| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.7 LAccepted-AOC | L1 | Accepted-AOC 1st lowest | |
| 2 | L2₹6.8 L+₹15,454 (2.31%)Rejected-AOC KAVIKKUNNEL H KUNNACKAL P O MUVATTUPUZHA | MUVATTUPUZHA | KERALA | L2 | Rejected-AOC 2nd lowest | |
| 3 | L3₹7.2 L+₹55,160 (8.25%)Rejected-Finance | L3 | Rejected-Finance L3 Reject | |
| 4 | L4₹7.3 L+₹60,616 (9.07%)Rejected-Finance | L4 | Rejected-Finance L4 Reject | |
| 5 | L5₹7.5 L+₹81,247 (12.2%)Rejected-Finance | L5 | Rejected-Finance L5 Reject |
Tender Value
Refer Docs
EMD Value
₹20,100
Closing Date
15 Feb 2021, 6:00 pmClosed
Assistant Executive Engineer
Assistant Executive Engineer, Additional Irrigation Subdivision, Aluva, 683101
SDRF- -Desilting of Manayathukad chal and connecting thodes in Pallippuram Grama Panchayath
2021_Irrig_413198_1
/AISD/ALV/13/ET/2020-21/S Tender
Open Tender
Civil Works - Others
Item Rate
120 days
Pallippuram
Please refer Tender documents.
7 documents required · 7 mandatory
₹3,360
₹20,100
Yes
20 Apr 2021
8 Feb 2021
18 Feb 2021
8 Feb 2021
15 Feb 2021
8 Feb 2021
Amount
Scheme 1 (0m to 50m) starts from north side of gramina vayana shala taken as 0 M
2.6.1 : Earth work in all kinds of soil excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed as directed by the departmental officer at site.
scheme 2 50 M to 150 M
2.6.1 : Earth work in all kinds of soil excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed as directed by the departmental officer at site.
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared as directed by the departmental officer at site.
Scheme 3 150 M to 250M
2.6.1 : Earth work in all kinds of soil excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed as directed by the departmental officer at site.
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared as directed by the departmental officer at site.
Scheme 250M to 350 M
2.6.1 : Earth work in all kinds of soil excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed as directed by the departmental officer at site.
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared as directed by the departmental officer at site.
Scheme 5 350 M to 450 M
2.6.1 : Earth work in all kinds of soil excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed as directed by the departmental officer at site.
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared as directed by the departmental officer at site.
scheme 6 450 M to 550 M
2.6.1 : Earth work in all kinds of soil excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed as directed by the departmental officer at site.
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared as directed by the departmental officer at site.
Scheme 7 (Thoomp) 550m to 650m
2.6.1 : Earth work in all kinds of soil excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed as directed by the departmental officer at site.
Scheme 8 from 650 M to 690 Mriverside (Left side of thoomp)
2.6.1 : Earth work in all kinds of soil excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed as directed by the departmental officer at site.
Scheme 9 from 690 M to 730 M
2.6.1 : Earth work in all kinds of soil excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed as directed by the departmental officer at site.
Scheme 10 730M to 770M
2.6.1 : Earth work in all kinds of soil excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed as directed by the departmental officer at site.
Scheme 11 770 m- 810M
2.6.1 : Earth work in all kinds of soil excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed as directed by the departmental officer at site.
Scheme 12 850M to 875M
2.6.1 : Earth work in all kinds of soil excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed as directed by the departmental officer at site.
George Kutty
T A JOSEPH
ANEESH.C.S
P.C TOMY
BENNYTHOMAS
GEORGE GEORGE
DAISY JOSE
ROY MON K E
A T SANTHOSH
Bidder Name
DAISY JOSE
BENNYTHOMAS
T A JOSEPH
THOMAS RAJU K J
A T SANTHOSH
George Kutty
ANEESH.C.S
P.C TOMY
GEORGE GEORGE
ROY MON K E
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_587021.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .