Loading…
Loading…
2,17,895 results • Latest
Repairing of Ramitay Sherpa Buddhist Kalyan Samaj Ghar (Jhepi GP). APAS/01/023/23/0002
Engagement of Agency for providing Manpower of different categories on Contractual basis at WBCMPFL Office, LB 2, Sector III, Salt Lake City, Kolkata 700106
Daily Operation mtc. of rising main distribution system, sluice valve, street stand post etc. under Hutmura W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte.
UPGRADATION OF ROAD FROM HOUSE OF ANOWAR SK TO NAJRUL SK AT RAMTANUNAGAR BOOTH NO-4 UNDER KAKDWIP P.S. and UPGRADATION OF ROAD FROM HOUSE OF NURHOSEN SARDAR TO JAKIR GHORAMI AT RAMTANUNAGAR BOOTH NO-4 UNDER KAKDWIP P.S. - Madhusudanpur GP
RESTORATION OF PAVER BLOCK,IPS PASSAGE AND FOOTPATH AT AUROBINDA SARANI, BADRIDAS TEMPLE ST., RAJA DINENDRA ST,HZ LANE,NANDAN BAGAN ST ,APC ROAD, GOURIBARI LANE ETC IN WD. NO.15
CONST. OF SURFACE DRAIN AT ANANDA PALLY NEAR PRE. NO- 29/1 IN WARD NO- 142
Pandua Kamtai Baloon Road from 2.86 km to 4.14 km reparing work in Patches by patching potholes,PC,SC etc of Bansberia Highway Sub-Division - II under Hooghly Highway Division -II, In the District of Hooghly during The Year 2026 -2027
Painting of full body 220KV and 132KV EHV Towers under the jurisdiction of Kasba 220 KV SubStation, under Kasba Area Office, WBSETCL
Repairing and renovation of T.P. road at Misra sweet towards chrisatan para more ,Ward-39 ,Borough- VI under Asansol Municipal Corporation.
Annual Maintenance Contract of Entire Electrical Installation works at Krishi Bhawan, Club Road, Jalpaiguri.
INSTALLATION OF 5 Nos SOLAR STREET LIGHT NEAR RAJJAK MOLLA AND OTHERS 4 AT RAMTANUNAGAR BOOTH NO-4 UNDER KAKDWIP P.S. - Madhusudanpur GP
REPAIRING AND REPLACEMENT OF STREET LIGHTING ARRANGEMENTS AT NIMTOLA GHAT STREET AND OTHER PLACES IN WARD NO -20 UNDER BR II
Removal and lifting of debris mixed coal/ carbonaceous/ foreign material in between 2NL and 5NL/3D to 5D in Kenda Seam of Jambad UG Colliery
Setting up of MODEL AYUSH OPD at Kalimpong District Hospital, GTA
Emergent repairing of Kunur Bridge Bituminous surface at 9.40 km of Panagarh-Illambazar road by profile corrective course, repairing potholes, premix carpet etc. in patches under Asansol Highway Division, P.W.(Roads) Directorate
Daily Operation mtc. of rising main distribution system, sluice valve, street stand post etc. under Chitmu W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte.
Unbranded Handcrafted Free-standing Almirah
Unbranded 20 (litre) Exterior Undercoating Enamel of Light admiral grey (697) Colour
Repair of S.T.K.K. Road from 3.415 kmp. To 6.00 kmp. Of Chandannagar Highway Sub-Division under Hooghly Highway Division No.II in the district of Hooghly during the year of 2026-2027
Kolkata Police Hospital - Setting up Basin for hand wash purpose at diffrent places at CCU, OT and other non infectious places at first and second floor and aluminium partition works at diffrent places and develop the washing area at OT zone and othe
acer High End Desktop Computer with Warranty 3 Year
Construction CC road and masonary surface drain at sayoginar Within ward no-84 under borough-VI of Asansol Municipal Corporation
Supply, Installation, Testing, Commissioning of CCTV Surveillance System at Different Locations at Balagarh, Hooghly Sadar Subdivision under MP LAD Scheme. (1st Call)
Installation of one Solar Light near Sar Jora Shib Mandir Bus Stand
Daily Operation mtc. of rising main distribution system, sluice valve, street stand post / community stand post etc. under Barabazar W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte.
Housekeeping including sweeping cleaning works at NKDA Administrative building, Plot No. DG 13 at Action Area - ID, New Town Kolkata, ( for 02 year).
ANNUAL CIVIL MAINTENANCE WORK INCLUDING OUTSIDE PLUMBING WORK AT ECO ISLAND NEW TOWN KOLKATA.
engagement of an agency for operation, control and management of Light System, Sound System, Stage Shifting and Ushering of Madhusudan Mancha, Kolkata for three years team
As Per NIeT and SOQ
Installation of one Solar Light in front of Bishtu Bairagya house at Sar Bairagyapara
CONSTRUCTION OF BATHING GHAT AT NADU PARA BORO PUKUR WITHIN PS NO 225
acer 1024 GB Storage Laptop - Notebook
CONSTRUCTION OF CC DRAIN WITH SOAKPIT GURDWALL FROM SHG CHATAL TO FOOTBALL GROUND AT SHYAMSUNDAR UNDER SHYAMSUNDAR GP UNDER CFC 2025-26 (T)
Simlapal Khatra Road from ch 3.00 kmp to ch 9.00 kmp (in stretches) repairing and maintenance work under Bankura Highway Division in the district of Bankura.
Chittaranjan Seva Sadan --- Rehabilitation of distressed concrete including painting of 3rd floor NTS Hostel , Kolkata during the year 2026-27.
CONST. OF SURFACE DRAIN AT NARAYAN ROY ROAD BYE LANE SLUM AREA NEAR PRE. NO- 29/5, 29/4 AND OTHERS IN WARD NO-125
Daily Operation mtc. of rising main distribution system, sluice valve, street stand post etc. under Bandwan Spot W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte.
Renovation of Sirikhola Tribal Higher Secondary School, at Sirikhola (Sirikhola-Daragaon GP) APAS/01/023/1/0001
Installation of one Solar Light in front of Manu Goswami house at Sar Bhattacharjeepara
DURACELL 3.6 Volt Nickel Cadmium Battery
A3 Size Multifunction Printer (MFP) (Q2)
Sambhunath Pandit Hospital--Urgent Repairing works for seapage through, out side wall for Co-operative Room at Basement of Casulty Building, SNP Hospital during the year 2026-27.
High Mast light in front of Tapan Chandra House within PS No-242
complete repairing of Kirloskar make 50HP,550V slip ring motor of No-8 pit of Bankola colliery.
CONSTRUCTION OF CC DRAIN WITH SOAKPIT FROM AMIT DAN HOUSE ARABINDU SAMANTA GOYALBARI AT MADANAGAR UNDER SHYAMSUNDAR GP UNDER CFC 2025-26 (T) UNDER SHYAMSUNDAR GP UNDER CFC 2025-26 (T)
Financial Advisory Services - Onsite; Tax Advisory
Supply and Delivery of non centralized local materials like 33kv Tee Con. ISL PAD to Panther, LT Spacer-1PH, Porcelain Shackle insulator , GI shackle strap 9, Cu FLEX.BRAIDED TAPE, FXD MVG CONTACT, TEE-CON. DOG TO DOG to Kakdwip Divisional Sto
O and G of the electric operated pumping machinery at Khan Saheber Abad, Dhaspara, Nagendraganj Aug, Manaswadip, Companirchar Aug., Krishnagar Aug anbd Haradhanpur Aug W/SS of Sagar Block under SMD, PHE Dte.
Supplying and Installing of Air Condition System, Light etc 3rd Floor and 4th Floor reception area as and where required in the Administrative Office of WBBPE at Salt Lake, Kolkata-700091----Electrical installation Work