Loading…
Loading…
2,17,570 results • Latest
House service water Connection to 1885 nos of Premises at different wards upto private property line with 20mm OD HDPE (PE100, PN16) with necessary connection accessories including Water Meter and restoration of damages of road/pavement etc. for Wate
Professional Consultancy Services in respect of Construction of Information Technology Park Incubation Centre at Rajarhat Ph II
REPAIRING OF PAVER BLOCK FOOTPATH AND PASSAGE ALONG WITH KERB AND CHANNEL FROM 19/3A BIDHAN NAGAR ROAD TO 17/1/H/1 ULTADANGA MAIN ROAD AND THEIR SURROUNDING AREAS IN WARD NO.-13
REPAIRING OF STREET LIGHTING SYSTEM AT ATM ROAD, S N PANDIT STREET, CHOWRINGHEE ROAD AND SURROUNDING AREAS IN WARD NO-71 UNDER BR-IX.
All as per BOQ
Creation and One Year Maintenance of Landscaping and Beautification at Switch Yard, Raghunathpur Thermal Power Station (RTPS), DVC Over 10584 sqm
Repairing of roof at palashbari tg 2 nos at primary school at part no 21/251 UNDER CHAMURCHI GP WITHIN BANARHAT DEVELOPMENT BLOCK UNDER APAS FUND. (SCHEME ID-APAS/01/021/251/0004)
Day to Day Operation, efficient monitoring and Maintenance in all respect for Zone - I, Zone - III and Zone-V of Gangarampur Western Sector under Sub Surface Based Piped Water Supply Scheme at Gangarampur Block under Balurghat Division, PHE Dte.
Khagbaikunthapur - T09 Under Sonamukhi Block
Bankata to ODR (T06 to Bankata)
Supply of outsourced drivers for various health facilities under CMOH office, Nadia 2026
Patch repair with pot holes premixed carpeting and seal coat type B of Madhyamgram ROB in stretches from 8.03 km to 8.7 km during the year 2026_2027
Annual Preventive and corrective maintenance of entire Electrical Installation work including Substation at State Archives Building, 43, Shakespeare Sarani, Kolkata.
CONS OF PUCCA DRAIN FROM TAPAN PAL TO BISWANATH DEB AT SANSAD XVI, HAIDERBELIA UNDER PRITHIBA G.P.
SINKING OF TUBE WELL NEAR THE HOUSE OF AMIYA PRAMANIK AT BOOTH 28 , Surjanagar GP, PS NO - 28, (APAS/01/131/28/0004)
Supply material for Construction of CC road from Rabindra nath kar to Swapan Barik at Mathura
REPAIRING AND RENOVATION OF EXISTING MAIN ELECTRICAL DISTRIBUTION LINE FROM ENERGY METER TO LT PANEL AT SAKHER BAZAR MARKET UNDER BOROUGH XVI , JOKA.
Annual Comprehensive Servicing and Maintenance of 2 two Nos. Bed-cum- passenger lift at Kolkata Police Hospital and Sambhu Nath Pandit Hospital under SSKM(H) Electrical Sub Division.
CONSTRUCTION OF DRAINAGE ADJUNCT AT NEW ANNY SARANI IN WARD NO-144, UNDER BR-XVI
Maintenance of Garden at Head Work site of Tank- 9 at Action Area-I under New town Kolkata Water Supply Division-I PHE Dte. for the period of 01.07.2026 to 31.03.2027 (09 Months)
Installation of submersible pump with water reservoir at Kesiara aradang,Mouza Kesiara,J.L 81 under Gangajalghati G.P out of 15th FC fund under G.Ghati P.S A.C 110680841
Procurement of Miscellaneous Electrical Item Spares at BkTPS.
CONST OF PCC ROAD NEAR HARI PARA AT KELEJORA ACT CODE 111386418
Construction of road from house of Rustam Sardar to house of Bakkar Sardar Near Fala Swa Mill.
REPAIRING OF ROADS AND PASSAGES DISTURBED BY WATER SUPPLY AND CME CIVIL DEPARTMENT AT 30 C HARAMOHAN GHOSH LANE, 4C DR. PANCHANANMITRA LANE, 16 MOULANA ABUL KALAM AZAD SARANI AND OTHER PLACES IN WARD NO.-35
WASHING AND PAINTING OF GUARD RAILING INCLUDING KERB AT A.P.C. ROAD UNDER BR.-V
Day-to-Day Operation of 2 (Two) Nos. Lift, one at the New Administrative Building and another at South Annex Building within the Assembly House Compound under Assembly House Electrical Sub-Division, PWD, for a period of 12 (Twelve) Months.
Supply rate of different type of materials at worksite of VB-G RAM G works for Pratappur-II GP under Panskura-I Dev.. Blockwithout GST
Repairing of electrical installation along with allied works at Fulbari WTP complex under Siliguri Comprehensive ws Scheme.
Emergent Replacement work of damages and leakages underground main line for water supply at the side of RHE Baruipur 24 Parganas South
Emergency day to day cleaning of chowked underground sewer line, gully pit, manhole, master pit etc. in KIT Housing Scheme Nos. BRS-X, SIH-IV and IV (S) under Housing Sector, KMDA
CONSTRUCTION OF PCC DRAIN WITH COVER AND SOAKPIT FROM JAGANNATH MONDAL HOUSE TOWARDS VISWADEB GARAI HOUSE AT LANGALHATA-II
Construction of CC road repairing from Nousad house upto Sahabuddin house Under Malatipur Gram Panchayat
T08 - Bhaeaspukhas
Godhanpara - Notial - Dhulari Road surface repairing work from 0.500 km. to 3.500 Km. (in stretches) under Murshidabad Highway Division No.I. during the year 2026-2027.
REPAIRING OF CC ROAD FROM SANJAY MONDAL HOUSE TO PACHAN MONDAL HOUSE
Repairing of Road from house of Babu Mondal to house of Jaga Mondal at 1 no colony Uttar para
CONSTRUTION OF BATHING GHAT AT BABURPUKURPUKUR UNDAR BAHIRKHAND GP(30FT) ) AT PS 100 UNDER NARAYANPUR BAHIRKHAND GP WITHIN HARIPAL DEV. BLOCK
REPAIRING OF CHOCKAGE OF SEWER AT 5/13, 5/14 BAGMARI ROAD, 28/1 M.P ROAD AND DIFFERENT UTTARAN LOCATIONS IN WARD NO. 32
Restoration of HVAC System by Re-procurement of Missing Components at West Bengal University of Health Sciences
ELECTRICAL WORK AND OTHER ALLIED WORKS FOR THE NEWLY SUNK BIG DIA. TUBEWELL AT MILAN PARK WD-109 BR-12 AND GARFA SCHOOL LANE WD-104,BR-11
09/EE/ECPD-I/EandAM/KMDA OF 2025-26 ( SL-9)
Supply material for Repairing and new construction CC road from Kasipur to Panchet GP
WASHING AND PAINTING OF GUARD RAILING INCLUDING KERB AT M.G. ROAD FROM BAITHAK KHANA ROAD TO C.R. AVENUE UNDER BR.-IV AND V .
Construction of Road from Gangajalghati to Kendrabona
EARTH WORK SHUTTERING CONCRETTING SOLER PANNEL WORK BORING WORK INSTALLATION OF SOLAR PUMP PANNEL ETC
Annual Maintenance of Electrical installation in the campus of State Central library, Kolkata---Annual preventive and corrective maintenance including day to day operation of entire Electrical Installation with operator cum attendant forone no lift.
Creation of Check Dam at Kesiara Sanadanga Nimtala, Mouza-Kesiara J.L 81under G.Ghati G.P out of 15th F.C fund under G.Ghati P.S A.C 109945055
Tantkanali to Papurdihi (T06 to Tantkanali)
Mothabari - Uttar Lakshipur Road (From ch. 0.250 km to ch. 1.100 km and from ch. 2.000 km to ch. 2.400 km) Bituminous pothole repairing work, under Malda Highway Division in the District of Malda during the year 2026-2027.