Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.2 LAccepted-Finance VILLAGE JOTHBHIM P O HATGACHA NEW TOWN KOLKATA 700 156 | 24 PARAGANAS NORTH | WEST BENGAL | 700156 | ₹7.2 L | L1 | Accepted-Finance Lowest offer given |
| 2 | L2₹7.3 L+₹7,283.34 (1.01%)Rejected-Finance BHIAGRAM ENGLISH BAZAR MALDA | MALDA | ₹7.3 L+₹7,283.34 (1.01%) | L2 | Rejected-Finance Higher offer given |
| 3 | L3₹7.4 L+₹18,208.34 (2.53%)Rejected-Finance BALIGORI CHAKPACHURIA NEW TOWN NORTH 24 PGS KOLKATA 700156 | 24 PARAGANAS NORTH | WEST BENGAL | 700156 | ₹7.4 L+₹18,208.34 (2.53%) | L3 | Rejected-Finance Higher offer given |
| 4 | Rejected-Technical NASKARPARA JOTBHIIM NEW TOWN P O HATGACHA P S KOLKATA LEATHER COMPLEX SOUTH 24 PARGANAS WEST BENGAL 700156 | NEW TOWN | SOUTH 24 PARGANAS | WEST BENGAL | 700156 | - | - | Rejected-Technical Not Admitted |
Tender Value
₹7.3 L
EMD Value
₹14,567
Closing Date
9 Sept 2026, 2:00 pmClosed
General Manager (Engg)-IV
HIDCO BHABAN
ANNUAL CIVIL MAINTENANCE WORK INCLUDING OUTSIDE PLUMBING WORK AT ECO ISLAND NEW TOWN KOLKATA.
2026_HIDCO_1040309_1
HIDCO/GM(E)IV/MN/NIT06/26-27
Open Tender
CIVIL WORKS
Percentage
365 days
NEW TOWN
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹14,567
23 Sept 2026
2 Sept 2026
11 Sept 2026
2 Sept 2026
9 Sept 2026
2 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m | - | M3 | 447 | - |
| 2 | Dismantling R.C. floor, roof, beams etc. including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars In ground floor including roof. | - | M3 | 1,956 | - |
| 3 | Stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing rubbish within a lead of 75m as directed. | - | m2 | 19 | - |
| 4 | Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge. | - | M3 | 166 | - |
| 5 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding literate or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming thesides of trenches, leveling, dressing and ramming the bottom, bailing out water as required complete a) Depth of excavation not exceeding 1,500 mm. | - | m3 | 119.27 | - |
| 6 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement, if any, in ground floor as per relevant IS codes. | - | m3 | 5,589.22 | - |
| 7 | Filling in foundation or plinth by fine yellow sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity)
b) Fine yellow sand | - | m3 | 1,317.14 | - |
| 8 | Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. | - | m2 | 24 | - |
| 9 | Ordinary cement concrete (mix 1:1.5:3) with graded stone chips (20mm nominal size) excluding shuttering and reinforcement, if any, in ground floor as per relevant IS codes. | - | m3 | 6,136.04 | - |
| 10 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation, basement and upto roof of ground floor/upto 4 m.
i) Tor steel/Mild Steel
I.Sail / Tata / Rinl | - | MT | 60,580 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
BOQ_2554708.xls
BOQ • 0.29 MB
TENDERDOCUMENT.pdf
Tender Documents • 0.59 MB
Specialtermsandcondition_GM4.pdf
Tender Documents • 0.68 MB
2911_FORM.pdf
Tender Documents • 0.16 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .