Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹40.6 LAdmitted-Finance | -27.85% | ₹40.6 L | L1 | Admitted-Finance |
| 2 | L2₹43.4 L+₹2.7 L (6.74%)Admitted-Finance | -22.99% | ₹43.4 L+₹2.7 L (6.74%) | L2 | Admitted-Finance |
| 3 | L3₹45.1 L+₹4.4 L (10.9%)Admitted-Finance | -19.99% | ₹45.1 L+₹4.4 L (10.9%) | L3 | Admitted-Finance |
| 4 | L4₹55.2 L+₹14.6 L (35.8%)Admitted-Finance SAILESHREE VIHAR BHUBANESWAR ODISHA 751021 INDIA | KHORDHA | ODISHA | 751021 | -2.00% | ₹55.2 L+₹14.6 L (35.8%) | L4 | Admitted-Finance |
Tender Value
₹56.3 L
EMD Value
₹56,310
Closing Date
5 Sept 2026, 5:00 pmClosed
Executive Engineer
RURAL WORKS DIVISION, BARAGARH
Construction of R.I Office-cum-Residence Building at Agalpur of Barpali Tahasil in the Bargarh District
2026_CERWI_139299_1
ONLINE-BGH-05 of 2026-27
Open Tender
Civil Works - Buildings
Percentage
180 days
Bargarh
Building Work
2 documents required · 2 mandatory
₹10,000
₹56,310
Yes
11 Sept 2026
24 Aug 2026
7 Sept 2026
24 Aug 2026
5 Sept 2026
24 Aug 2026
24 Aug 2026 - 5 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation of foundation in all kinds of soil including dressing and levelling the bed to required depth and width and deposting the excavated materials away from work site as directed by Engineer in charge. | 198.41 | cum | 282.89 | ₹56,127.87 |
| 2 | Filling in foundation and plinth with sand well watered and rammed including cost conveyance and royalty etc. complete. | 91.97 | cum | 716.04 | ₹65,854.2 |
| 3 | Cement Concrete 1 3 6 with 4cm size hard granite metal in Foundation and Plinth. | 48.17 | cum | 5,983.92 | ₹2,88,245.43 |
| 4 | R R H G Stone masonry in cement mortar 1 6 in foundation plinth including cost carriage royalty taxes of all materials required for the work. | 26.67 | cum | 4,401.36 | ₹1,17,384.27 |
| 5 | Brick masonry in C.M 1 6 using Fly ash Bricks of approved size of 25x 12 x 8 cm in Foundation and Plinth . | 41.72 | cum | 5,741.04 | ₹2,39,516.19 |
| 6 | Brick masonry in C.M 1 6 using Fly ash Bricks of approved size of 25x 12 x 8 cm in Superstructure including splays cutting circular moulding etc complete .Ground Floor | 88.09 | cum | 5,774.37 | ₹5,08,664.25 |
| 7 | Brick masonry in C.M 1 6 using Fly ash Bricks of approved size of 25x 12 x 8 cm in Superstructure including splays cutting circular moulding etc complete .First Floor | 32.1 | cum | 6,110.02 | ₹1,96,131.64 |
| 8 | Brick masonry in C.M 1 6 using Fly ash Bricks of approved size of 25x 12 x 8 cm in Superstructure including splays cutting circular moulding etc complete .Second Floor | 13.94 | cum | 6,193.69 | ₹86,340.04 |
| 9 | R.C.C M 25 grade concrete using 20mm down graded chips of approved quality including hoisting lowering laying concrete as per direction of E.I.C A Column Base Grade Beam | 13.97 | cum | 9,110.56 | ₹1,27,274.52 |
| 10 | R.C.C M 25 grade concrete using 20mm down graded chips of approved quality including hoisting lowering laying concrete as per direction of E.I.C B Column in Superstructure Ground Floor | 2.87 | cum | 20,585.13 | ₹59,079.32 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 1.21 MB
Tendernotice_1.pdf
PDF • 0.60 MB
BOQ_606845.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .