Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.1 LAccepted-AOC | ₹20.1 L | L1 | Accepted-AOC successful |
| 2 | L2₹42.8 L+₹22.7 L (112.7%)Rejected-Finance | ₹42.8 L+₹22.7 L (112.7%) | L2 | Rejected-Finance higher bid value |
| 3 | Rejected-Technical SANTIPUR MECHEDA | MECHEDA | PURBA MEDINIPUR | WEST BENGAL | 721137 | - | - | Rejected-Technical JOY GURU ENGINEERING WORKS is technically disqualified due to inadequate credential |
| Sl No | Description | Qty | Unit | M/S UNIQUE ENGINEERING CO L1 | Sane Engineers Co-Operative Society Ltd. L2 |
|---|---|---|---|---|---|
| 1.00PART A | |||||
| 1.01 | PART I: EMIPH : Maximum possible expenditure value in two years and is inclusive of labour charge (i.e. skilled/unskilled workers) as calculated on the basis of wage (Basic + DA) as on 01.01.2025 and all applicable benefits & allowances as per MOS dtd. 04.10.2021 for 2 nos. category workers including O.T charge (maximum 15hrs/head/month) but excluding profit and overhead | 1 | LOT | 2,40,215 ₹2,40,215 Lowest | 16,71,472 ₹16,71,472 |
| 1.02 | PART II: EMOPH : Maximum possible expenditure value in two years and is inclusive of labour charge (i.e. skilled/unskilled workers) as calculated on the basis of wage (Basic + DA) as on 01.01.2025 and all applicable benefits & allowances as per MOS dtd. 04.10.2021 for 1 nos. category workers including O.T charge (maximum 15hrs/head/month) but excluding profit and overhead | 1 | LOT | 8,23,140 ₹8,23,140 Lowest | 8,77,168 ₹8,77,168 |
| 1.03 | PART III: EMOPH : Maximum possible expenditure for two years for the charge of one (01) no. Non-Category worker (Company’s own manpower) | 1 | LOT | 4,64,040 ₹4,64,040 Lowest | 5,06,080 ₹5,06,080 |
| 2.00PART B : Charge for supervisor | |||||
| 2.01 | Maximum possible expenditure for two years for the charge of one (01) no. supervisor (Company’s own manpower) who is common for both EMIPH (16 Days/ month) and EMOPH (10 Days/month) departments | 1 | LOT | 2,88,000 ₹2,88,000 | 8,000 ₹8,000 Lowest |
| 3.00PART C: Profit | |||||
| 3.01 | Profit only on PART A (PART I +PART II) for two years | 1 | LOT | 91,644 ₹91,644 Lowest | 1,01,000 ₹1,01,000 |
| 4.00PART D: Charge of all type of consumables, tools & tackles for two years for both the department (EMIPH & EMOPH) | |||||
| 4.01 | Welding electrode (3.15, ESAB) | 100 | Pkts | 300 ₹30,000 Lowest | 3,500 ₹3,50,000 |
Tender Value
₹39.7 L
EMD Value
₹79,405
Closing Date
13 Feb 2026, 4:00 pmClosed
General Manager (KTPS)
GM (Admin) building, KTPS, Mecheda, Purba Medinipur, 721137
ARC of Man power supply including tools, tackles and consumables for day to day maintenance works at EMIPH and OPH Dept., KTPS for 2 years.
2026_WBPDC_992888_1
GM(K)/CC/EM/2831(Vol. 8)/E3747/25-26
Open Tender
Support/Maintenance Service
Item Rate
730 days
KTPS, Mecheda, Purba Medinipur, 721137
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹79,405
Yes
18 Aug 2026
27 Jan 2026
16 Feb 2026
27 Jan 2026
13 Feb 2026
28 Jan 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1PART A | |||||
| 1.01 | PART I: EMIPH : Maximum possible expenditure value in two years and is inclusive of labour charge (i.e. skilled/unskilled workers) as calculated on the basis of wage (Basic + DA) as on 01.01.2025 and all applicable benefits & allowances as per MOS dtd. 04.10.2021 for 2 nos. category workers including O.T charge (maximum 15hrs/head/month) but excluding profit and overhead | 1 | LOT | - | - |
| 1.02 | PART II: EMOPH : Maximum possible expenditure value in two years and is inclusive of labour charge (i.e. skilled/unskilled workers) as calculated on the basis of wage (Basic + DA) as on 01.01.2025 and all applicable benefits & allowances as per MOS dtd. 04.10.2021 for 1 nos. category workers including O.T charge (maximum 15hrs/head/month) but excluding profit and overhead | 1 | LOT | - | - |
| 1.03 | PART III: EMOPH : Maximum possible expenditure for two years for the charge of one (01) no. Non-Category worker (Company’s own manpower) | 1 | LOT | - | - |
| 2PART B : Charge for supervisor | |||||
| 2.01 | Maximum possible expenditure for two years for the charge of one (01) no. supervisor (Company’s own manpower) who is common for both EMIPH (16 Days/ month) and EMOPH (10 Days/month) departments | - | LOT | - | - |
| 3PART C: Profit | |||||
| 3.01 | Profit only on PART A (PART I +PART II) for two years | - | LOT | - | - |
| 4PART D: Charge of all type of consumables, tools & tackles for two years for both the department (EMIPH & EMOPH) | |||||
| 4.01 | Welding electrode (3.15, ESAB) | - | Pkts | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.12 MB
BOQ_2428069.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .