Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹158 CrAdmitted-Finance | ₹158 Cr | L1 | Admitted-Finance |
| 2 | L2₹160.3 Cr+₹2.3 Cr (1.48%)Admitted-Finance ASHOK KUNJ OPPOSITE ROAD NO 3 ASHOK NAGAR RANCHI | RANCHI | JHARKHAND | 829205 | ₹160.3 Cr+₹2.3 Cr (1.48%) | L2 | Admitted-Finance |
| 3 | L3₹160.6 Cr+₹2.6 Cr (1.64%)Admitted-Finance CHANDANI CHOWK RAIGARH CHHATTISGARH 496001 | RAIGARH | CHHATTISGARH | 496001 | ₹160.6 Cr+₹2.6 Cr (1.64%) | L3 | Admitted-Finance |
| 4 | L4₹181.9 Cr+₹23.9 Cr (15.1%)Admitted-Finance | ₹181.9 Cr+₹23.9 Cr (15.1%) | L4 | Admitted-Finance |
| 5 | L5₹209.1 Cr+₹51.1 Cr (32.4%)Admitted-Finance SHREE HEERA DHAM BATHAIN ROAD KOSHI KALAN 281403 MATHURA UTTAR PRADESH | MATHURA | UTTAR PRADESH | 281403 | ₹209.1 Cr+₹51.1 Cr (32.4%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | RK Infracorp Private Limited L4 | SHIVALIK BUILDTECH PVT LTD L1 | HILL BROW METALLICS AND CONSTRUCTION PRIVATE LIMITED L3 | Shree Girrajjee Infra Heights Private Limited L5 | Spica Projects and Infrastructures Pvt Ltd L2 | SHRI BALAJI CONSTRUCTION COMPANY L6 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | CONSTRUCTION / IMPROVEMENT OF LACHUNG-YUMTHANG-ZADONG ROAD (PART OF NH-310A) DESIGN CHAINAGE FROM KM 52.808 TO KM 81.203 (PKG-VI & NET LENGTH 28.395 KM) FROM CL-9 TO NHDL WITH PAVED SHOULDER SPECIFICATIONS UNDER PROJECT SWASTIK IN SIKKIM STATE THROUGH EPC MODE (JOB No. D-BR-I/06/Sikkim/2025-26) | 1 | EPC | 1,81,89,99,999 ₹1,81,89,99,999 | 1,58,00,00,000 ₹1,58,00,00,000 Lowest | 1,60,59,00,000 ₹1,60,59,00,000 | 2,09,14,11,000 ₹2,09,14,11,000 | 1,60,33,59,709.06 ₹1,60,33,59,709.06 | 2,35,94,41,311 ₹2,35,94,41,311 |
Tender Value
₹265.1 Cr
EMD Value
₹5.3 Cr
Closing Date
7 Apr 2026, 5:00 pmClosed
Chief Engineer Project Swastik
HQ Chief Engineer Project Swastik
CONSTRUCTION/IMPROVEMENT OF LACHUNG-YUMTHANG-ZADONG ROAD (PART OF NH-310A) DESIGN CHAINAGE FROM KM 52.808 TO KM 81.203 (NET LENGTH 28.395 KM) FROM CL-9 TO NHDL WITH PAVED SHOULDER SPECIFICATIONS UNDER PROJECT SWASTIK IN SIKKIM STATE THROUGH EPC MODE
2026_BRO_753689_1
CE (P) SWTK/08/2025-26/EPC
Open Tender
Civil Works
Works
1095 days
Road Lachung Yumthand Zadong
As per RFP document
2 documents required · 2 mandatory
₹30,000
Chief Engineer Project Swastik
₹5.3 Cr
HQ Chief Engineer Project Swastik
31 Jul 2026
21 Feb 2026
8 Apr 2026
21 Feb 2026
7 Apr 2026
23 Mar 2026
21 Feb 2026 - 18 Mar 2026
18 Mar 2026
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.32 MB
RFP.pdf
Tender Documents • 1.36 MB
1MainReport.pdf
Additional Documents • 17.85 MB
DRAWING1.pdf
Additional Documents • 30.17 MB
2MaterialReport.pdf
Additional Documents • 1.01 MB
3TechnicalSpecifications.pdf
Additional Documents • 1.26 MB
DCS1.pdf
Additional Documents • 30.93 MB
DCS2.pdf
Additional Documents • 29.60 MB
DCS3.pdf
Additional Documents • 16.20 MB
4BillofQuantity.pdf
Additional Documents • 12.60 MB
DRAWING2.pdf
Additional Documents • 22.45 MB
DRAWING4.pdf
Additional Documents • 6.74 MB
BOQ_844176.xls
BOQ • 0.32 MB
DRAWING3.pdf
Additional Documents • 32.41 MB
5DesignReport.pdf
Additional Documents • 10.84 MB
DCA.pdf
Additional Documents • 4.10 MB
Corrigendum.pdf
PDF • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .