| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹14.4 LAdmitted-Finance 5 HANDWARA HANDWARA HANDWARA KUPWARA JAMMU KASHMIR 193221 | KUPWARA | JAMMU AND KASHMIR | 193221 | -30.79% | ₹14.4 L | L1 | Admitted-Finance |
| 2 | L2₹15.3 LAdmitted-Finance | -26.51% | ₹15.3 L | L2 | Admitted-Finance |
| 3 | L3₹15.4 LAdmitted-Finance | -26.10% | ₹15.4 L | L3 | Admitted-Finance |
| 4 | L4₹15.4 LAdmitted-Finance | -26.00% | ₹15.4 L | L4 | Admitted-Finance |
| 5 | L5₹15.5 LAdmitted-Finance | -25.57% | ₹15.5 L | L5 | Admitted-Finance |
Updated dates
Tender Value
₹20.8 L
EMD Value
₹41,680
Closing Date
31 Jan 2026, 4:00 pmClosed
Executive Engineer RnB Division
SUMBAL SONAWARI
Construction of elementary 2 No ACRS at Govt. Primary School Muqdam Mohalla Gundiboon.
2026_PWDJK_300469_4
NIT NO 69 OF 2025-26 SUMBAL DIVISION
Open Tender
Civil Works
60 days
SUMBAL SONAWARI
Please refer Tender documents.
2 documents required · 2 mandatory
₹800
Executive Engineer RnB Division
₹41,680
11 Feb 2026
12 Jan 2026
2 Feb 2026
12 Jan 2026
31 Jan 2026
12 Jan 2026
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, in all kinds of soil
Filling available excavated earth in trunchs , plinth sides of foundaction in layers not excading 20cm in depth consolidating each deposited layer by ramming and watering lead upto 50m and lift upto 1.5m
Providing and laying Stone solling/GSB Nallah makh/Quarry makh or 2nd class sand in Foundation treches / inside plinth including compacting, watering including all carriages of material and head load complete.
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) all complete
Providing and laying in position specified grade 1:1.5:3 of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level incl. all complete
Providing and laying in position cement concrete of specified grade including the cost of centering and shuttering. All work up to plinth level1:2:4 (1Cement: 2 fine sand: 4 grade stone aggregate 20mm nominal size) all complete
Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, Coloumns, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Brick work with FPS bricks of class designation 75 in super structure up to all floors. Including carraige and head load of Bricks In cement mortar 1cement: 6 fine sand mortar.including cost Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level
Providing and fixing of wood work in frames of doors windows clestory windows wrought frame of first class imported kail wood
Providing and fixing 40 x5mm flat iron hold fast including fixing of frames with nuts and bolts.
Centering and shuttering including strutting propping etc. removal of form work in: Foundation ,Plinth Beams DPC
Centering and shuttering including strutting propping etc. removal of form work in: Beams,lintels, and suspanded floors:-
Supplying, cutting, bending to shape, fabricating, fixing and tying in position TMT Reinforcement Steel at all levels and location as shown in the structural drawing. The rate shall include cost of supply & tying reinforcement with GI binding wire.
Structural steel work welded in built up sections and frame work including cutting, hoisting fixing in position all complete in angles / flats / tubes etc. including fixing of MS sheets in sofffits and eveas boarding including ms frame work and incl. cast of steel pimer all complete
Providing and Fixing of Colour Coated GI sheet roofing including cost of Screws hooks, washers nails 0.50mm thick.including cost of overlapped GI sheets etc cll complete
Providing and Fixing of ridges hips / valleys 60cm vide of colour G.I sheets including cost screws/washers all complete job.
15mm thickcement Plaster in 1:6 mixture etc all complete
Providing and applying white cement based putty/POP of specified thickness, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete.2MM THICK
Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 40mm thick incl. 40mm wide glass strips
Providing and fixing of 30-32mm thick panelled glazed shutters for window of 1st class imported wood[KD] including cost of MS butt hinges and screws all complete job
Extra on item no-20 Towards the cost 3.5mm thick glass panes incl. cast of beadings @ 80% = 157.44 x 0.80 =125.95
Extra For Fixing of Decorative ply wood /Catlum in door shutters
Providing / Fixing of Hardware items:- 150mm T BOLTS
100mm Tbolts
100mm HANDLES
L-DROPS
Finishing walls with Exterior waterproof cement paint of approved quality and make including priming coat.
Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade. New work (two or more coats) over and including priming coat with cement primer
Applying priming coat with ready mixed pink or grey primer of approved brand and manufacture on work.
Painting of doors and windows with ready mixed synthetic enamel paint of approved brand and manufacture in all shades.
Providing and fixing 10mm thick ply board celling incl. the cast of wooden jamping / fram work for supporting structure of first class imported wood 1.5''x1.5'' etc complete job
Providing and fixing celling joist of first class Budlo wood etc complete job
Carriage of material by Mechenical transport form source to site: Cement avg lead upto 5km
Aggragate avg lead upto 20km
Sand avg lead upto 10km
Bricks avg lead upto 50km
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.15 MB
BOQ_974722.xls
BOQ • 0.47 MB
Download all tender documents and submit your bid