Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹120.3 CrAccepted-AOC | ₹120.3 Cr | L1 | Accepted-AOC L1 Bidder |
| 2 | L2₹120.4 Cr+₹10.5 L (0.09%)Rejected-Finance | ₹120.4 Cr+₹10.5 L (0.09%) | L2 | Rejected-Finance Rejected |
| 3 | L3₹131.3 Cr+₹11.0 Cr (9.12%)Rejected-Finance GP KIZHAKKAMBALAM KOLENCHERY | THRISSUR | KERALA | 680667 | ₹131.3 Cr+₹11.0 Cr (9.12%) | L3 | Rejected-Finance Rejected |
| 4 | L4₹141.9 Cr+₹21.6 Cr (17.9%)Rejected-Finance | ₹141.9 Cr+₹21.6 Cr (17.9%) | L4 | Rejected-Finance Rejected |
| 5 | L5₹141.9 Cr+₹21.6 Cr (17.9%)Rejected-Finance H NO 66 SECTOR 27A CHANDIGARH 160019 | CHANDIGARH | CHANDIGARH | 160019 | ₹141.9 Cr+₹21.6 Cr (17.9%) | L5 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | RK Infracorp Private Limited L4 | M/s DMR Builders Pvt Ltd L10 | SRM CONTRACTORS LIMITED L9 | VIJAY CONSTRUCTIONS L3 | Ganpati Bharat Private Limited L8 | VIVEK ENTERPRISE L1 | DHORAJIA CONSTRUCTIONS PVT LTD L6 | RAJINDER INFRASTRUCTURE PVT LTD L5 | KRC INFRAPROJECTS PVT LTD L7 | M/s APS Hydro Pvt. Ltd. L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | CONSTRUCTION OF NEW ROAD NELYA – DHAULA (PACKAGE – II) TO NHSL SPECIFICATIONS FROM KM 12.00 TO KM 41.691 WITH LINK ROAD 0.00 TO 2.775 (BHAWANI POST) (NET LENGTH 32.467 KM) IN THE STATE OF ARUNACHAL PRADESH UNDER 127 RCC/ 42 BRTF PROJECT VARTAK (GS ICBR – II) THROUGH EPC MODE OF EXECUTION | 1 | Lumpsum | 1,41,90,54,210 ₹1,41,90,54,210 | 1,84,52,26,116 ₹1,84,52,26,116 | 1,81,14,70,811.01 ₹1,81,14,70,811.01 | 1,31,31,00,000 ₹1,31,31,00,000 | 1,79,82,00,000 ₹1,79,82,00,000 | 1,20,33,99,999 ₹1,20,33,99,999 Lowest | 1,44,00,00,000 ₹1,44,00,00,000 | 1,41,92,57,173 ₹1,41,92,57,173 | 1,57,26,78,000 ₹1,57,26,78,000 | 1,20,44,50,682.18 ₹1,20,44,50,682.18 |
Tender Value
₹191.8 Cr
EMD Value
₹1.9 Cr
Closing Date
22 Jul 2025, 11:00 amClosed
Chief Engineer Project Vartak
HQ Chief Engineer Project Vartak
Constr of New Rd Nelya Dhaula (Pkg/02) to NHSL specifications from Km 12.00 to Km 41.691 with link rd 0.00 to 2.775 (Bhawani Post) (net Length 32.467 Km) in the state of Arunachal Pradesh under 127 RCC/ 42 BRTF Project Vartak (GS ICBR II)
2025_BRO_712895_1
CE (P) VTK/NIB/01/2025-26
Open Tender
Civil Works
Works
1460 days
Rd Nelya Dhaula from Km 12.00 to Km 41.691
Please refer Tender documents.
3 documents required · 3 mandatory
₹20,000
Chief Engineer Project Vartak
₹1.9 Cr
HQ Chief Engineer Project Vartak
21 Sept 2026
6 Jun 2025
23 Jul 2025
6 Jun 2025
22 Jul 2025
6 Jun 2025
6 Jun 2025 - 1 Jul 2025
1 Jul 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CONSTRUCTION OF NEW ROAD NELYA – DHAULA (PACKAGE – II) TO NHSL SPECIFICATIONS FROM KM 12.00 TO KM 41.691 WITH LINK ROAD 0.00 TO 2.775 (BHAWANI POST) (NET LENGTH 32.467 KM) IN THE STATE OF ARUNACHAL PRADESH UNDER 127 RCC/ 42 BRTF PROJECT VARTAK (GS ICBR – II) THROUGH EPC MODE OF EXECUTION | 1 | Lumpsum | - | - |
stage.html
html • 0.08 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ.xls
BOQ • 0.28 MB
Tenderdocument.pdf
Tender Documents • 2.73 MB
Tenderdocument.rar
Tender Documents • 0.16 MB
Tenderdocument_2.pdf
Tender Documents • 2.90 MB
Tenderdocument_3.pdf
Tender Documents • 1.47 MB
Tenderdocument_4.pdf
Tender Documents • 1.60 MB
Tenderdocument_5.pdf
Tender Documents • 38.67 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .