| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.0 LAdmitted-Finance | ₹39.0 L | L1 | Admitted-Finance |
| 2 | L2₹41.9 L+₹2.9 L (7.34%)Admitted-Finance | ₹41.9 L+₹2.9 L (7.34%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | JAI SRI RAM ASSOCIATE L2 | M/S S&R Construction L1 |
|---|---|---|---|---|---|
| 1.00 | Demolition of brick work built in cement mortar complete all as specified and directed | 55 | Cum | 293 ₹16,115 | 100 ₹5,500 Lowest |
| 2.00 | Demolition cement concrete(un reinforced)in ground floor and packing n exc 15 cm thickness (bellower above ground level)complete all as specified and directed | 50 | Cum | 488 ₹24,400 | 120 ₹6,000 Lowest |
| 3.00 | Demolition of Roof,floors (Other than ground floors ) beams,Staircase ,landing chajja, and similar suspended work in cement concrete is reinforforced (reinforcement cut as required to facilotate demolition complete all as specified and directed | 1.5 | Cum | 975 ₹1,462.5 Lowest | 2,500 ₹3,750 |
| 4.00 | Taking down cement plaster from brick wall including racking out joints hacking for key and scrubbing down with water upto 12.00 m ht. complete all as specified and directed | 1,200 | Sqm | 7 ₹8,400 Lowest | 20 ₹24,000 |
| 5.00 | Dismantling asbestos cement (corrugated,semi corrugated etec ) sheets in roof covering . complete all as specified and directed | 635 | Sqm | 20 ₹12,700 Lowest | 25 ₹15,875 |
| 6.00 | Dismantling wrought iron or mild steel work of any description not otherwise provided for complete all as specified and directed | 3 | Qtl | 488 ₹1,464 | 200 ₹600 Lowest |
| 7.00 | Dismantling of wooden scantling work of any description and size not otherwise provided for complete all as specified and directed. | 0.8 | Cum | 1,463 ₹1,170.4 Lowest | 3,500 ₹2,800 |
| 8.00 | M & L for brick work with sub class ‘B’ brick straight or curved on plan exc 6 Mtr mean radius built in CM (1:6) complete all as specified and directed | 38 | Cum | 3,413 ₹1,29,694 | 2,700 ₹1,02,600 Lowest |
| 9.00 | M&L Removing Cement mortar or cement lime mortarr from and cleaning bricks, stacking for measurement including all extra handling and removal and disposing off rubbish complete all as specified and directed | 6.8 | 1000 Nos | 1,268 ₹8,622.4 | 600 ₹4,080 Lowest |
| 10.00 | All as per item no 7 above but expect bricks complete all as specified and directed | 17 | Cum | 2,340 ₹39,780 | 1,400 ₹23,800 Lowest |
Tender Value
₹43 L
EMD Value
₹86,000
Closing Date
4 Aug 2026, 6:00 pmClosed
GE (WEST) BAREILLY
GE (WEST) BAREILLY
REPAIR TO ROOF SHEET, PARAPET WALLS, PLASTERING WORKS RAIN WATER PIPE LINES, PLINTH PROTECTION AND BRICK WORK IN ZONE VI AND VII UNDER GE (WEST) BAREILLY.
2026_MES_775880_1
8385/C/E8
Open Tender
Civil Works
Item Rate
270 days
GE (WEST) BAREILLY
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE (WEST) BAREILLY
₹86,000
Yes
10 Aug 2026
2 Jul 2026
6 Aug 2026
2 Jul 2026
4 Aug 2026
17 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition of brick work built in cement mortar complete all as specified and directed | 55 | Cum | -1 | - |
| 2 | Demolition cement concrete(un reinforced)in ground floor and packing n exc 15 cm thickness (bellower above ground level)complete all as specified and directed | 50 | Cum | -1 | - |
| 3 | Demolition of Roof,floors (Other than ground floors ) beams,Staircase ,landing chajja, and similar suspended work in cement concrete is reinforforced (reinforcement cut as required to facilotate demolition complete all as specified and directed | 1.5 | Cum | - | - |
| 4 | Taking down cement plaster from brick wall including racking out joints hacking for key and scrubbing down with water upto 12.00 m ht. complete all as specified and directed | 1,200 | Sqm | 1 | ₹1,200 |
| 5 | Dismantling asbestos cement (corrugated,semi corrugated etec ) sheets in roof covering . complete all as specified and directed | 635 | Sqm | 2 | ₹1,270 |
| 6 | Dismantling wrought iron or mild steel work of any description not otherwise provided for complete all as specified and directed | 3 | Qtl | 3 | ₹9 |
| 7 | Dismantling of wooden scantling work of any description and size not otherwise provided for complete all as specified and directed. | 0.8 | Cum | 3 | ₹2.4 |
| 8 | M & L for brick work with sub class ‘B’ brick straight or curved on plan exc 6 Mtr mean radius built in CM (1:6) complete all as specified and directed | 38 | Cum | 3 | ₹114 |
| 9 | M&L Removing Cement mortar or cement lime mortarr from and cleaning bricks, stacking for measurement including all extra handling and removal and disposing off rubbish complete all as specified and directed | 6.8 | 1000 Nos | 4 | ₹27.2 |
| 10 | All as per item no 7 above but expect bricks complete all as specified and directed | 17 | Cum | 4 | ₹68 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
COMPLETETENDER8385.pdf
Tender Documents • 1.77 MB
BOQ_868822.xls
BOQ • 2.87 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .