Loading…
Loading…
Tender Value
₹56.0 L
EMD Value
₹1.1 L
Closing Date
3 Sept 2026, 12:00 pm
EXECUTIVE ENGINEER RCD ROAD DIVISION GUMLA
EXECUTIVE ENGINEER RCD ROAD DIVISION GUMLA
Replacement of Box Cell Culvert (1-43-0) at 22 Km.of Manjhatoli-Birkera-Kondra Road under Road
2026_CECOM_117623_1
RCD/GUMLA/580/2026-27
Open Tender
Civil Works
Percentage
120 days
Manjhatoli-Birkera-Kondra Road
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹1.1 L
20 Aug 2026
20 Aug 2026
7 Sept 2026
20 Aug 2026
3 Sept 2026
20 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of Structures
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with allk lifts and lead of 1000 metres
(i)Lime/ Cement Concrete
II.By Mechanical means
A.Cement Concrete Grade M-15 & M-20
SOR-2.04 (i) II A | - | M3 | 652.8 | - |
| 2 | Dismantling of Structures
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with allk lifts and lead of 1000 metres
(i)Lime/ Cement Concrete
II Mechanical means
B.Prestressed/ Reinforced cement concrete grade M-20 & above
SOR-2.04 (i)II B | - | M3 | 887 | - |
| 3 | Dismantling of Structures
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with allk lifts and lead of 1000 metres
(iii)Dismantling stone masonry
II.By Mechanical means
A.Dismantling Brick/ Tile work/ rubble masonary/pitching/ etc. by mechanical means
SOR-2.04 (iii)
II
A | 1 | M3 | 134.4 | ₹134.27 |
| 4 | E/W in excavation of foundation trenches in ordinary soil -do-do- all complete as per specification and direction of E/I.
SOR-15.01 B (i) | 1 | M3 | 57.4 | ₹57.34 |
| 5 | Providing P.C.C.M15 in levelling course in foundation -do-do- all complete as per specification and direction of E/I.
SOR-15.11(A) | - | M3 | 4,615.71 | - |
| 6 | Stone masonry work in cement mortar 1:3 in foundation complete as per drawing and technical specifications.
(B)Random Rubble masonry (coursed/uncoursed)
SOR-12.07
(B) | 1 | M3 | 4,576.56 | ₹4,571.98 |
| 7 | Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and technical specifications.
A.Random Rubble Masonry (Coursed/uncoursed)
SOR-13.04
A | 1 | M3 | 4,515.62 | ₹4,511.1 |
| 8 | Plain/Reinforced cement concrete in sub-strucutre complete as per drawing and Technical specifications.
B.PCC Grade M20
(p) Height upto 5m
PCC Grade M20 using batching plant, transit mixer & concrete pump
SOR-13.05
B (p) | - | M3 | 5,286.85 | - |
| 9 | Laying Reinforced Cement Concrete Pipe NP4 / Prestressed Concrete Pipe on First Class Bedding in Single Row .
Laying Reinforced cement concrete pipe NP4 / prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets .
B.1200 mm dia
SOR-9.04 B | - | M | 8,688.74 | - |
| 10 | Construction of Embankment with Material obtained from Borrow pits.
Construction of Embankment with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2.
SOR-3.16 | - | M3 | 129.9 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.68 MB
BOQ_158967.xls
BOQ • 0.34 MB
Tenderdocument.pdf
Tender Documents • 0.84 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].