Loading…
Loading…
2,16,547 results • Latest
Improvement of PCC road from laltu Rabidas house to rabi Pramanik house at Fatullapur Paschimpara Village Sansad 22
Supply of Hospital Furniture and Equipment
INSTALLATION OF 13 NOS SOLAR LIGHT AT BOCHPUR APAS/01/268/18/0008
SUPPLY AND DELIVERY OF STREET LIGHT LED FITTINGS AT KANKURGACHI AND OTHER PLACES IN WARD NO-31 UNDER BR-III
RESTORATION OF COURTYARD AND PASSAGE AT 185/1 A.J.C BOSE LABOUR QUARTER DISTURBED DUE TO DRAINAGE WORK IN WARD NO-61
Setup Submersible pump with water reserver and water testing report at new GP office Land at Kakhuriabari
Upkeepmentand MaintenanceofElectrical Installation RegularPeriodical Maintenance as well as PreventiveandCorrective Maintenanceat SumangalamHomefor BoysBishnupurunder.For theyearof25 26SITCof splitACmachineatthe Officeofthe Superintendent
CONSTRUCTION OF PAVER BLOCK ROAD FROM NANDA ROY HOUSE TO LALDOH ORAON HOUSE UNDER SAKOAJHORA-I GP WITHIN BANARHAT DEVELOPMENT BLOCK UNDER APAS FUND. (SCHEME ID-APAS/01/014/225/0002)
Corutruction of Concrete road from house of Swapan sardar towards house of Nirmal Sardar via Shyamal Sardar at Kushumkhola at Mukundabagh GP under M-J Dev. Block.
Construction Of Pucca Drain With Soakpit Dakshin Murabania Nayanjuli to Jumma Masjid at Dakshin Murabania sansad.JL_581,PLOT-213-216
Improvement of PCC road from Hajrat sk house to Jahangir Sk via Rajjak sk house at Raghunathpur village Sansad 11
RESTORATION OF DAMAGED AND DEPRESSED I.P. AND PAVER BLOCK PASSAGE AT 12 BEDFORD LN, 17,26, RIPON LN, 13,21 ELLIOT LN AND DIFFERENT PLACES IN WARD NO-61.
WBPHE/EE/JMD/NIeT 08_75 OF 2026-2027
Procurement of heavy-duty pillow block bearings for Wagon Tippler 1 and 2 at CHP, BTPS.
SITC of split AC machine including necessary Electrical Installation work at the Bill Section of the Bishnupur Division office and office establishment of the Bishnupur Sub Division Office, PWD.
IMPROVEMENT OF THE UTILITY ZONES URROUNDING AREAS ATTACH WITH THE MODULE-1 HAVING CAPACITY 20MGD POTABLE WATER, UNDER IGWTP.
Clearing and removing water hyacinth under AMC for the period of 365 days including thick and thorny jungles of Choita River from ch 0.0 km to 5.0 km within Block and P.S. Gaighata Dist North 24 Pgs
Construction of CC Road from Shyamgachh Santosh Singha House TO Biraj Singha House at Shyamgachh, Butijhari Mouza under Majhiali G.P within Chopra Panchayat Samity. Scheme ID- 113274713
MAINTENANCE OF ROAD SIDE GUARD RAILING BY PAINTING AT HARISH MUKHERJEE ROAD, HAZRA ROAD AND D.L.KHAN ROAD IN WARD NO 71 AND 73.
SUPPLY AND DELIVERY OF STREET LIGHT LED FITTINGS AT SUREN SARKAR ROAD AND OTHER PLACES IN WARD NO-33 UNDER BR-III
Installation of 6 nos Solar Stree Light from Modanmohanpur village towards Modhusudanpur Station PS-46 under Chandanpur GP within Haripal Dev. Block
INSTALATION OF 5 NOS SOLLAR LIGHT NEAR H/O PANCHU GANGULY,SHIB MANDIR, ANTH CLUB KALI MANDIR, H/O NAKUL MASTER AND SHASTITALA THKUR BARI AT SAHAPUR BOOTH NO 20 APAS/01/268/20/0011
Construction of Concrete Drain From Telipara Atchala to Ranjit Patra Pond at Amdiha
Rectification of Electrical Installation work at MCH BUILDING EZRA BUILDING SHYAMACHARAN LAW BLDG PRINCIPAL BUILDING ANATOMY BLDG CENTRAL LAB BUILDING PATHOLOGY BUILDING Electrical Works
Mending damages of potholes on different stretches on Lodhasuli Dahijuri Kupannad Road MDR in between chainage 29.00Km to 36.00Kmp under Jhargram Division, PWD in the district of Jhargram.
Construction of Concrete Road from the house of Mangal Roy to the house of Sanjay Roy at Ganeshpur P.S. No.- 49 under Bahadurpur G.P. within MJ Development Block under APAS during the Year 2025-26.
Marching of SDL at 16L/OD of Rana Seam to 13D/ 2L of Sripur Seam and UDM at 27L/ 22D to 18D/ 21L of Sripur Seam set with all Electrical installation (Get end Switches, Drill Panel, Power Cable, Machine Cable and Drill Cable and SDL bucket) of Bhanora
SUPPLY OF HOSPITAL FURNITURE AND EQUIPMENT
Routine maintenance of Saroj Setu over river Atreyee at 0.22 Km of Balurghat Laskarhat Road, Tulai Bridge over Local Khari at 7th Km of Udaypur Mahipaldighi Road, Baliakhari Bridge at 10thKM of Harirampur Dhumsadhighi Road, Rampur Bridge over Tangon
SITC of New Air Conditioning system and Repairing of Old AC Machine at Meeting hall of Karmashree Building, Circuit House in the district of Bankura.
Supply and Delivery of different types electrical maintenance materials at Court Room no-4, 5, 8, 14, 19, 23, front of 24, 25 Chamber no-3 Honorable Judges Corridor western side and in front of Chamber no-1, Junior Bar library club .......
SOLAR LIGHTS FROM KANGSARYPUR VILLAGE AREA 4NOS BOOTH NO 21 APAS/01/268/21/0004
NEW INSTALLATION OF DRINKING WATER PIPE LINE AT GP OFFICE ID 90765945
Repairing of Ghoshpara Jaguli Road from 1 km to 2 km, 3 km to 5 km and 7 km to 9 km in patches by providing repairing pot holes by Bituminous pot holes repairing pot holes by premixed carpeting and seal coat type B under Barrackpore Division during t
Construction of Muster house at Kashyem Division under G.C.P., Munsong.
Lifting of BEML make surveyed off SDL BL10C/B10058 from underground to surface at Ningha Colliery under Satgram-Sripur Area
Annual Comprehensive, Preventive and Corrective Maintenance Contract of Air Conditioners at SVSPA, Barrackpore for FY 2026-2027. (1st Call)
WBPHE/EE/JMD/NIeT 08_74 OF 2026-2027
Contruction of Bathing Ghat near Manasa Mandir Payra Para at Aladarput-II Sansad.JL-576,PLOT-40-41
Installation of New 80 Ltr. Storage Water Cooler.
Ensure to upload the signed & stamped scope of work
SITC of New Air Conditioning system with allied EI Work at Bankura Sub-Division-I, Social Sector Office in the Dist. of Bankura.
CC ROAD FROM JAGANNATHPUR RATAN MISHRA POND TO NARAYAN MANDAL HOUSE PLOT NO.-53 UNDER BOOTH NO 230 - Baligeria Madan Mohan Aadarsha vidyapith
SOLAR LIGHTS FROM RAIPUR KOMOR PUKUR PAR,PATAKA BEDI AND RAIPUR VILLAGE VARIOUS PLACE 4NOS BOOTH NO 21 APAS/01/268/21/0006
Installation of High mast light in front of Samir Hazra House within PS No 241
Replacement of fan for different buildings under KMC Electrical Sub Division PW Dte
REPAIRING OF KHALDHARI ROAD (PORTION) AND ADJACENT AREA (IN PATCHES) IN WD-140 UNDER BR-XV.
Repairing of potholes from Jhatidanga F.P School to Jhatidanga Saban factory road under Asansol Dakshin AC.
Repairing of Ghoshpara Road from 0 km to 0.50 km 4 km to 5 km 6 km to 7 km and 8 km to 11 km in patches by providing repairing pot holes by Bituminous pot holes repairing pot holes by premixed carpeting and seal coat type B under Barrackpore Division
Repairing and servicing of 125 KVA KOEL Green DG Set installed at Kotulpur Rural Hospital, Kotulpur in the District of Bankura.