 mtr height in hill road (Berm Filling)
Altitude (3601-3900) Mtr
Providing, laying and compaction of DBM 75 mm thick (compacted) including tack coat with minimum 4.5% Bitumen (VG-10) content to total mix conforming to MORT&H specifications for Road and Bridge works (Fifth revision) and as specified in particular specification.
Providing, laying and compaction of BC 40 mm thick (Compacted) including tack coat over finished Bituminous surface with minimum 5.4% Bitumen (VG-10) content to total weight of mix conforming to MORT&H specifications for Road and Bridge works (Fifth revision) and as specified in particular specification.
Providing and laying of Road marking with thermoplastic paint 2.5 mm thick conforming to MORT&H specifications for Road and Bridge works (Fifth revision) and as specified in particular specification and as directed by Engineer in Charge.
Earthwork in embankment up to 1.5 mtr height in hill road (Berm Filling)
Altitude (3901-4200) Mtr
Providing, laying and compaction of DBM 75 mm thick (compacted) including tack coat with minimum 4.5% Bitumen (VG-10) content to total mix conforming to MORT&H specifications for Road and Bridge works (Fifth revision) and as specified in particular specification.
Providing, laying and compaction of BC 40 mm thick (Compacted) including tack coat over finished Bituminous surface with minimum 5.4% Bitumen (VG-10) content to total weight of mix conforming to MORT&H specifications for Road and Bridge works (Fifth revision) and as specified in particular specification.
Providing and laying of Road marking with thermoplastic paint 2.5 mm thick conforming to MORT&H specifications for Road and Bridge works (Fifth revision) and as specified in particular specification and as directed by Engineer in Charge.
Earthwork in embankment up to 1.5 mtr height in hill road (Berm Filling)
Altitude (4501-4800) Mtr
Providing, laying and compaction of DBM 75 mm thick (compacted) including tack coat with minimum 4.5% Bitumen (VG-10) content to total mix conforming to MORT&H specifications for Road and Bridge works (Fifth revision) and as specified in particular specification.
Providing, laying and compaction of BC 40 mm thick (Compacted) including tack coat over finished Bituminous surface with minimum 5.4% Bitumen (VG-10) content to total weight of mix conforming to MORT&H specifications for Road and Bridge works (Fifth revision) and as specified in particular specification.
Providing and laying of Road marking with thermoplastic paint 2.5 mm thick conforming to MORT&H specifications for Road and Bridge works (Fifth revision) and as specified in particular specification and as directed by Engineer in Charge.
Earthwork in embankment up to 1.5 mtr height in hill road (Berm Filling)
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.39 MB
Tendernotice_2.pdf
PDF • 0.33 MB
TBID.pdf
Tender Documents • 0.89 MB
QBID.pdf
Tender Documents • 0.63 MB
OTHERDETAILS.pdf
Additional Documents • 0.10 MB
BOQ_837321.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid