Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.4 LAccepted-AOC NO14 MSF BUILDING NO 14 2 FLOOR MSF BUILDING OPP CHURCH BYE PASS JUNCTION AROOR P O ALAPPUZHA DIST KER ALLAPUZHA KERALA | L1 | Accepted-AOC L1 | |
| 2 | Rejected-Technical | - | Rejected-Technical Technically not acceptable |
Tender Value
Refer Docs
EMD Value
₹12,000
Closing Date
28 Nov 2022, 2:30 pmClosed
Varghese P.O
SM(P and P)-CD
Supply, Installation and configuration of CCTV Networking System at new NP Plant and Ammonia handling Sites at FACT-CD, Ambalamedu.
2022_FACT_721954_1
04028/2022-2023/E26311
Open Tender
Miscellaneous Works
Item Rate
105 days
AMBALAMEDU
As per tender documents
7 documents required · 7 mandatory
₹0
₹12,000
Yes
16 Dec 2022
5 Nov 2022
29 Nov 2022
5 Nov 2022
28 Nov 2022
5 Nov 2022
Supply, Installation and configuration of CCTV Networking System at new NP Plant and Ammonia handling Sites at FACT-CD,Ambalamedu.
Supply & laying of Armoured CAT6 cable inside HDPE conduit (32mm). The work includes supply of CAT6 Armoured cable and laying the same overhead through HDPE conduit. Any route taken above ground viz. on compound walls or along steel girders or structural or cable ducts or cables tray shall be considered as overhead route. After laying the conduit shall be properly tied/fixed using proper aluminium clamps/cleats so that any kind of hanging /sagging shall be avoided. Breaking the wall/floor drilling holes to fix the clamps/ installing the conduit, laying the cable and plastering the wall shall be done by the contractor as required. Metal steel tags shall be used for identification of OFC/Cat 6 cables laid through overhead routes. Bidder shall supply and use the CAT6 cable as per Annexure IV A. Other materials like aluminium clamps/ cleats and metal tag required for the work shall also be supplied by the bidder.
Supply & laying of OFC 6 core cable inside HDPE conduit (32mm). The work includes supply of OFC 6 core cable and laying the same overhead through HDPE conduit. Any route taken above ground viz. on compound walls or along steel girders or structural or cable ducts or cables tray shall be considered as overhead route. After laying the conduit shall be properly tied/fixed using proper aluminium clamps/cleats so that any kind of hanging /sagging shall be avoided. Breaking the wall/floor drilling holes to fix the clamps/ installing the conduit, laying the cable and plastering the wall shall be done by the contractor as required. Metal steel tags shall be used for identification of OFC/Cat 6 cables laid through overhead routes. Bidder shall supply and use the OFC 6 core cable as per Annexure IV B. Other materials like aluminium clamps/ cleats and metal tag required for the work shall also be supplied by the bidder.
Supply & laying of OFC 4 core cable inside HDPE conduit (32mm). The work includes supply of OFC 4 core cable and laying the same overhead through HDPE conduit. Any route taken above ground viz. on compound walls or along steel girders or structural or cable ducts or cables tray shall be considered as overhead route. After laying the conduit shall be properly tied/fixed using proper aluminium clamps/cleats so that any kind of hanging /sagging shall be avoided. Breaking the wall/floor drilling holes to fix the clamps/ installing the conduit, laying the cable and plastering the wall shall be done by the contractor as required. Metal steel tags shall be used for identification of OFC/Cat 4 cables laid through overhead routes. Bidder shall supply and use the OFC 4core cable as per Annexure IV C. Other materials like aluminium clamps/ cleats and metal tag required for the work shall also be supplied by the bidder.
Supply & Laying of Armoured XLPE power cable 3 core * 2.5 mm2 through HDPE conduits of 32mm size as per attached specification in Annexure-IV D.
Supply & Installation of outdoor weather housing (IP 65) Panel/Rack suitable for Installing Camera adaptors / Media converter with Adaptor / L2 switch/ Splice Box as per attached specification in Annexure-IV E. These panels are to be used as the outdoor units (U1, U2, U3) which houses various components as shown in Annexure II (A&B) scheme drawing.
Supply, Installation & Configuration of Managed L2 Industrial switch with minimum 4SFP ports & minimum 8 POE+ ports as per attached specification in Annexure-IV F.
Supply, Installation & Configuration of Industrial Media convertor-Fibre to 1Ethernet as per attached specification in Annexure-IV G
Supply & Laying of HDPE conduit for cables as per attached specification in Annexure-IV H.
Supply & Erection of 8 meter heavy duty pole with RCC foundation as per attached specification in Annexure-IV I. Note : Vendor to provide Wind speed Load calculations.
Supply of 1000BASE-LX SFP Module.
Supply of SC-LC Style single mode duplex patch cord, 3 meters.
Installation & Configuration of PTZ Cameras , Network elements and Integration with existing network (For New Ammonia Tank Location – Camera P15,P16 –scheme as per Annexure III A)The installation/integration work involves:- (i) Installation of PTZ Camera along with its Power and network connection as follows:-. Camera P15: To be installed on new Pole Camera P16: To be installed on existing Flare stack. (ii) All CAT6/OFC/Power cables shall be properly routed/ glanded at the various Outdoor units/Panels as per the scheme in Annexure-II A. (iii) Installation of L2 switch, Splice Box, Camera Adapters ( For P15 & P16) Surge protectors, MCB’s inside the outdoor unit (U1). (iv) All power wiring connections for Camera Power supply through Surge protector and MCB’s inside the Outdoor unit(U1). (v) Connection of Camera Ethernet cables to the L2 switch via Surge protectors inside the Outdoor unit(U1). (vi) Connection of the incoming OFC(6C) cable to the supplied L2 switch via Splice Box , necessary patch cords and SFP Transceiver module inside the Outdoor unit(U1). (vii) Connection of the OFC(6C) cable to the existing L2 switch at ABU-SS Location via existing LIU using necessary patch cords and SFP Transceiver module . Note: The following items are to be supplied by the Vendor:- (i) Surge protectors ,MCB’s for individual cameras (P15&P16) (ii) The Surge protectors for the Camera signal (Ethernet) (iii) Necessary Splice Box and connectors.
Installation & Configuration of PTZ Cameras , Network elements and Integration with existing network (For New NP Plant Location – Camera P17,P18-scheme as per Annexure III B).The installation/integration work involves:- (i) Installation of PTZ Camera along with its Power and network connection as follows:-. Camera P17: To be installed on new Pole Camera P18: To be installed on new Pole (ii) All CAT6/OFC/Power cables shall be properly routed/ glanded at the various Outdoor units/Panels as per the scheme in Annexure-II B. (iii) Installation of L2 switch, Splice Boxes, Camera Adapters (P17 & P18) ,Surge protectors, MCB’s inside the outdoor unit (U2). (iv) All power wiring connections for Camera Power supply through Surge protector and MCB’s inside the Outdoor unit(U2). (v) Connection of the Camera (P17) Ethernet cable to the L2 switch via Surge protector inside the Outdoor unit(U2). (vi) Connection of the incoming OFC (6C) cable to the L2 switch via Splice Box , necessary patch cords and SFP Transceiver module inside the Outdoor unit(U2). (vii) Connection of the OFC (6C) cable to the existing L2 switch at NP MCC Location via existing LIU using necessary patch cords and SFP Transceiver module. (viii) Connection of the OFC (4C) cable from outdoor unit U3 to the L2 switch inside U2 via Splice Box using necessary patch cords and SFP Transceiver module . (ix) Installation of Media convertor, Splice Box, Camera Adapter, MCB’s and surge protectors (for camera P18) inside the Outdoor unit U3. (x) All wiring connections for Camera Power supply. MCB and Surge protectors inside the Outdoor unit(U3). (xi) Connection of Camera Ethernet cables(P18) to the Media convertor switch via Surge protectors inside the Outdoor unit(U3). (xii) Connection of the OFC(4C) cable to the Media Convertor via Splice Box and necessary patch cords inside the Outdoor unit(U3). Note: The following items are to be supplied by the Vendor:- (i) Surge protectors ,MCB’s for individual cameras(P17&P18) (ii) The Surge protectors for the Camera signal (Ethernet) (iii) Necessary Splice Box and connectors
TELENOVA NETWORKS
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_759334.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .