Loading…
Loading…
12,611 results • Latest
Maintenance and Repair to canals w/c 990.00 W/c 1080.00 W/C 1244.00 DY-1Dy-2Dy-A Dy-B of Dbc in Block -Ausgram-IIP.S Ausgram during the Irrigation Period of BHEDIA (I) Section-I under Guskara (I) Sub Division of Damodar Head Works Division
MR to Removal of deposited earth from canal bed from ch. 5.0 to ch. 38.00 of LBMC under Nachan Kanar irrigation scheme in P.S.- Faridpur Block- Durgapur- Faridpur Dist.-Paschim Bardhaman
Supply of fuel/energy to Diesel Generators for operation of regulator Gates during shutdowns in electric connection with kharif and Boro Irrigation 2026-2027 for the period July 2026 to April 2027 under Durgapur section No III
M/R to Kotaler Danra in between Ch0 to 94 Majher Danra in between Ch 0 to Ch65 for a length of 2.93 Km of Kanjore Reservoir Scheme under Katabundh (I) Section of Damodar Headworks SubDivision in PS Block Barjora Dist Bankura
Running repairs to Dy-6 of Salbandh Main Canal from ch. 0 to 73 in Block PS Bishnupur Dist Bankura under Damodr Headworks Sub-Division
Maintenance and running repair to WC-207.00 and WC-275.00 of LBMC and WC-234.50 WC-259.77 and WC-267.50 of DBC in connection with Kharif irrigation 2026 from period July 2026 to October 2026 under Durgapur section No.-III in Block P.S. Kanksa
Removal of Silt and jungle cutting of Maliarajore near Natungram Village in BlockPS Barjora Dist Bankura under Durgapur Section No I of Damodar Head WorksSub-Division
Maintenance and Repair to canals w/c 1494 w/c 133/Dy-C WC 862.00 W/C 188/Dy-C Dy-C and 1341 of DBC in Block -Ausgram-ii,P.S Ausgram during the Irrigation Period of Bhedia (I) Section I under Guskara (I) Sub Division
Clearing and removal of water hyacinth 5(five) times in between ch.310 to ch.324 of LBMC of Durgapur Section NoIII under Damodar Headworks SubDivision in Block PS Kanksa, DistPaschim Bardhaman
Running repairs to Dy-13 of Salbandh Main Canal from ch. 0 to 57in Block PS Bishnupur Dist Bankura under Damodar Headworks Sub-Division