| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹29.5 LAccepted-Finance | ₹29.5 L | L-1 | Accepted-Finance LOW RATE |
| 2 | L-2₹30.7 L+₹1.2 L (3.96%)Rejected-Finance | ₹30.7 L+₹1.2 L (3.96%) | L-2 | Rejected-Finance HIGH RATE |
| 3 | L-3₹31.2 L+₹1.7 L (5.60%)Rejected-Finance HALDWANI NAINITAL | ₹31.2 L+₹1.7 L (5.60%) | L-3 | Rejected-Finance HIGH RATE |
| 4 | L-4₹31.3 L+₹1.8 L (5.98%)Rejected-Finance | ₹31.3 L+₹1.8 L (5.98%) | L-4 | Rejected-Finance HIGH RATE |
| 5 | L-5₹31.3 L+₹1.8 L (6.12%)Rejected-Finance BAGESHWAR UTTARAKHAND UT | ₹31.3 L+₹1.8 L (6.12%) | L-5 | Rejected-Finance HIGH RATE |
| Sl No | Description | Qty | Unit | Kamar Alam and Company L8 | MUNAWWAR ALI L6 | Sanjay Pandey L3 | Bijendra Pal Singh Ginti L10 | mohd danish contractor L4 | ABHIJOT CONSTRUCTION L2 | PSB Infra L1 | ADAN CONSTRUCTION L11 | COMPLETE CONSTRUCTION L9 | PRATAP PURI L5 | AJ CONSTRUCTION AND SUPPLIER L7 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.All kinds of soil | 91 | Sqm | 20 ₹1,820 Lowest | 23 ₹2,093 | 24.89 ₹2,264.99 | 25 ₹2,275 | 22.57 ₹2,053.87 | 22.57 ₹2,053.87 | 21 ₹1,911 | 28 ₹2,548 | 20 ₹1,820 Lowest | 22.42 ₹2,040.22 | 23.11 ₹2,103.01 |
| 2.00 | Earth work in excavation by mechanical means (Hydraulic Excavat in foundation trenches or drains (not exceeding 1.5 m in width or 1 including dressing of sides and ramming of bottoms, lift upto 1.5 out the excavated soil and disposal of surplus excavated soil as direction of Engineer in charge upto 50 m distance.(All kinds of soil.) | 175.5 | Cum | 200 ₹35,100 | 175 ₹30,712.5 | 189.71 ₹33,294.11 | 180 ₹31,590 | 172.06 ₹30,196.53 | 172.06 ₹30,196.53 | 160 ₹28,080 Lowest | 210 ₹36,855 | 180 ₹31,590 | 170.96 ₹30,003.48 | 176.14 ₹30,912.57 |
| 3.00 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 149.39 | Cum | 100 ₹14,939 Lowest | 132 ₹19,719.48 | 142.85 ₹21,340.36 | 166 ₹24,798.74 | 129.48 ₹19,343.02 | 129.56 ₹19,354.97 | 120 ₹17,926.8 | 160 ₹23,902.4 | 100 ₹14,939 Lowest | 128.7 ₹19,226.49 | 132.63 ₹19,813.6 |
| 4.00 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 5.66 | Cum | 1,100 ₹6,226 Lowest | 1,421 ₹8,042.86 | 1,547 ₹8,756.02 | 1,800 ₹10,188 | 1,403.22 ₹7,942.23 | 1,403.84 ₹7,945.73 | 1,300 ₹7,358 | 1,799 ₹10,182.34 | 1,700 ₹9,622 | 1,394.84 ₹7,894.79 | 1,437 ₹8,133.42 |
| 5.00 | Providing and laying in position cement concrete of specified grade 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size).All work upto plinth level | 21.41 | Cum | 5,100 ₹1,09,191 | 4,560 ₹97,629.6 | 4,000 ₹85,640 Lowest | 4,800 ₹1,02,768 | 4,502.16 ₹96,391.25 | 4,502.85 ₹96,406.02 | 4,100 ₹87,781 | 5,500 ₹1,17,755 | 4,200 ₹89,922 | 4,473.98 ₹95,787.91 | 4,609 ₹98,678.69 |
| 6.00 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:Cement mortar 1:6 (1 cement : 6 coarse sand) | 20.29 | Cum | 5,500 ₹1,11,595 | 4,775 ₹96,884.75 | 4,500 ₹91,305 | 5,200 ₹1,05,508 | 4,714.32 ₹95,653.55 | 4,714.54 ₹95,658.02 | 4,400 ₹89,276 Lowest | 5,900 ₹1,19,711 | 5,400 ₹1,09,566 | 4,684.32 ₹95,044.85 | 4,826 ₹97,919.54 |
| 7.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 3.29 | Cum | 6,200 ₹20,398 | 5,275 ₹17,354.75 | 5,742 ₹18,891.18 | 5,800 ₹19,082 | 5,207.28 ₹17,131.95 | 5,207.82 ₹17,133.73 | 4,900 ₹16,121 Lowest | 6,676 ₹21,964.04 | 5,000 ₹16,450 | 5,174.43 ₹17,023.87 | 5,331 ₹17,538.99 |
| 8.00 | Providing and laying in position specified grade of reinforced cement Concrete Work upto plinth level 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 35.26 | Cum | 6,800 ₹2,39,768 | 6,057 ₹2,13,569.82 | 6,592 ₹2,32,433.92 | 6,500 ₹2,29,190 | 5,979.39 ₹2,10,833.29 | 5,979.39 ₹2,10,833.29 | 5,500 ₹1,93,930 Lowest | 7,400 ₹2,60,924 | 5,800 ₹2,04,508 | 5,941.06 ₹2,09,481.78 | 6,121 ₹2,15,826.46 |
| 9.00 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). | 7.96 | Cum | 7,600 ₹60,496 | 7,265 ₹57,829.4 | 7,909 ₹62,955.64 | 7,500 ₹59,700 | 7,155.72 ₹56,959.53 | 7,173.46 ₹57,100.74 | 6,700 ₹53,332 | 9,174 ₹73,025.04 | 6,600 ₹52,536 Lowest | 7,127.47 ₹56,734.66 | 7,326 ₹58,314.96 |
| 10.00 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size). | 30.73 | Cum | 7,800 ₹2,39,694 | 7,702 ₹2,36,682.46 | 7,000 ₹2,15,110 | 8,000 ₹2,45,840 | 7,605 ₹2,33,701.65 | 7,605.33 ₹2,33,711.79 | 7,100 ₹2,18,183 | 9,700 ₹2,98,081 | 6,600 ₹2,02,818 Lowest | 7,556.58 ₹2,32,213.7 | 7,786 ₹2,39,263.78 |
Tender Value
₹40.1 L
EMD Value
₹80,300
Closing Date
3 Aug 2026, 12:00 pmClosed
EE RWD NAINITAL
EE RWD NAINITAL (VIKAS BHAWAN BHIMTAL)
New construction work of Central Warehouse Haldwani.
2026_RES_97727_2
567/RWD/02-LEKHA/2026-27 DT-15-07-2026
Open Tender
Civil Works - Buildings
Item Rate
180 days
HALDWANI
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
TENDER PEES RS 3000 PAYBLE AT 0515
₹80,300
12 Aug 2026
17 Jul 2026
3 Aug 2026
17 Jul 2026
3 Aug 2026
17 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.All kinds of soil | 91 | Sqm | 28.94 | ₹2,633.54 |
| 2 | Earth work in excavation by mechanical means (Hydraulic Excavat in foundation trenches or drains (not exceeding 1.5 m in width or 1 including dressing of sides and ramming of bottoms, lift upto 1.5 out the excavated soil and disposal of surplus excavated soil as direction of Engineer in charge upto 50 m distance.(All kinds of soil.) | 175.5 | Cum | 220.59 | ₹38,713.55 |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 149.39 | Cum | 166.1 | ₹24,813.68 |
| 4 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 5.66 | Cum | 1,799.79 | ₹10,186.81 |
| 5 | Providing and laying in position cement concrete of specified grade 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size).All work upto plinth level | 21.41 | Cum | 5,772.88 | ₹1,23,597.36 |
| 6 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:Cement mortar 1:6 (1 cement : 6 coarse sand) | 20.29 | Cum | 6,044.28 | ₹1,22,638.44 |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 3.29 | Cum | 6,676.69 | ₹21,966.31 |
| 8 | Providing and laying in position specified grade of reinforced cement Concrete Work upto plinth level 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 35.26 | Cum | 7,665.89 | ₹2,70,299.28 |
| 9 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). | 7.96 | Cum | 9,174.42 | ₹73,028.38 |
| 10 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size). | 30.73 | Cum | 9,750.42 | ₹2,99,630.41 |
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
finance_115383.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.73 MB
BOQ_115383.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .