Loading…
Loading…
2,17,193 results • Latest
DEVELOPMENT OF PASSAGE INCLUDING RENOVATION OF SURFACE DRAIN NEAR G-40, G-55, H26/1 ETC. ANANDANAGAR SLUM AREA IN WARD NO-125,BR-XVI
INSTALLATION OF SOLARDRINKING WATER WITH NEARATHARROJANI HALKA MASZIDUNDER CHAMTA GRAM PANCHAYAT WITHIN SITAI DEV. BLOCK.
Procurement of spare parts (Non-RC) for Drilling Rig equipment (Draw-works and Rotary Table) installed at Drilling Rigs of ONGC MBA Basin, Kolkata.
Cleaning of Jungle in Road flanks of Matigara Phansidewa Road Ch 850 km to 1490 km and Kharibari Phansidewa Road Ch 1850 km to 2100 km under North Bengal Construction Division PWD in the district of Darjeeling
Cutting of grass, sharbs and cleaning the area along the bank of pond 1 and bank of sludge ponds , cutting and removal the same as directed by the EIC under New Town Kolkata Water Supply Divn.-I, PHE Dte. (For 6 month)
UPGRADATION OF CEMENT CONCRETE ROAD FROM THE HOUSE OF UTTAM SAMANTA TO LAXMIKANTA SAMANTA HOUSE AT BOOTH 30,Surjanagar GP of Kakdwip Dev Block,S24 PGS, Surjanagar GP, PS NO - 30, (APAS/01/131/30/0001)
Day to Day Operation, efficient monitoring and Maintenance, including IEP Maintenance in all respect for Kumarganj PWSS and Agachha PWSS (Block - Kumarganj), under Balurghat Division, PHE Dte.
Supply of materials (Construction andPlantation work) for implementation of different VB-G RAM G schemes under Daspalsa GP area under Mayureswar-II Development Block
Restoration of lighting arrangement for landscape and boundary wall of Swapno Bhor Newtown under WBHIDCO
Installation of Submersible Pump near Badal house at Uttarpara Under Jalalpur Gram Panchayat
Sinking of Rig Ground bored 250mm x 150mm dia. and 300 mtr. deep Tubewell having 66 mtr. housing pipe by Rotary method for 2nd Tubewell site of DANGA Piped Water Supply Scheme of SONARPUR Block for Augmentation of Surface Water Based W/S Scheme
Construction of Sitla Mandir at Nichu Gram Gowalapara, Kulti, Ward No-65, Borough-X under Asansol Municipal Corporation. 3rd Call
Minor repairing works to Sanitary and Plumbing system and allied works to different office buildings PWD main office building PWD annex office building Commissioners residential office and Correctional home and other building under Jalpaiguri
SUPPLY AND DELIVERY OF 7000 MTR SILICON FIBERGLASS INSU.COVER 6MM WIRE AS PER STANDARD SPECIFICATION OF WBSEDCL
Emergent Repairing and Maintenance work in different stretches of Nanoor-Basapara Road (MDR) from 0.00 Kmp to 3.00 Kmp,and 4.00 kmp to 6.00 kmp Under Birbhum Highway Division-II in the District of Birbhum, during the year 2026-27.
Construction of Sampang Gaon M.I.Scheme at Middle Mamring Busty
Construction Of Boundary wall Head work Site of Betai Zone - II Ground water based piped water supply scheme under Tehatta Sub - Division PHE Dte.
MAINTENANCE OF RELEASE DECK FOR TIGER AS A PART OF TIGER RE-INTRODUCTION PROGRAMME
SUPPLY AND DELIVERY OF 200 NOS 11 KV V BRACKET FOR PCC POLE 8M LONAS PER STANDARD SPECIFICATION OF WBSEDCL
EARTH WORK SHUTTERING CONCRETING REINFORCEMENT WORK ETC
Operation and guarding of the electric operated auto /manual controlled pumping machinery at Alipur, Sankharipukur, Balbalia, Champahati Zone-II, Hariharpur Part-I W/S Scheme of Baruipur Block under south 24 pgs Mechanical Division PHE Dte.
MAINTENANCE OF W.S SERVICE MAIN BY CUTTING FLUSHING, LEAK REPAIR, DISINFECATION AND OTHER ANCILARY WORKS AT BOSE PARA, SARDAR PARA AND STREAM LAUNDRY AREA IN WARD NO 111, BR-XI.
Upgradation of Road from Hamirpur Bridge to Prasulla Bar house within Paldhui G.P. under Ramnagar-II PS in the District of Purba Medinipur.
UPGRADATION OF CONCRETE CEMENT ROAD FROM THE HOUSE OF JIYA UDDIN BAIDYA TO SAMAD SEKH KABARSTHAN AT BOOTH 29,Surjanagar GP of Kakdwip Dev Block,S24 PGS , Surjanagar GP, PS NO - 29, (APAS/01/131/29/0009)
Construction of stage at Srikrishnapur Tarun Samity football ground within Gourbazar GP under Durgapur Faridpur Block.. Booth No 182
Construction of low hight elevated water tank at Roksha Kali Mandir Ward No. 71 Br. X under AMC
Construction of 02 (two) nos. chlorination rooms for BAHARU Piped Water Supply Scheme to accommodate FHTC in Jaynagar-I Block under South 24-Pgns. W/S Divn.-I, PHE Dte., South 24-Pgs. Dist. for Augmentation of Surface Water Based Water Supply Scheme
Supply, Delivery, Erection Commissioning of 1 no 9.0 Mtr. Octagonal High Mast Tower 6 X 150 Watt LED Light system with dual channel 24hr twilight timer operation Kapasharia Dakshin para Masjid under Kapasharia GP under Chanditala-II Block
SUPPLY AND DELIVERY OF 150 NOS 33 KV V BRACKET FOR PCC POLE 9M LONG AS PER STANDARD SPECIFICATION OF WBSEDCL
Duttafulia Aranghata Road from Ch 40 Km to Ch 42 Km Except PHED restoration Zone Emergent Patch repairing and Maintenance work under Quality Control Sub Division No I, of Nadia Highway Division No II PW Roads Directorate
REPAIRING OF ROAD FROM VIJAY PRADHAN HOUSE TO ABHINASH THAPA HOUSE UNDER CHAMURCHI GP WITHIN BANARHAT DEVELOPMENT BLOCK UNDER APAS. (SCHEME ID-APAS/01/021/244/0009)
SITC of AC Machine including allied electrical installation work at all the offices of the Newly constructed court building, Bishnupur under Bankura Electrical Division_SITC of Main LT panel to feed the power of augmented load of WBSEDCL.
Supply, Installation, Testing, Commissioning of CCTV Surveillance System at Different Locations at Pandua, Hooghly Sadar Subdivision under MP LAD Scheme. (1st Call)
Providing dedicated skill manpower for data entry, maintenance and troubleshooting of computer and accessories at the office of the Assistant Engineer, High Court Electrical Sub- Division, P.W.Dte. (For One Year)
Batikar Kurmitha Road (MDR) from 1.30 kmp to 3.70 kmp urgent patch repairing work (in stretches) under Bolpur Highway Sub Division of Birbhum Highway Division-II, in the District of Birbhum during 2026-2027
BHURADANGA BAURIPARA CLUB CLUB REPAIRING
UPGRADATION OF CONCRETE CEMENT ROAD FROM NH117 TO ABBAS SARDAR HOUSE AT BOOTH 29,Surjanagar GP of Kakdwip Dev Block,S24 PGS, Surjanagar GP, PS NO - 29, (APAS/01/131/29/0008)
Construction of low hight elevated water tank at B.N.R near Bus stand Ward No. 71 Br. X under AMC
Three months trial run for Secondary Grid for Providing 100 FHTC in Zone-X/B at Kalikapota mouza of Mograhat-I within Mega Surface Water Based Water Supply Scheme for Falta- Mathurapur District.- South-24 Pgns. under South-24 Pgns W/S Divn-I, P.H.E
Operation and guarding of the electric operated auto /manual controlled pumping machinery at Rana, Ratan, Indrapalla, Hariharpur Part-II W/S Scheme of Baruipur Block under south 24 pgs Mechanical Division PHE Dte.
Repairing and Maintenance of Kalikapur Govt. Owned and Operated Major RLI Scheme under Katwa(Agri-Mech) Sub-Division under Burdwan (Agri-Mech) Division under Non Plan in the District of Purba Bardhaman for the FY-2026-27.
Restoration of road from Kartick Singh to amtoli high school monipur GP
Installation of High Mast Light near Narayan Sarkar house Under Malatipur Gram Panchayat
INSTALLATION OF ELECCTRICAL WIRING ALONG WITH OTHER ELECTRICAL ACCESSORIES AT 10 , M.M ALI RD , KOL-23, NEWLY CONSTRUCTED TOILET IN WARD-78.
CONSTRUCTION OF SOLAR SUBMERSIBALE WITH OVER HED TANK AND SOAK PIT NEAR JOBA PUKUR PAR AT RAMNAGAR VILLAGE RAMNAGAR SANSAD IX -113065630 ( 2nd Call)
Construction of Hematpur Bus-Stand with drain at G.P Srirampur within Purbasthali-I Block Project fund State Development Scheme (Transport Dept.) ID TR252639130S000
UPGRADATION OF CONCRETE CEMENT ROAD FROM THE HOUSE OF ANICH MOLLA TO IYAJ UDDIN BAIDYA HOUSE AT BOOTH 29,Surjanagar GP of Kakdwip Dev Block,S24 PGS , Surjanagar GP, PS NO - 29, (APAS/01/131/29/0005)
Fitting of Air Valves and Pressure Gauges to different points of Rising Main towards Mayapur Gp near Birlapur (CT) under Birlapur (CT) Piped Water Supply Scheme to accommodate FHTC in Budge Budge-I Block under South 24-Pgns W/S Divn.-I, South 24pgns
Supply, Delivery, Erection Commissioning of 1 no 9.0 Mtr. Octagonal High Mast Tower 6 X 150 Watt LED Light system with dual channel 24hr twilight timer operation near Kapasharia Uttarpara Masjid under Kapasharia GP under Chanditala-II Block .