Loading…
Loading…
11,836 results • Latest
Geotechnical and Sub-Soil Investigation for Construction of a two storied Building Less Community Health Centre CHC at Patrasayer BPHC in under XV Finance Commission FY 2025 26 under Bishnupur Health District in the district of Bankura.
L053-Forbay Tank to Crusher Point Via Yakreybong, LENGTH. 2.032 KM, PACKAGE NO. WB-07-371
SPL REPAIR AND REPLACEMENMT OF OLD UNSV DISTRIBUTION SYSTEM SUBMAIN WIRING EARTHING BLDG SECURITY LIGHTS AND CONNECTED ALLIED WORKS OF OTM ACCN AND OLD VINTAGE CI PIPE LINE INTO DI PIPE LINE OF WATER SUPPLY DISTRIBUTION SYSTEMS OF SHOPPING COMPLEX AN
L021-Farashay ADB to Ghalay Gaon, LENGTH. 2.500 KM, PACKAGE NO. WB-07-348
Fencing the Garden by providing IRC fabric mesh in between Central Library and RUSA Building in the campus of PRMS Mahavidyalaya Bankura in the district of Bankura
Annual Comprehensive Maintenance of entire E.I. Works for a period of one year at the newly constructed Howrah commercial tax building under directorate of commercial taxes, Govt. of West Bengal at 7/1 Mackenzie lane, Howrah-AMC of AC Machine for 01
SPL REPAIR TO BLDG NO P/OR/411/01 06 AT TARAPORE VIHAR UNDER AGE B/R-II AND AGE E/M OF GE SUKNA AT MIL STN SUKNA
Geotechnical and Sub-Soil Investigation for Construction of a two storied Building Less Community Health Centre CHC at Ranibandh BPHC in under XV Finance Commission FY 2024 25 under CMOH Bankura in the district of Bankura.
Annual Comprehensive Maintenance of Air Conditioning Machines installed at Different Buidling of Sarat Chandra Chattopadhyay Govt. Medical College and Hospital, Uluberia under Uluberia Section I, PWD in the district of Howrah for 01 (One year).
Preparation of Detailed Project Report for Strengthening of Beldanga Amtala Patikabari Road MDR from 34.80 Km. to 38.10 Km. under Nadia Highway Division No.-I, P.W. Roads Directorate in the District Nadia during the year 2026-27.