Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.1 CrAdmitted-Finance | -0.10% | ₹4.1 Cr | L1 | Admitted-Finance |
| 2 | L1₹4.1 CrAdmitted-Finance NUAPADA DISTRICT | -0.10% | ₹4.1 Cr | L1 | Admitted-Finance |
| 3 | L1₹4.1 CrAdmitted-Finance | -0.10% | ₹4.1 Cr | L1 | Admitted-Finance |
| 4 | L1₹4.1 CrAdmitted-Finance | -0.10% | ₹4.1 Cr | L1 | Admitted-Finance |
| 5 | L1₹4.1 CrAdmitted-Finance | -0.10% | ₹4.1 Cr | L1 | Admitted-Finance |
Tender Value
₹4.3 Cr
EMD Value
₹4.3 L
Closing Date
24 Jun 2026, 5:00 pmClosed
Chief Construction Engineer
RURAL WORKS CIRCLE , BHAWANIPATANA
Construction of Jamgaon to Telenpai (Adar) in the district of Nuapada under Scheme Mukhya Mantri Sadak Yojana (MMSY) for the year 2026-27
2026_CERWI_130380_1
BPT/Online-03 /2026-27
National Competitive Bid
Civil Works - Roads
Percentage
270 days
Nuapada
2 documents required · 2 mandatory
₹10,000
₹4.3 L
Yes
17 Aug 2026
9 Jun 2026
25 Jun 2026
9 Jun 2026
24 Jun 2026
9 Jun 2026
9 Jun 2026 - 23 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m | 525 | Cum | 74.79 | ₹39,264.75 |
| 2 | Providin, laying, spreading & compacting graded stone aggregate to to Wet Mix Macadam specification including pre mixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, laying in uniform layers with paver in sub base/base course on well prepared surface & compacting with vibratory roller to acieve the desired density as per clause 406 of MoSRT & H specifications for road & bridge works.(4th Revision) | 2,008.13 | Cum | 2,951.46 | ₹59,26,915.37 |
| 3 | Providing,supplying,fitting and fixing of 80mm thick interlocking concrete paver block on compacted river coarse sand free from all organic materials and filling the joints with sand including cutting,corbelling, splays whereever necessary to proper size with cost,conveyance,royalities of all materials and as directed by Engineer-in-chief. | 20,081.25 | Cum | 623.38 | ₹1,25,18,249.63 |
| 4 | Earthwork in excavation for foundation of structures in all types of soil as per drawing and technical specification Clause 305 and 1104 of MoRD includding setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto all lead & lift, dressing of sides and bottom and back filling with excavated suitable material upto 3mt. as per direction of Engineer-in-Charge. | 1,642.39 | Cum | 276.89 | ₹4,54,761.37 |
| 5 | Filling sand-Supplying & filling good clean river sand of approved quality including watering to complete saturation & ramming complete with all leads & lifts including cost, conveyance, royalty & taxes of all materials & cost of all labour & T&P required for the work etc. complete as per specification & direction of Engineer in charge. | 480.83 | Cum | 1,224.69 | ₹5,88,867.69 |
| 6 | Plain cement concrete M-15 grade in Foundation complete as per drawing and technical specification. | 376.32 | Cum | 6,507.45 | ₹24,48,883.58 |
| 7 | Plain cement concrete M-15 grade in Sub-Structure complete as per drawing and technical specification. | 875.03 | Cum | 6,610.59 | ₹57,84,464.57 |
| 8 | P.C.C work of M-20 grade with 20mm and down grade black hard granite (crusherbroken) stone chips including hoisting and laying | 656.25 | Cum | 7,180.35 | ₹47,12,104.69 |
| 9R.C.C work of M-25 grade with 20mm and down grade black hard granite (crusherbroken) stone chips including cost, conveyance, royalty & taxes of all materials & cost of all labour & T&P required for the work etc. complete as per specification & direction of Engineer in charge. | |||||
| 9.1 | Foundation | 70.64 | Cum | 7,935.3 | ₹5,60,549.59 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 2.36 MB
Tendernotice_1.pdf
PDF • 1.15 MB
BOQ_593618.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .