Executive Engineer Nadiad Irrigation Division Nadiad
Modernization of Various VRB At Ch 13980, 8450 and 4400 Ft On radhvanaj Minor Ex Matar Branch Canal
353948
Tender Notice No. 08 of 2026-2027
Open
Civil - All
Works
Kheda
13 documents required · 12 mandatory · 1 optional
₹1,500
Executive Engineer Nadiad Irrigation Division Nadiad
₹27,000
9 Oct 2026
9 Oct 2026
9 Oct 2026
23 Oct 2026
9 Oct 2026
Bill Of Quantities
Modernization of Various VRB At Ch 13980, 8450 & 4400 Ft On radhvanaj Minor Ex Matar Branch Canal
Name of work :-
Estimated Rate without Total Amount Without
Estimated Rate without Total Amount Without
Sr.No Quntity Total Qty Item Unit
Sub Estimate Sub Estimate Sub Estimate In figures In World
Dismantling the existing brick masonry Rs. Seven
including sorting out and stacking the useful Hundred Fifty
material and removing the debris and making & Ninety
1 8.80 23.50 16.20 48.50 good the damages etc. complete as directed. In CM 750.90 Paise Only
Dismantling the existing R.C.C. Pipes
including sorting out and stacking of the
useful materials of the following diameters
including refilling the trenches etc. complete
c) 600 mm. to 900 mm. Rs. Eight
a)150 mm to 400 mm Rs. Three
Dismantling the C.C. lining including Rs. Twenty
including disposing off the dismentalled Nine & Eighty
3 127.80 127.80 127.80 383.40 materials as directed etc. complete.(a)7.50 cm SM 29.80 Paise Only
Excavation for foundation in all sorts of soil Rs. One
including yellow sandy gravelly soils ,soft & Hundred Two
hard murrum etc. in dry condition including & Forty Paise
depositing the excavated stuff in uniform Only
layers in banks or as and where directed etc.
complete for lead up to 500m and all lift. (BY
MACHINERY)(a)Excluding dewatering.
Providing & Laying in position "DESIGN MIX"
cement concrete using cement sand and
crushed aggregate for C.C./ R.C.C work by
"FLORI" including necessary formwork,
centering, scaffolding, compaction by vibrator,
5 curing as directed with all lead & lift etc
complete without dewatering and excluding
the cost of steel reinforcement.
A) For Footing of column / Abutment / Pier
/ Bottom slab of barrel / Plinth course /
Coping / Approach Slab etc.
54.60 49.10 51.20 154.90 (a) Concrete grade M-15 and MSA-20 mm CM 4190.00 Ninety Only
23.80 23.80 15.90 63.50 (e) Concrete grade M-25 and MSA-20 mm CM 4651.00
(B) For Pier and Abutments / Wing wall /
Head wall / Return wall / Dowel Wall etc.
22.60 20.60 22.60 65.80 (g) Concrete grade M-15 and MSA-20 mm CM 4457.00 Hundred Fifty
(E) For Column / Beam / Solid Slab of Road
Bridge / Barrel / Cutoff wall etc.
23.70 24.70 17.20 65.60 (q) Concrete grade M-25 and MSA-20 mm CM 5642.00
Providing & Placing in position reinforcement Rs. Seven
bars including cutting, bending, welding joints Thousand
where necessary, hooking etc. complete as QT One Hundred
per drawing for all lead and lifts.(A)TMT / CRS Ninety Four
Providing and laying in position 110 mm dia (6 Rs. Two
kgf/sq cm) P.V.C. Pipe for weep holes with Hundred
non corroding jali in abutments, wing walls, RMT Sixty Two &
retaining walls etc. complete. Fifty Paise
Providing and fixing 110 mm diameter Rs. Three
P.V.C..Pipe (6 kgf / sqcm) Water spout with Hundred
necessary iron gratting as per design Sixty Nine &
Backfilling the foundation trenches around the Rs. Thirty Six
structures etc with selected excavated stuff & Ninety
including watering, ramming, compacting etc. CM Paise Only
complete. (By Machinery)
Providing temporary all weather and fair Rs. Ten
weather diversion suitable for traffic during the Thousand
construction period of the bridge including Nine
10 1.00 1.00 1.00 3.00 providing necessary drains and all safty NO. 10965.05 Hundred
measures including red lamps/ signals at night
for traffic etc. comp.
Reparing of steel gate including providing Rs. One
basic steel material; M.S. Shaft plate, angles, Hundred
channels etc. incl. fabriction transporting to Kg Twenty Seven
site & erection and painting etc. complete. & Twenty
Providing and fixing the iron rod for steel Rs. One
gates including providing big size thread and Thousand
12 0.00 1.20 2.40 3.60 finishing as required etc comp.a- dia of bar 38 Rmt 1268.50 Two Hundred
mm rod Sixty Eight &
Providing and fixing heavy duty thrust bearing Rs. Eight
for following dia as directed etc comp.a- for 38 Hundred
13 0.00 3.00 2.00 5.00 mm dia and 50 mm dia bar and ID/OD 65mm No. 800.00 Only
Providing and fixing heavy duty CI nut for Rs. One
steel gates as directed etc comp.a- for 38 mm Thousand
14 0.00 1.00 2.00 3.00 dia rod and height of nut is 120 x 120 x 100 No. 1300.00 Three
cutting Hundred
Providing and fixing in position (different Rs. Five
diameter) IS NP-2 class R.C.C pipe with collar Hundred
including filling and caulking the joints with Thirty Five &
15 0.00 10.00 20.00 30.00 cement mortar 1:1 proportion , finishing to Rmt 535.80 Eighty Paise
design grade and level curing etc. complete
for all leads and lifts
Providing and fixing the iron rod for steel Rs. One
gates including providing big size thread and Thousand
finishing as required etc comp.b- dia of bar Seven
50mm rod Hundred
Providing and fixing heavy duty CI nut for Rs. Two
steel gates as directed etc comp.b- for 50mm Thousand
and 63 mm dia rod land height of nut is 160 x Seven
160 x 120 cutting Hundred
Providing drone videography on the ocassion Rs. Four
of function or for before/on going/after Thousand
18 1.00 1.00 1.00 3.00 completion of construction work as directed by No. 4000.00 Only
engineer in charge.
Total Rs…(Without GST)
Rs. Twenty Six Lac Seventy Nine Thousand Nine Hundred One & Seventy Seven Paise Only
I / We am / are willing to carry out the work at………………..% above / below precent.
(Should be written in figure and words) of the estimate reates mentioned above.
Amount of my / our tender works out as under.
Estimated amount put Estimated amout put
to tender Rs……………. to tender Rs……………..
Deduct …………..% Add………………%
below Rs………… Above Rs……………
Net Rs……………….. Total Rs…………….
In words…………………………….. In words………………
Notes 1 -The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge for which no extra payment
Notes 2 - The labour cess will be deducted as per prevailing rules i.e.1% of the work done.
Notes 3 - GST and Income tax TDS will be deducted at a source while making payments of bills
Note 4 - In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt.G.R.:PRC-
10/2017CementConsumption/16/CDate:11/05/2017asstatedin
S.O.R. there fore in R.C.C. items where there is a change as per actual mix design the cost
of difference of cement consumption have been deducted from the rate of original item at the rate of input rate mentioned in all the tender.
Note 5 - Basic Rate for Cement Difference Calculation of Mix Design (Rate as per CGWRD SOR 2022-23)
Deputy Executive Engineer Divisional Account Officer
Matar Irrigation Sub Division Nadiad Irrigation Division
Executive Engineer
Nadiad Irrigation Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1 Front Page.-PQ.pdf
2 Notice Inviting online Tender-PQ.pdf
3.SBD-Documen without PQ final.pdf
4 BOQ.pdf
5- cEMENT.pdf
6- Steel.pdf
7- PA.pdf
8. other specification.pdf
9. Techanical Specification.pdf
10. material test schedule.pdf
Tender Notice No. 08 of 2026-2027.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .