Loading…
Loading…
Found 19 active tenders
19 results • Latest
Construction of Excise Office Building at Gumla
Earthwork in excavation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance upto 50 M. including all lifts, levelling, ramming the foudation trenches, removing roots of trees, shrubs all complete as per approved design, building specification and direction of E/l.
Renovation of old Gym building and Providing and fixing paver block for courtyard of Girls Dormitories at JNV Gumla (Jharkhand)
DESCRIPTION OF ITEM
Construction of Collapsed boundary wall at southern side along main road of 132/33 KV G/S/S Gumla
Laying and Jointing PVC Pipe. Heading
Construction of PCC Road from Pogdo Bandh to Kailash Oraons House, Block- Kisko, Dist-Lohardaga.
E/w in excavation of foundation trenchese as per designed section in all kinds of soil,including moorum soil,soil mixed with kankar,pebbles and boulders upto 300 mm size and disposal of the same(beyond 50m away from the toe of dam in the country side) within initial lead of 150 M and initial lift of 1.5M all lifts as per specification and direction of E/I.WRD PARTB 5.1.8 PG 98
Construction of PCC Road and Drain at Hamid Nagar from Ajij Ansari House to Tahir Ansari House, Vill- Kuru,Block- Kuru, Dist -Lohardaga
Earth work in excaviation in foundation trenches in ordinary soil (vide classification of soil item A) & disposal of excavated earth as ovrained to a distance upto 50 mm including all lifts, levelling, ramming the foundation trenches, removing roots of trees, shrubs all complete as per approved design, building specification & direction of E/ incharge (BCD 5.1.1)
Installation work of Paver Block at Community Health Center Kuru, Vill- Kuru,Block- Kuru, Dist.-Lohardaga.
Earth work in excaviation in foundation trenches in ordinary soil (vide classification of soil item A) & disposal of excavated earth as ovrained to a distance upto 50 mm including all lifts, levelling, ramming the foundation trenches, removing roots of trees, shrubs all complete as per approved design, building specification & direction of E/ incharge (BCD 5.1.1)